E11: Building India’s Digital Backbone with Sharad Agarwal
Mar 12, 2026 Eric Bell World
Go to PodcastLes.net's YWG2 colocation facility occupies Suite 201 on the second floor of the Somerset Building in downtown Winnipeg.
| Distance | Site | About |
|---|---|---|
| 0.13 miles | Les.net: YWG4 |
Les.net's YWG4 is a colocation suite on the eighth floor of the Air Canada Building at 355 Portage Avenue in downtown Winnipeg. It hosts a Manitoba Internet Exchange switch.
|
| 0.14 miles | Enterprise Data CenterInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 0.18 miles | Manitoba Hydro Telecom Data Centre |
Manitoba Hydro Telecom's data centre occupies the 24th-floor penthouse of Manitoba Hydro Place in downtown Winnipeg. The room hosts carrier networks and a Manitoba Internet Exchange node.
|
| 0.33 miles | Les.net: YWG1 |
Les.net's YWG1 is a small carrier-neutral colocation facility at the company's head office on Portage Avenue East in downtown Winnipeg.
|
| 0.35 miles | XGSC: Global Server Centre |
XGSC's Global Server Centre is a carrier-neutral colocation facility on the fifth floor of the Grain Exchange Building, downtown Winnipeg's main carrier hotel. It hosts the primary node of the Manitoba Internet Exchange (MBIX).
|
| 4.77 miles | Fintech Data CenterInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 4.99 miles | Equinix Winnipeg WI1 |
Equinix WI1 is a two-storey Tier III data centre on Waverley Street in south Winnipeg. MTS built it as MTS Data Centres Waverley in 2015, and Equinix acquired it from Bell in 2020.
|
| 5.74 miles | Education Data CenterInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 6.33 miles | Bell Canada: Winnipeg |
Bell Canada is converting the former Merit Functional Foods plant at 400 Goldenrod Drive in the RM of Rosser, within CentrePort Canada just outside Winnipeg, into an AI data centre for its Bell AI Fabric network.
|
| 6.33 miles | Center GammaInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 6.33 miles | Cerebras: Manitoba |
Cerebras Systems leases AI compute capacity from Bell Canada's Bell AI Fabric network in Manitoba.
|
| 13.15 miles | Jet.AI: Winnipeg Campus |
Jet.AI and Infinite Compute (formerly Consensus Core) are developing a data centre campus north of Île-des-Chênes, about 20 km south of Winnipeg. A small proof-of-concept facility sits on the site. Manitoba's premier refused the proposed hyperscale campus in June 2026.
|
LES.NET (1996) INC. is a Facilities Based IntereXchange Carrier (IXC) head-quartered in Winnipeg, Manitoba, Canada.
LES.NET operates in the MTS Allstream ILEC territory, and is registered with the CRTC as a CLEC, Non-Dominant Carrier, Reseller, and DSL Service Provider.
Principal Owner
Leslie Bester is the president and founder of LES.NET (1996) INC.
Mar 12, 2026 Eric Bell World
Go to Podcast
Jan 15, 2026 Eric Bell Applied Digital
Go to Podcast
Jan 05, 2026 Eric Bell Dallas
Go to Podcast
Sep 04, 2025 Eric Bell Texas
Go to PodcastTell us what you're looking for. We respond within one business day.