Manitoba Data Center Market

Latest Podcast
Manitoba's data centre market centres on Winnipeg, where colocation rooms, an Equinix Tier III facility and Bell's new AI data centre draw on low-cost Manitoba Hydro power. Growth is gated: the province bars new crypto connections, ranks every new load over 5 MW before Hydro will serve it, and has refused hyperscale campuses. Read More

Market Facts

Manitoba Data Center Map

Manitoba Power Growth Over Time

+314% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Largest Providers in Manitoba

Equinix
Site
Power
Operational
1
4.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Bell Canada
Site
Power
Operational
1
1.0
Construction
1
Planned
1
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
2
View Provider
Phoenix Group
Site
Power
Operational
1
3.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
10013580 Manitoba Ltd.
Site
Power
Operational
1
2.5
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider

Largest Data Centers in Manitoba

Location About Total SqFt Power (MW)
Crypto Mining Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset
Equinix Winnipeg WI1
Equinix WI1 is a two-storey Tier III data centre on Waverley Street in south Winnipeg. MTS built ...
NN Request Dataset NN Request Dataset
Jet.AI: Winnipeg Campus
Jet.AI and Infinite Compute (formerly Consensus Core) are developing a data centre campus north o...
NN Request Dataset
XGSC: Global Server Centre
XGSC's Global Server Centre is a carrier-neutral colocation facility on the fifth floor of the Gr...
NN Request Dataset
Les.net: YWG1
Les.net's YWG1 is a small carrier-neutral colocation facility at the company's head office on Por...
NN Request Dataset

Regions in Manitoba

About This Metro

Market Overview

Manitoba is a small data centre market centred on Winnipeg. Most capacity sits in downtown colocation rooms, a few enterprise data centres and one purpose-built Tier III facility. Manitoba Hydro supplies almost all of the province's power from hydroelectric generation, and its industrial rates rank among the lowest in North America. Provincial policy, more than land or fibre, now sets the pace of new development.

Colocation and Interconnection

  • The Grain Exchange Building at 167 Lombard Avenue is Winnipeg's main carrier hotel. Its telecom tenants include Bell, Shaw, TELUS, Zayo and WiBand.
  • XGSC's Global Server Centre in the Grain Exchange Building hosts the primary node of the Manitoba Internet Exchange (MBIX).
  • MBIX also peers at Les.net's YWG2 (294 Portage Avenue) and YWG4 (355 Portage Avenue) suites and at Manitoba Hydro Telecom's data centre atop Manitoba Hydro Place.
  • Equinix WI1 on Waverley Street is the province's largest commercial colocation facility. MTS opened it in 2015 as Manitoba's first Tier III commercial data centre, and Equinix acquired it from Bell in 2020.
  • Valley Fiber's True North Data Center Exchange in Winkler offers a Tier 3-design facility outside the Red River floodway.

AI and High-Performance Computing

  • Bell Canada is converting the former Merit Functional Foods plant in CentrePort Canada, in the RM of Rosser. The building will become an AI data centre for its Bell AI Fabric network.
  • BUZZ HPC, the AI cloud arm of HIVE Digital Technologies, brought an NVIDIA B200 GPU cluster online at Bell AI Fabric in Manitoba in May 2026.
  • Cerebras Systems has contracted AI compute capacity from Bell in Manitoba.
  • In June 2026, Premier Wab Kinew said the province would not support the proposed hyperscale data centre campus near Île-des-Chênes, south of Winnipeg.

Cryptocurrency Mining

  • About 40 crypto mines operate in Manitoba, all on electrical service secured before November 2022.
  • The province paused new crypto connections in November 2022. Since September 2025, regulation bars Manitoba Hydro from serving any new crypto request.

Power and Policy

  • Since September 2025, any request for more than 5 MW goes through two steps. Manitoba Hydro first decides whether supply is feasible. The Minister of Finance then rates the project low, medium or high priority.
  • Manitoba Hydro serves requests in priority order, and decisions cannot be appealed. The rating weighs grid impact, jobs and investment, sovereign AI computing, emissions, and Indigenous and rural benefits.
  • In June 2026 the legislature passed Bill 39. It creates separate rate classes for data centres and crypto miners. It also allows a levy of up to 100% of the bill on loads above 5 MW. It had not been proclaimed as of October 2026.
  • Manitoba Hydro's 2025 Integrated Resource Plan projects a firm capacity shortfall of up to 600 MW by the end of 2030. The plan adds 1,760 MW over ten years, including 750 MW of combustion turbines at Brandon and 600 MW of wind.

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...

Ready to Level up Your
Data Center Strategy?