Equinix Boston BO1

Latest Podcast 74 West Street
Operational
Fully operational facility
Operated by:

Equinix Boston BO1

Short Code: BO1
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

Map and Nearby Locations

74 West Street ( First Floor )
Equinix Sites
Nearby Facilities

Sites within 15 miles of Equinix Boston BO1

Distance Site About
0.12 miles Centersquare Waltham BOS1
Datacenter operational since in 1998. 2 story building Raised Floor: 12" Utility: NSTAR
0.15 miles 600 Winter - Digital Realty
Digital Realty full leased the building to a Triple Net tenant, Cyxtera BO1.
0.26 miles Centersquare: Waltham BO3
1 Story Structure Raised Floor: 24"
0.26 miles 115 2nd - Digital Realty
Digital Realty full leased the building to a Triple Net tenant, Cyxtera BO3
5.97 miles Centersquare: Watertown BOS4
Centersquare's cloud-enabled Watertown data center is located close to the center of Boston, and only 10 miles from Boston Logan International Airport. The facility was originally built in 2002 and then expanded in 2008 to add space, power, and cooling capacity.
6.91 miles 105 Cabot - Digital Realty
3 Story Structure Flood Zone: Outside 100 and 500 Year Flood Plain Seismic Zone 2A
6.98 miles 128 1ST - Digital Realty
Originally built by a telecom company in 2000, this facility has 13 MW of critical IT load that serves a total of 18 customers who are primarily internet based, financial services, and healthcare related companies.
8.04 miles Camber: Bedford, MA
1 Story structure Flood Zone: Outside 100 and 500 Year Flood Plain Seismic Zone 2A N+2 Cooling Plant Redundancy
9.24 miles EdgeConneX Boston
Customer work spaces are available Raised Floor: 30" EdgeConnex has rights to adjacent space to accommodate expansion.
9.44 miles Verizon: Cambridge 89 Fulkerson
Former XO Communications site
9.50 miles Lumen Cambridge 1 (300 Bent)
9.65 miles Cogent: Somerville
9.70 miles Lumen Boston (1 Main)
9.71 miles Evocative Somerville BOS1
Datacenter built in 2009 and expanded in 2013 Two (2) Story structure
9.75 miles AXCELX Somerville
9.76 miles FirstLight Somerville
Located less than one mile from I-93 on the Boston/Somerville line and at the intersection of multiple redundant fiber networks, ColoSpace Somerville offers a combination of convenience to downtown Boston and Cambridge
9.76 miles CoreSite Somerville BO1
9.76 miles Internap Boston
Although Internap is a carrier, the company operates a "carrier neutral" data center. There are a half dozen networks in the site, plus more via the CoreSite Meet-Me-Room
9.88 miles MicroLink: Boston, MA
MicroLink is planning to build a data center in Boston, Massachusetts.
9.92 miles Expedient Boston
10.08 miles Tierpoint Charleston
Located on the Hood Park campus, TierPoint’s Charlestown data center is a short walk from the Sullivan Square MBTA station located near I-93.
11.03 miles Crown Castle One Summer
Markley One Sumer is the landlord for Lightower at this site.
11.03 miles DataBank BOS1
11.03 miles Verizon: One Summer
Markley One Sumer is the landlord for Verizon at this site.
11.06 miles Markley: One Summer Street
Markley's One Summer Street is Boston's carrier hotel. The building is the largest multi-tenant telecommunications facility in New England. Home to over 90 different carriers and network providers, One Summer offers clients unlimited bandwidth, high-density connectivity, unsurpassed infrastructure, abundant and reliable power, and true network diversity
11.06 miles Lumen Boston 1
11.14 miles Equinix Boston BO2
Equinix acquired BO2 as well as 28 other datacenters from Verizon in 2017. It was formerly named Verizon BOS1 Billerica. Constructed in 2001 Construction Type: Slab on grade, concrete
12.77 miles 200 Quannapowitt
The former facility was torn down in 2023.
14.29 miles Prov.net Boston North
Dedicated ½ Cabinet to Multi-cabinet Suites Diverse power feeds 750 KW Generator Redundant (A/B) Distribution
15.98 miles Markley: 90 Bolt Street
In early 2026, Jeffrey D. Markley, CEO of the Markley Group, purchased the industrial property at 90 Bolt Street alongside adjacent industrial plots for a combined $5.6 million.
16.31 miles Markley: Lowell
Markley’s data center in Lowell, MA encompasses 352,000 square feet of highly secured white and mechanical space. In addition to carriers originating at local POPs, the facility offers the benefits of three diverse dark fiber networks connected directly to Markley’s Boston location.
16.35 miles 365 Marlborough, MA
Boston-metro DC originating as a Comdisco Availability Solutions workgroup hotsite (MA-250); operationalized as colo MAR-250 by SunGard after the Nov 2001 Comdisco acquisition; now 365.
16.45 miles Markley: 2 Tanner Street
In early 2026, Jeffrey D. Markley, CEO of the Markley Group, purchased the retired 85-megawatt Tanner Street Generating Station and adjacent industrial parcels on Bolt Street for $5.6 million.
16.77 miles Crown Castle Marlborough
16.83 miles Menlo: 34 St Martin
16.91 miles TierPoint Marlborough
Single story with concrete masonry walls Raised floor design supports 150+ watts/sq ft Office Space Certifications: SSAE 16 SOC1 & SOC2, Type II
16.91 miles Colocation America - Boston
17.16 miles Mass General Brigham
19.21 miles Iron Mountain Boston
BOS-1 security includes background-checked Iron Mountain officers on-site 24x7x365, three-factor access controls, mantraps, and numerous other features.

Equinix Boston BO1 Data Center Photos See all

EQIX BO1 at 74 West St in Waltham
Source: Baxtel
Boston Metro: Average Power Rates
Source: JLL
Equinix cage door
Source: Baxtel

Operating Company

Operated by:

Equinix connects the world’s leading businesses to their customers, employees and partners inside the most interconnected data centers.

318
Facilities
84
Markets
2093MW
Megawatts

News See all

Read Equinix to Reuse Data Center Heat to Warm Homes in Milan
Equinix has partnered with Italian energy company A2A to recover waste heat from its data center campus in Settimo Milanese and feed it into Milan’s district heating network. Under the agreement, E...

Equinix to Reuse Data Center Heat to Warm Homes in Milan

July 10, 2026 Equinix

Equinix has partnered with Italian energy company A2A to recover waste heat from its data center campus in Settimo Milanese and feed it into Milan’s district heating network. Under the agreement, Equinix will design and operate the heat recovery system, while A2A will use four large-scale heat...

Read more
Read Equinix Trials Hydrogen Fuel Cell Technology at Data Center in Ireland
Equinix has launched its first trial of hydrogen fuel cell technology as a replacement for diesel backup generation at a data center in Ireland. Working with ESB and GeoPura, the company has deploy...

Equinix Trials Hydrogen Fuel Cell Technology at Data Center in Ireland

June 19, 2026 Equinix

Equinix has launched its first trial of hydrogen fuel cell technology as a replacement for diesel backup generation at a data center in Ireland. Working with ESB and GeoPura, the company has deployed two hydrogen-powered generators at its DB3 Data Center facility. The 12-week trial will support...

Read more
Read Equinix is Building its Fourth Data Center in Malaysia
Equinix is Building its Fourth Data Center in Malaysia

Equinix is Building its Fourth Data Center in Malaysia

May 12, 2026 Equinix

Equinix will build its fourth data center in Malaysia, KL2, in Kuala Lumpur. The US$190 million facility will house over 2,200 cabinets at full build-out, though its size and IT capacity were not disclosed. Equinix said the new data center will be located less than 1 km from its KL1 facility in...

Read more
Read Equinix Begins Construction on DB7x Data Center in Dublin
Equinix Begins Construction on DB7x Data Center in Dublin

Equinix Begins Construction on DB7x Data Center in Dublin

March 30, 2026 Equinix

Equinix has begun construction on a new $92 million data center in Dublin, Ireland. The DB7x facility will be located in Blanchardstown, near the company’s existing sites in the city. Equinix is allocating $78 million toward high-performance infrastructure for AI workloads and $14 million for its...

Read more
Read EuroCTP Selects Equinix's FR2 Data Center for Equity Trading Consildated Tape
EuroCTP Selects Equinix's FR2 Data Center for Equity Trading Consildated Tape

EuroCTP Selects Equinix's FR2 Data Center for Equity Trading Consildated Tape

January 29, 2026 Equinix

EuroCTP, a new provider of an EU real-time pre and post-trade Consolidated Tape (CT) for financial equity trades, has selected Equinix's FR2 data center to host its 'tape' in Frankfurt, Germany.“Equinix FR2 provides EuroCTP with the ideal foundation to drive growth, ensuring we can reliably meet...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?