Camber: Bedford, MA

Latest Podcast 55 Middlesex Turnpike
Operational
Fully operational facility
Operated by:

Camber: Bedford, MA

Year Built: 2000
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size
  • Update: In September 2025, Digital Realty sold its 106,000 sq ft (9,847 sqm) BOS13 property at 55 Middlesex Turnpike in Massachusetts to local real estate investor Camber Development for $16 million.

Digital Realty acquired the data center in 2010 as part of a three-building portfolio for a total of $375 million.

Building:


  • 1 Story structure
  • Flood Zone: Outside 100 and 500 Year Flood Plain
  • Seismic Zone 2A
  • N+2 Cooling Plant Redundancy
  • Roof: EPDM insulated metal deck
  • Floor Loading: up to 250 lbs/sq ft
  • (2)Turn-KeyFlexTMdatacenters each served by (2) UPS systems configured as 2N
  • 24x7 Onsite Security Personnel

Power:


  • 10 MW Utility Power Capacity
  • 5 MW UPS Power Capacity
  • 2N UPS Redundancy
  • 10 MW Generator Power Capacity
  • Power Density: 100 W/sq ft

Map and Nearby Locations

55 Middlesex Turnpike
Camber Development Sites
Nearby Facilities

Camber: Bedford, MA Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Camber: Bedford, MA

Distance Site
1.56 miles EdgeConneX Boston
3.11 miles Equinix Boston BO2
7.64 miles 200 Quannapowitt
7.86 miles Prov.net Boston North
7.90 miles 600 Winter - Digital Realty
7.94 miles Centersquare Waltham BOS1
8.04 miles Equinix Boston BO1
8.16 miles 115 2nd - Digital Realty
8.16 miles Centersquare: Waltham BO3
8.73 miles Markley: 90 Bolt Street
9.12 miles Markley: Lowell
9.36 miles Markley: 2 Tanner Street
10.63 miles Centersquare: Watertown BOS4
10.80 miles Expedient Boston
11.91 miles Cogent: Somerville
11.96 miles Evocative Somerville BOS1
12.06 miles CoreSite Somerville BO1
12.06 miles Internap Boston
12.06 miles FirstLight Somerville
12.06 miles AXCELX Somerville
12.07 miles Tierpoint Charleston
12.18 miles Verizon: Cambridge 89 Fulkerson
12.29 miles TierPoint Andover
12.31 miles Lumen Cambridge 1 (300 Bent)
12.68 miles Lumen Boston (1 Main)
13.03 miles NaviSite Andover
13.85 miles DataBank BOS1
13.85 miles Crown Castle One Summer
13.85 miles Verizon: One Summer
13.89 miles Markley: One Summer Street
13.89 miles Lumen Boston 1
14.29 miles 105 Cabot - Digital Realty
14.36 miles 128 1ST - Digital Realty
17.58 miles Dynamic Internet Salem

Camber: Bedford, MA Data Center Photos See all

Digital Realty's Data Center in Bedford, MA
Source: DRT
Boston Metro: Average Power Rates
Source: JLL

Operating Company

Operated by:

Camber Development is a Boston-based real estate developer with a targeted focus on the advanced manufacturing, logistics, and life science ecosystem. It develops and operates best-in-class properties to foster its customers’ scientific advancement, technology development, and manufacturing and distribution implementation, and is passionate about serving the unique needs of those developing advanced solutions in Climate Tech, Robotics, AI, and Logistics.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Lightmatter officially becomes a unicorn
Lightmatter officially becomes a unicorn

Lightmatter officially becomes a unicorn

December 19, 2023 Boston

Photonic computing company Lightmatter has now been crowned a Unicorn, raising $155 million at a $1.2 billion valuation. This funding is part of the series C investment round, which helped the company raise $154 million in May, successfully tripling the company’s value at the time. Overall,...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.