Digital Edge: TYO7

Latest Podcast
1-1 Kobunacho Chuou-ku Tokyo Japan 103-0024
Operational
Fully operational facility
Operated by:

Digital Edge: TYO7

Short Code: TYO7
Year Built: 2025
PUE: 1.31
Floors: 8
░░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power

The facility is located less than 300m from the company’s existing TYO2 facility (formerly known as ComSpace I).

According to a Hulic release, the Digital Edge and Hulic companies have formed a joint venture known as DEH1 Co., Ltd for the development, known as the 'Kobunacho Project.' The joint venture will develop, own, and operate the new data center.

Building


  • Colocation space: 2,624 m² (28,239 ft²)
  • Data center capacity: 970 cabinets
  • Building type: Purpose-built, multi-tenant
  • Seismic/flood resistant design: Seismic isolation structure / Raised 1st floor level for counter measure of flood
  • Floor type: Non raised floor (3~6F), Raised floor (7F)
  • Floor load capacity: Total: 15 kN/m²
  • Ceiling height: 5.5m (slab to slab)

Power and Cooling


  • Power and Cooling Density: 5 kVA per cabinet
  • Utility Feeders: 3, same substations
  • UPS Configuration & Redundancy: N+1, parallel redundancy
  • Standby Power Configuration & Redundancy: N+1, 4,000kVA x 3 gas turbine generators
  • Fuel tank Back-up time: 24h
  • Designed PUE: Annual 1.31

Certifications


ISO 14001
ISO 27001
ISO 45001

Map and Nearby Locations:

1-1 Kobunacho Chuou-ku Tokyo Japan 103-0024
Digital Edge DC Sites
Nearby Facilities

Sites within 15 miles of Digital Edge: TYO7

Distance Site About
0.21 miles Digital Edge: Comspace II (TY03)
TYO3 is conveniently located in the vibrant business district of Shinjuku with easy access to major transport
links.
1.89 miles Digital Edge: Tokyo TY01
The center is located in the Musashino plateau (Musashino gravel), built on an extremely Solid ground, resistant to natural and human disasters. Public-sector studies also affirm The location's disaster-resistance.
2.36 miles Digital Edge: Shibuya (SDC)
The facility was acquired in 2021 as part of Digital Edge's US$230 million (JPY26 billion) purchase of five data center assets from Itochu Techno-Solutions (CTC).
2.48 miles Equinix Tokyo TY9
2.51 miles Equinix Tokyo TY10
2.87 miles Digital Edge: Otemachi TYO2
The facility was acquired in 2021 as part of Digital Edge's US$230 million (JPY26 billion) purchase of five data center assets from Itochu Techno-Solutions (CTC).
2.97 miles Telehouse: Tokyo Shibuya
The data center in Shibuya is inside a 15-story high-rise tower and a four-story low-rise tower with a massive 15,000 m2 of dedicated floor space.
3.24 miles AT TOKYO Central Tokyo
AT TOKYO’s 25 megawatts (MW) data center is located at the heart of Tokyo.
3.24 miles NTT Tokyo No 11
3.25 miles Keppel DC: Tokyo 1
Keppel expanded its data center portfolio in July 2024 by purchasing an existing facility in Tokyo for JPY 23.4 billion (approximately $144.8 million).
3.35 miles IDC Frontier: Tokyo Nihombashi
3.45 miles Marunouchi: Otemachi I
3.53 miles KDDI Tokyo Otemachi
3.53 miles NTT Tokyo Otemachi Building
3.59 miles Equinix Tokyo TY4
3.59 miles Colt Ōtemachi
Colt Tokyo Otemachi Data Centre is located in Tokyo’s central business district
3.69 miles Marunouchi: Otemachi II
3.70 miles NTT TK1
3.72 miles Marunouchi
3.73 miles NTT DATA Otemachi
3.78 miles NTT Tokyo 5
The facility is a 1-hour drive from Narita International Airport, and a 2-minute walk from the nearest train station
3.94 miles NTT TK12
4.35 miles Colt KVH Tokyo
4.35 miles Digital Edge: Comspace I (TY02)
Located next to Otemachi – the telecommunications hub of Tokyo – TYO2 is one of the most network dense carrier neutral data centers in the downtown area with access to significant dark fiber capacity.
4.68 miles NTT TK6
4.78 miles NTT TK3
5.19 miles NTT TK4
5.29 miles AT&T Tokyo NRT4
5.41 miles Equinix TY15
TY15 is located about 1km from Equinix TY6/TY7/TY8 data centers. A direct fiber connection to TY2 just 1.5km away makes this new IBX data center a premier connectivity site in Tokyo. The facility has an initial capacity of 1,200 cabinets.
5.65 miles Equinix Tokyo TY6
5.73 miles Equinix Tokyo TY7
5.76 miles Equinix Tokyo TY8
5.80 miles Hyperscale Data Center Request Dataset
6.00 miles Equinix Tokyo TY2
6.02 miles @Tokyo Chuo Center (CC1 & CC2)
6.28 miles Equinix Tokyo TY3
6.37 miles Equinix Tokyo TY11
6.37 miles Equinix Tokyo TY5
6.42 miles SKYY: Koto City
In 2020, AXA IM's data center division acquired a data center in Tokyo's Kota Ward for ¥22bn ($211m). The facility, built by SKYY Developments, spans 20,000 sq m (215,000 sq ft) and houses 2,560 data racks, making it one of Tokyo's largest facilities.
6.54 miles Colt Shiohama
6.58 miles Carrier-Neutral Data Center Request Dataset
Vantage plans another data center on 2.8 acres of land in Tokyo, Japan.
6.60 miles Empyrion: Tokyo JP1
The facility will be AI-ready, span 21,000 sqm across five floors, and will be Tier III carrier-neutral with secured power.
6.64 miles INAP Koto-ku
6.68 miles ESR Group: Ariake
This will be the company's fourth data center in Japan and second in Tokyo. Construction is scheduled to begin in Q2 2026, with operations expected to start by the end of 2028.
6.72 miles IDC Frontier: Tokyo Ariake
Tokyo Ariake Data Center is located in Tokyo Waterfront City, which has been developed as "a disaster-resilient city".
6.84 miles Flow Digital: Tokyo TK7
APAC data center firm Flow Digital Infrastructure has started work on a new campus in Tokyo that will comprise two buildings—TK7 and TK8.
6.89 miles Flow Digital: TK8
This facility will be part of Flow Digital's Tokyo Data Center Campus.
6.97 miles Telecom Center Building
7.26 miles NTT TK9
7.35 miles NTT DATA Mitaka East (TK10)
7.37 miles NTT TK2
7.50 miles NTT Mitaka West
7.76 miles MCC Mitaka: South Block
7.78 miles MCC Mitaka: North Block
7.82 miles SoftBank: Tokyo 4
SoftBank Tokyo No. 4 provides a range of colocation services to businesses.
8.48 miles Deft: Tokyo TY1
8.67 miles INAP Heiwajima Ota-ku
8.67 miles Equinix Tokyo TY1
9.32 miles INAP Edogawa-ku
9.32 miles Canon Nishi-Tokyo
9.52 miles Hyperscale Data Center Request Dataset
10.42 miles ESR Group: Higashikurume
The company acquired a site in Higashikurume, Tokyo, which previously housed three office buildings across 20,900 square meters (225,000 square feet).
10.99 miles NTT TK8
11.59 miles NTT Yokohama 1
13.12 miles DayOne: Fuchu Intelligent Park
The plots cover a total area of 10,970 square meters (118,080 square feet), and the first phase is scheduled to begin operations in late 2026.
13.12 miles IDC Frontier: Tokyo Fuchu
The facility has a gross floor area of 45,419 square meters and contains approximately 4,000 racks.
13.13 miles Telehouse: Tokyo Fuchu
The Telehouse Fuchu data center features earthquake-resistant construction on solid ground.
13.81 miles Digital Edge: Yokohama TY06
The TY06 (YCC North) facility is one of three buildings that make up Digital Edge's Yokohama Computer Center (YCC). The campus is located in Tsuzuki-ku, Yokohama, positioned 5.5 miles (9 kilometers) inland from Tokyo Bay.
13.86 miles Digital Edge: Yokohama TY04
Digital Edge's Yokohama Computer Center (YCC) is situated in Tsuzuki-ku, Yokohama, approximately 5.5 miles (9 kilometers) inland from Tokyo Bay. The campus comprises three buildings.
13.91 miles Digital Edge: Yokohama TY05
The TY05 (YCC East) facility is one of three buildings that make up Digital Edge's Yokohama Computer Center (YCC). The campus is located in Tsuzuki-ku, Yokohama, positioned 5.5 miles (9 kilometers) inland from Tokyo Bay.
14.83 miles Colt: Yoshikawa B2
Colt Data Centre Services plans to develop Yoshikawa B2 data center, which is the second building of a 9.5-acre campus in Yoshikawa.
14.89 miles Colt: Yoshikawa B1
Colt Data Centre Services is developing Yoshikawa B1 data center, which is the first building of a 9.5-acre campus in Yoshikawa.
15.10 miles Mapletree: Tama-shi
Mapletree Industrial Trust has acquired a 98.47 percent stake in a Tokyo mixed-use property through a JPY14.5 billion ($99.5 million) deal with Nagayama Tokutei Mokuteki Kaisha.
15.55 miles Mitsui: Kanagawa
Mitsui & Co., a Japanese conglomerate, invested ¥18 billion (approximately $121 million) to acquire a hyperscale data center.
16.34 miles IDC Frontier: Kanagawa Yokohama
16.72 miles Telehouse: Tokyo Tama 5
KDDI's Tama 5 data center, which opened in July 2020, spans 14 stories and can accommodate 1,500 racks.
17.38 miles Princeton PDG TY1 DC2
This facility is a part of Princeton Digital’s Tokyo data center campus in Japan. Phase 2 of the campus will be ready for service by Q2 2026.
17.40 miles Princeton PDG TY1
TY1 is the first project in the Lendlease Data Centre Partners fund and also PDG's first data center in Japan. Lendlease plans to invest US$490 million, and PDG will contribute US$1 to fully fit out the data center.
17.60 miles ADA: TKW1 DC3
The planned facility is a part of ADA Infrastructure's Tokyo West Campus in Japan.
17.65 miles ADA: TKW1 DC2
In May 2024, Ada Infrastructure started construction on a second building at its Tokyo West campus in Japan.
17.69 miles ADA Tokyo West 1
The campus will comprise three buildings, with Building 1 being a three-story facility spanning 8,700 square meters (93,650 square feet) on a 3,400-square-meter (36,600-square-foot) site.
17.80 miles Telehouse: Tokyo Tama 2
KDDI opened its second building at Telehouse Tokyo Tama in 2013, expanding its suburban data center campus.
17.84 miles Telehouse Tokyo Tama 3
17.85 miles Telehouse: Tokyo Tama 1
KDDI's Tama Campus, which opened in 2008, consists of three data center buildings with a total capacity of 4,300 racks.
17.85 miles Hyperscale Data Center Request Dataset
18.79 miles ADA: Tokyo West 2
GLP's data center subsidiary, Ada Infrastructure, plans to build a massive data center campus in West Tokyo, Japan, consisting of eight five-story buildings.

Digital Edge: TYO7 Data Center Photos (See all)

Rendering of the new TY07 site
Source: Digital Edge DC

Operating Company

Operated by:
25
Facilities
0
Markets
127MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?