Digital Edge: Kota Tinggi, Johor

Land Bank
Land secured for future development
Operated by:

Digital Edge: Kota Tinggi, Johor

Lot Size: 50 acres

Digital Edge, an Asia Pacific data center platform formed by Stonepeak in 2020, agreed to acquire a plot of freehold industrial land in the Bandar Cemerlang Industrial Park in Kota Tinggi, Johor, Malaysia, through a local subsidiary. The land was purchased from a subsidiary of Malaysian property developer Crescendo Corporation under a conditional sale and purchase agreement signed in April 2026, and the parcel is legally designated for data center use. Completion is targeted for the second half of 2027 and remains subject to several conditions, including state consent for the foreign acquisition, planning and data center task force approvals, and confirmation of power arrangements with the national utility. Under the agreement, the seller is responsible for delivering site infrastructure, fibre routes, water allocation, and access roads under staged deadlines.

Map and Nearby Locations

32
Digital Edge DC Sites
Nearby Facilities

Sites within 15 miles of Digital Edge: Kota Tinggi, Johor

Distance Site About
0.91 miles MSFusion Johor Campus
The MSFusion Data Center, operated by Singapore-based cloud firm Megaspeed, is a massive hyperscale project located in the Bandar Cemerlang Industrial Park in Kota Tinggi, Johor.
1.26 miles Digital Edge: Johor Campus
Digital Edge has entered Johor with a RM346.5 million (~$87.3 million USD) acquisition of 50 acres of freehold land in Bandar Cemerlang Industrial Park (BCIP), Kota Tinggi.
4.87 miles Bridge: Johor MY07
Bridge Data Centres has reached a significant power agreement with Tenaga Nasional Berhad (TNB), securing 400 megawatts of electricity for its new hyperscale facility in Johor, Malaysia.
8.08 miles DayOne: Kempas Tech Park
Data center operator GDS is building another data center in Kempas Lama, Johor.
10.04 miles Racks Central: RCJM2A
Racks Central has secured land for two subsequent campuses, RCJM 2A and RCJM 2B in Pasir Gudang, Johor.
10.07 miles Princeton PDG: JH2
PDG's JH2 data center is strategically positioned in Johor's Eco Business Park at Mukim Senai, just 30 km from the company's existing JH1 campus in Sedenak Tech Park.
10.09 miles Racks Central: RCJM2B
Racks Central has secured land for two subsequent campuses, RCJM 2A and RCJM 2B in Pasir Gudang, Johor.
10.18 miles Racks Central: Pasir Gudang RCJM1
Located in the Iskandar Halal Park in Pasir Gudang, RCJM1 is Racks Central’s flagship hyperscale greenfield development in Johor, designed to serve as a high-performance "AI factory."
10.43 miles Bridge: Plentong
Bridge Data Centres has expanded its presence in Johor Bahru through two land acquisitions from Paragon Globe Bhd.
11.50 miles EC33 Johor
11.94 miles Open DC JB1
11.94 miles CSF: Johor CX3
Located in Johor, Malaysia, the CX3 data center offers 2,000 square feet of net data center space within a commercial office building.
12.31 miles Open DC JB2
12.42 miles ThreeInterested in this information?Contact us
12.48 miles Core ParkInterested in this information?Contact us
13.13 miles 1-Net North Data Centre
Constructed in 2016, the 1-Net North Data Center is a 5 story datacenter. It is located in Marsiling in northern Singapore. Situated in a low risk environment. It is specifically designed and constructed to meet the strict security guidelines of Uptime Institute and Monetary Authority of Singapore (MAS).
13.71 miles Global Switch Singapore Woodlands
13.86 miles StarHub North Point Yishun
15.35 miles StationInterested in this information?Contact us
16.29 miles PlusInterested in this information?Contact us
16.67 miles ST Engineering Hub
The ST Engineering Hub serves as the second secure data facility in Singapore for ST Engineering, a Singaporean multinational technology and engineering group.
16.67 miles Empyrion (DoDid) Singapore
In 2021, Empyrion acquired the site and Dodid Pte Ltd.
16.68 miles YTL: Singapore
In 2021, YTL Power International Berhad ("YTL Power”), through its subsidiary YTL Data Center Holdings Pte. Ltd. (“YTL DC”), completed the acquisition of Dodid Pte. Ltd. ("Dodid”), owner of this Tier-3 data center in Singapore.
16.70 miles ST Engineering Digital Hub
The ST Engineering Digital Hub serves as the third secure data facility in Singapore for ST Engineering, a Singaporean multinational technology and engineering group.
17.74 miles Princeton SG1
Situated in the heart of Singapore, 15 minutes from town and 20 minutes from the airport, our data center in Singapore is a strategic location for hyperscalers and enterprises that are looking to expand and require additional capacity. https://princetondg.com/locations/sg1/
17.84 miles NTT: Gelang Patah
NTT Data aims to develop a six buildings campus on a 68.5-acre parcel of land in Gelang Patah, Johor Bahru.
17.91 miles Iron Mountain Singapore SIN-1
Iron Mountain's Singapore SIN-1 site is a purpose-built data center developed to global banking standards with 5.5 MW of power capacity over four 10,000 SF data halls.
17.94 miles ZData: Johor
Tropicana Corporation Berhad's subsidiary, Tropicana Firstwide Sdn Bhd, has entered into a land sale agreement with ZData's Malaysian unit, Computility Technology (Malaysia) Sdn Bhd.
17.94 miles NTT Singapore Serangoon SG1
Launched in 2012, Serangoon Data Center is NTT's first self-built and self-managed data center outside of Japan.
17.98 miles Valley OneInterested in this information?Contact us
Microsoft has acquired 123 acres of land in Kulai, Johor, Malaysia for data center development. The plot, located in Eco Business Park VI in Senai, was purchased from EcoWorld's subsidiary for RM402.3 million ($85.2m).
18.00 miles Kepple DC Singapore 1 (S25)
18.10 miles StarHub Ang Mo Kio
18.28 miles Digital Hyperspace: Johor
AME Elite, a Malaysian real estate company, has agreed to sell 35 acres of land in i-TechValley to Digital Hyperspace Malaysia SDN BHD for RM210.3 million ($2.5 million).
18.45 miles Empyrion: Nusajaya Campus MY1
Empyrion Digital is expanding its pan-Asian footprint with the development of the MY1 campus in Johor, Malaysia.
18.89 miles AirTrunk Johor Bahru JHB1
AirTrunk officially commenced operations at its JHB1 data center campus in Johor in 2024.
19.05 miles AirTrunk: Johor JHB2
AirTrunk plans to develop its second cloud and AI-ready data centre in Malaysia, named AirTrunk JHB2 located in Iskandar Puteri, Johor region
19.21 miles Stack: JHB01B
This facility is a part of Stack Infrastructure's Johor Campus in Malaysia.
19.21 miles Nova Complex: IMS-GT Cluster
Nova Complex, an infrastructure development firm based in Singapore, plans to establish IMS-GT Cluster (Indonesia-Malaysia-Singapore Growth Triangle) in Singapore.
19.27 miles Stack: Johor JHB01
STACK's flagship Johor Bahru campus spans 10.8 hectares and will feature two facilities totaling around 1 million square feet, designed to support cloud and AI/ML workloads.
19.37 miles Epoch Digital: Johor
Epoch Digital was established by Investment firm Actis in November 2022 with a defined go-to-market strategy. Its second project is a huge data center campus located in Johor, Malaysia.
19.39 miles 1AsiaCom New Tech Park
1Asia Data Centre located in the telecom building in Singapore which is known as New Tech Park.
19.40 miles Epsilon Singapore New Tech Park
19.46 miles Nxera: Johor
Singtel's data center subsidiary, Nxera , and Telekom Malaysia (TM) have commenced construction on a new data center facility in Iskandar Puteri, Johor.
19.53 miles Edgnex: Johor
Crescendo Corporation, a Malaysian property developer, has sold 74,360 sqm (800,400 sq ft) of land in the Nusa Cemerlang Industrial Park to Data Cloud Innovation Sdn Bhd for RM120 million ($27.1m).
19.53 miles Cloud CampusInterested in this information?Contact us
Microsoft is further expanding its data center footprint in Malaysia by acquiring another plot of land in Johor.
19.53 miles Digital Halo: Johor
Crescendo Corporation Berhad (CCB) sold a 20.46-acre industrial plot in Johor to Digital Halo Pte Ltd for RM115.87 million ($24.6 million).
19.53 miles STT Johor Campus
The new STT Johor data centre campus will be constructed on over 22 acres of land, offering a development potential of IT power supplied by diverse substations located nearby.
19.91 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Keppel DC is building a massive data center campus on a 50-acre plot of land in Kulai, Johor.
19.96 miles STT Singapore 2
STT Singapore 2 is located in the east of Singapore, in the Defu Industrial Estate that is undergoing redevelopment into a green and sustainable industrial park of tomorrow.
19.96 miles Keppel: Floating Data Center
Keppel has started construction on a floating data center project at Loyang Offshore Supply Base in Singapore, advancing a modular near-shore infrastructure concept designed to reduce land and water constraints while supporting future digital growth.
19.99 miles STT Singapore 3
The seven-story facility at Defu Avenue 1 has an IT load capacity of 15MW, giving total capacity of 40 MW at the STT Defu campus

Digital Edge: Kota Tinggi, Johor Data Center Photos See all

Operating Company

Operated by:
43
Facilities
11
Markets

News See all

Read IFC to Invest Up to $175m in AirTrunk Data Centers in Johor, Malaysia
The International Finance Corporation (IFC) will invest up to $175 million in AirTrunk’s planned data centers in Johor, Malaysia. AirTrunk’s JHB1 facility, which opened in July 2024, currently prov...

IFC to Invest Up to $175m in AirTrunk Data Centers in Johor, Malaysia

July 20, 2026 Malaysia

The International Finance Corporation (IFC) will invest up to $175 million in AirTrunk’s planned data centers in Johor, Malaysia. AirTrunk’s JHB1 facility, which opened in July 2024, currently provides more than 50MW of capacity and is expected to reach over 150MW at full build-out. JHB2,...

Read more
Read Digital Edge Plans 270MWV Data Center Campus Near Mumbai
APAC data center provider Digital Edge is reportedly planning a 270MW data center development near Mumbai, India.According to *The Economic Times*, citing a person familiar with the project, the co...

Digital Edge Plans 270MWV Data Center Campus Near Mumbai

July 06, 2026 Digital Edge DC

APAC data center provider Digital Edge is reportedly planning a 270MW data center development near Mumbai, India.According to The Economic Times, citing a person familiar with the project, the company acquired an approximately 30-acre parcel at the proposed Green Integrated Data Centre Park in...

Read more
Read Kuok Group to Invest €5.3bn in Milan Data Campus
Malaysian conglomerate Kuok Group is considering investing up to €5.3 billion ($6bn) in a 300MW hyperscale data centre campus on the southern outskirts of Milan, according to Teleborsa. Italy's Ind...

Kuok Group to Invest €5.3bn in Milan Data Campus

July 02, 2026 Malaysia

Malaysian conglomerate Kuok Group is considering investing up to €5.3 billion ($6bn) in a 300MW hyperscale data centre campus on the southern outskirts of Milan, according to Teleborsa. Italy's Industry Minister, Adolfo Urso, met with K2 Strategic CEO Meng Wei Kuok on 26 June to discuss the...

Read more
Read Digital Edge Secures Land in Seoul for New 60MW Data Center
Digital Edge is expanding in South Korea with the acquisition of a powered land parcel in Ansan, near Seoul. Backed by a 90MVA power agreement, the site will host SEL5, a planned 60MW data center. ...

Digital Edge Secures Land in Seoul for New 60MW Data Center

June 08, 2026 Digital Edge DC

Digital Edge is expanding in South Korea with the acquisition of a powered land parcel in Ansan, near Seoul. Backed by a 90MVA power agreement, the site will host SEL5, a planned 60MW data center. The facility will feature dual-feed power from two independent 154kV substations and support...

Read more
Read DDSP Secures $283 Million in Funding for Johor Data Center Project
DDSP Secures $283 Million in Funding for Johor Data Center Project

DDSP Secures $283 Million in Funding for Johor Data Center Project

May 30, 2026 Malaysia

Digital Decarbonization Solutions Platform (DDSP), an Asia-Pacific developer of data centers and decarbonized energy solutions, has secured $283 million in green financing for a planned build-to-suit data center campus in Johor, Malaysia. The proposed facility will be a 45MW liquid-cooled campus...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?