AI Edge chip company Kneron raises additional $49m funds
September 30, 2023
San Diego
| Distance | Site | About |
|---|---|---|
| 0.16 miles | Lumen San Diego 2 |
Lumen 8923 Complex Drive is a 3,953 square foot carrier-neutral data center with 1,206 square feet of colocation space in San Diego's Kearny Mesa area, operated by Lumen Technologies and focused on network connectivity services.
|
| 0.19 miles | CariNet | |
| 0.43 miles | LightEdge: San Diego (Lightwave) |
The site was previously known as AIS Lightwave (LWDC), before it was acquired by NFINIT, in 2020 and then in 2022 LightEdge acquired NFINIT.
|
| 0.56 miles | ScaleMatrix San Diego |
The San Diego facility is its own facility, with 25,000 square feet of datacenter space built out today and the option to expand into another 75,000 square feet of space, spread across two buildings on the campus.
|
| 1.48 miles | Lumen San Diego 1 | |
| 1.69 miles | DataBank San Diego Kearney Mesa |
|
| 1.96 miles | EdgeConneX San Diego |
|
| 2.00 miles | Verizon: 5771 Copley |
Former XO facility
|
| 4.30 miles | Mapletree: 7337 Trade |
Mapletree 7337 Trade Street is a 499,402 square foot, five-story data center and office facility built in 1983 on 17 acres in San Diego's Miramar Industrial Park, and owned by Mapletree Redwood Data Centre Trust.
|
| 5.68 miles | Lumen San Diego 3 |
The site was originally a Global Crossing facility
|
| 5.93 miles | LightEdge: San Diego (SDTC) |
The site was previously known as " AIS West San Diego (SDTC)", before it was acquired by NFINIT, in 2020 and then in 2022 LightEdge acquired NFINIT.
|
| 9.97 miles | AT&T San Diego | |
| 11.55 miles | DataBank San Diego SAN1 |
In 2023, Databank expanded the site from 15,000sqft and 1.2 MWs to a total of 60,000 sqft and 7.5 MWs.
|
September 30, 2023
San Diego
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas