Viasat launches new headquarters in London
April 15, 2024
London
In 2009, the the initial 3,330 sqft of data center space were built. An expansion between 2013-2015 added three mezzanine floors within one of the tall film studios, increasing the total data center capacity to 18,000 sq ft gross (approximately 10,000 sq ft of net technical space or 400 cabinets).
Maidstone Studios, built in the early 1980s, originally served as a production facility for the Southern TV regional franchise, notably hosting the filming of the beloved Basil Brush show. The current owners acquired the property in 2003, transforming it into a versatile 150,000 sq ft technical complex that houses TV studios, office spaces, restaurants, and meeting facilities.
| Distance | Site | About |
|---|---|---|
| 7.99 miles | Sota 810 kent Science Park |
|
| 14.70 miles | Level3 Tunbridge Wells | |
| 17.37 miles | Custodian Dartford DA2 | |
| 18.41 miles | Fujitsu: London East (SDC01) |
The Fujitsu London East (SDC01) data center is a Tier III certified facility located in Grays, Essex.
|
| 18.81 miles | Hyperscale Data Center Request Dataset |
Google has acquired a plot of land in Essex, UK, previously used as a racetrack and earmarked for residential developments.
|
April 15, 2024
London
March 29, 2024
London
February 29, 2024
London
January 10, 2024
London
November 18, 2023
London
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas