4.21 miles
|
Wild Rose Power Hub
|
The Wild Rose Power Hub is a large-scale, $10 billion "gigawatt-scale" data center and power generation project located in Rocky View County.
|
|
4.21 miles
|
Beacon Chestermere AI Hub
|
Beacon AI Centers is planning to build a new data center campus known as the Chestermere Artificial Intelligence Hub.
|
|
4.27 miles
|
South HubInterested in this information?Contact us
|
Plexus Technology runs a container bitcoin mining site powered by natural gas generators near Langdon in Rocky View County, Alberta.
|
|
6.89 miles
|
Real Estate Data CenterInterested in this information?Contact us
|
Proposed data centre park on the east edge of Chestermere, just east of Calgary.
|
|
6.91 miles
|
Denvr: Calgary CL3
|
Denvr Dataworks, a Calgary-based AI cloud provider, runs a prefabricated GPU module at Equinix's CL3 data centre in southeast Calgary.
|
|
6.91 miles
|
Equinix Calgary CL3
|
The site was formerly known as "Q9 Calgary 3" which was acquired by Equinix in 2020 from Bell Canada.
|
|
7.28 miles
|
eStruxture Calgary CAL-1
|
eStruxture's first Calgary data centre, in an industrial building in southeast Calgary. Shaw Communications built it in 2015, and eStruxture bought it in 2019 and has expanded it in phases.
|
|
11.12 miles
|
Rogers Calgary DC1
|
The CGY1 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.
|
|
11.18 miles
|
Qu DC: Calgary 1
|
Qu Data Centres' CGY1 is a colocation data centre in the Franklin Atrium building in northeast Calgary. It was one of nine Rogers data centres sold to InfraRed Capital Partners in 2025.
|
|
11.39 miles
|
Equinix Calgary CL2
|
The site was formerly known as "Q9 Calgary 2" which was acquired by Equinix in 2020 from Bell Canada.
|
|
12.04 miles
|
Goldfinch Technology Park
|
A 575-acre data center campus called the Goldfinch Technology Park is being proposed near Calgary, Alberta, by developer Diode Ventures.
|
|
12.77 miles
|
Rogers: Calgary NIDC
|
Rogers runs a network data centre, formerly Shaw's NIDC, in an industrial building in northeast Calgary.
|
|
12.90 miles
|
Arrow: Calgary DC2
|
Arrow Datacenters' DC2 is a carrier-neutral colocation data centre in northeast Calgary and the city's busiest peering point. It links to Arrow's downtown interconnection suite in the 840 7th Avenue SW carrier hotel.
|
|
12.92 miles
|
Rogers: Calgary Shaw Data Centre
|
Rogers runs an internal network data centre on the former Shaw campus in northeast Calgary. Shaw built the purpose-built data centre building between 2011 and 2015, and it passed to Rogers with the 2023 Shaw merger.
|
|
13.25 miles
|
Rigstar Industrial Telecom
|
Rigstar, now RSG Telecom, ran a small data centre on the top floor of Hanover Place in downtown Calgary. The tower was vacated and is being converted to apartments.
|
|
13.39 miles
|
Equinix Calgary CL1
|
Located in Bankers Hall in Calgary's financial district, Equinix CL1 has about 12,900 sq ft of colocation space.
|
|
13.57 miles
|
TNW Watermark Tower
|
TNW Networks (téliPhone) ran a small colocation room in Watermark Tower, a 27-storey office building in downtown Calgary. The room opened in 1999 and has since closed.
|
|
13.58 miles
|
Hosted in Canada - Calgary Watermark
|
HostedInCanada ran a small hosting room in Watermark Tower in downtown Calgary until 2018-2019, when it moved its Calgary data centre to 335 8th Avenue SW.
|
|
13.71 miles
|
Nucleus Calgary
|
Nucleus Information Service, Calgary's first internet provider, ran a small server room at its downtown Calgary office. Fibernetics bought Nucleus in 2014, and the Calgary office has since closed.
|
|
13.82 miles
|
DataHiveTwo
|
DataHive's second downtown Calgary data centre, DataHiveTwo, opened in 2024 on the fourth floor of the Nexen Building at 801 Seventh. The facility spans roughly 9,000 sq ft (836 sqm).
|
|
13.87 miles
|
Cologix: Calgary CGY1
|
US data center firm Cologix acquired this data center from local operator DataHive in 2025. The data center sits within a 21-storey office building built in 1979.
|
|
14.20 miles
|
Rogers Calgary DC2
|
The CGY2 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.
|
|
14.22 miles
|
Qu DC: CGY2
|
Qu Data Centres' CGY2 is a downtown-edge colocation data centre in Calgary's Beltline. It was one of nine Rogers data centres sold to InfraRed Capital Partners in 2025.
|
|
14.35 miles
|
TELUS: Calgary IDC
|
TELUS's Calgary Internet Data Centre occupies a four-storey building in the Sunalta district, just west of downtown Calgary. TELUS opened it in 2001 and has upgraded its power and cooling several times since.
|
|
15.09 miles
|
Hub ProInterested in this information?Contact us
|
Atland Tech Solution plans a gas-powered bitcoin mining and data centre site northwest of Strathmore in Wheatland County, Alberta, next to an existing gas compressor.
|
|
18.65 miles
|
eStruxture CAL-2
|
In 2021, eStruxture announced plans for a second data center in Calgary, Canada that came online in 2023. The new Cal-2 facility spans 93,000 sq ft (8,640 sqm) and has been built to Tier III standards.
|
|
19.03 miles
|
CoreWeave: Calgary CAL-3
|
CoreWeave is the anchor tenant of the first phase of eStruxture's CAL-3 data centre in Rocky View County, just north of Calgary.
|
|
19.03 miles
|
eStruxture: CAL-3
|
Canadian data center operator eStruxture plans to invest more than CA$750 million (US$540.2m) to build CAL-3, a new data center in Calgary, Alberta.
|
|
19.22 miles
|
Rocky View Technology Park
|
The proposed Rocky View Technology Park, a large data center and power plant campus near Calgary, was rejected by Rocky View County councillors in September 2025.
|
|
19.40 miles
|
Prairie Sky: Strathmore
|
Prairie Sky Data Solutions is converting a former cannabis facility in Strathmore, Alberta, into an AI-ready colocation data centre with direct liquid cooling.
|