Equinix Calgary CL2

Latest Podcast
1930 Maynard Rd SE
Operational
Fully operational facility
Operated by:

Equinix Calgary CL2

░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

The site was formerly known as "Q9 Calgary 2" which was acquired by Equinix in 2020 from Bell Canada.

Building

  • Low-rise building with over 73,000 sq. ft of total area
  • Insulated pre-cast concrete panel and steel construction
  • Dedicated and individually secured full cabinets
  • Custom dedicated cage space
  • 36" height
  • Multiple dedicated loading bays to accommodate full-sized trailers

24x7 shipping/receiving capabilities

Compliance:

  • SOC 1 (SSAE-16/CSAE-3416/ISAE-3402) type 2 audits
  • SOC 2, type 2 audits, ISO 27001
  • PCI DSS certified for physical security standards

Power:

  • 100% power availability SLA
  • A+B power paths to all customer racks/cabinets each from independent UPS
  • Multiple generators maintained to a minimum of N+1
  • Multiple UPS maintained to a minimum N+1
  • Minimum 24 hour run time at full capacity
  • Refueling arrangements with multiple fuel providers

Map and Nearby Locations:

1930 Maynard Rd SE
Equinix Sites
Nearby Facilities

Sites within 15 miles of Equinix Calgary CL2

Distance Site About
1.00 miles Rogers Calgary DC1
The CGY1 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.
1.01 miles Qu DC: Calgary 1
The CGY1 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.
2.34 miles Rigstar Industrial Telecom
2.58 miles Equinix Calgary CL1
Located in the heart of Calgary’s financial district, Equinix's CL1 Data centre has 800kVa of critical power capacity and 12,000 sqft of colocation floor space.
2.75 miles TNW Watermark Tower
Built in 1999, TNW's data centre is conveniently located in the Watermark Tower at 530-8th Avenue SW. The Watermark Tower is a 27-story, class “A” office building located in the heart of Calgary’s downtown and retail district.
2.76 miles Hosted in Canada - Calgary Watermark
3.03 miles DataHiveTwo
DataHive’s second location, DataHiveTwo, opened in 2024 at 801 Seventh (Nexen Building). The facility spans roughly 9,000 sq ft (836 sqm).
3.06 miles Cologix: Calgary CGY1
US data center firm Cologix acquired this data center from local operator DataHive in 2025.The data center is situated within a 21-story building constructed in 1979.
3.13 miles Nucleus Calgary
3.59 miles Rogers Calgary DC2
The CGY2 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.
3.61 miles Qu DC: CGY2
The CGY2 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.
4.48 miles eStruxture Calgary CAL-1
5.47 miles Equinix Calgary CL3
The site was formerly known as "Q9 Calgary 3" which was acquired by Equinix in 2020 from Bell Canada.
9.28 miles Beacon Chestermere AI Hub
Beacon AI Centers is planning to build a new data center campus known as the Chestermere Artificial Intelligence Hub.
10.18 miles Real Estate Data Center Request Dataset
11.11 miles eStruxture CAL-2
In 2021, eStruxture announced plans for a second data center in Calgary, Canada that came online in 2023. The new Cal-2 facility spans 93,000 sq ft (8,640 sqm) and has been built to Tier III standards.
13.73 miles eStruxture: CAL-3
Canadian data center operator eStruxture plans to invest more than CA$750 million (US$540.2m) to build CAL-3, a new data center in Calgary, Alberta.
14.41 miles Beacon Langdon AI Hub
Beacon Data Centres' first project is a 946-acre campus near Indus, east of Calgary and close to Langdon.
14.83 miles Rocky View Technology Park
The proposed Rocky View Technology Park, a large data center and power plant campus near Calgary, was rejected by Rocky View County councillors in September 2025.
14.98 miles Wild Rose Power Hub
The Wild Rose Power Hub is a large-scale, $10 billion "gigawatt-scale" data center and power generation project located in Rocky View County.
17.67 miles Qu DC: CGY3
The CGY3 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.
17.68 miles Rogers Calgary DC3 Airdrie
The CGY3 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.

Equinix Calgary CL2 Data Center Photos (See all)

Equinix cage door
Source: Baxtel

Operating Company

Operated by:

Equinix connects the world’s leading businesses to their customers, employees and partners inside the most interconnected data centers.

313
Facilities
45
Markets
2035MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your