Stack Secures Green Financing for Data Center in Tokyo
October 27, 2025
Tokyo
GLP's data center subsidiary, Ada Infrastructure, plans to build a data center campus in East Tokyo, consisting of three four-story data center buildings. The campus will feature an N+1 UPS distributed redundant and N+1 closed loop air-cooled chiller plant.
| Distance | Site | About |
|---|---|---|
| 0.04 miles | Carrier-Neutral Data Center Request Dataset |
This facility is part of ADA Infrastructure's Tokyo East Campus in Tokyo.
|
| 0.10 miles | Carrier-Neutral Data Center Request Dataset |
This facility is part of ADA Infrastructure's Tokyo East Campus in Tokyo.
|
| 0.28 miles | IIJ: Shiroi DCC |
Japanese internet and data center company IIJ is expanding its Shiroi data center campus, situated east of Tokyo in Shiroi City, Chiba Prefecture.
|
| 0.33 miles | IIJ: Shiroi Bldg 3 |
Dubbed "Phase 3," this expansion will add about 1,000 racks to Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus.
|
| 0.35 miles | IIJ: Shiroi Bldg 2 |
This facility, located within Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus in Chiba Prefecture, provides space for 1,100 racks across 8,000 square meters (86,110 sq ft).
|
| 0.38 miles | IIJ: Shiroi Bldg 4 |
This facility will be part of Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus.
|
| 0.74 miles | Colt: Inzai 5 |
Colt is building Inzai 5 Campus on a 2.5 acre site in Chiba, Tokyo.
|
| 0.97 miles | Colt Tokyo Inzai |
The Colt campus in Chiba was opened in 2011 and hosts three facilities
|
| 1.00 miles | Colt: Inzai 2 |
This facility is a part of Colt's Inzai campus in Tokyo.
|
| 1.01 miles | Colt: Inzai 3 |
This facility is a part of Colt's Inzai campus in Tokyo.
|
| 1.06 miles | MC Digital Realty (NRT12) |
NRT12 is designed to offer high-density power of up to 70kW per rack
|
| 1.12 miles | MC Digital Realty: NRT14 |
Digital Realty’s NRT14 is a 31MW data center at its Inzai campus near Tokyo, marking the third building in the development and bringing the site to ~104MW as an AI-optimized facility that became operational in April 2026.
|
| 1.27 miles | Colt Inzai 4 |
Known as Inzai 4 and set on a site area of 8,750 sqm (94,185 sq ft), the facility is already 100 percent pre-let.
|
| 1.29 miles | MC Digital Realty-Inazi (NRT10) |
|
| 1.36 miles | Equinix: TY13x |
Equinix opened a new hyperscale data center, TY13x, in Tokyo, Japan in 2023. The facility is located in the Inzai region, adjacent to the existing TY12x data center.
|
| 1.37 miles | Hyperscale Data Center Request Dataset | |
| 1.38 miles | Hyperscale Data Center Request Dataset | |
| 1.38 miles | Hyperscale Data Center Request Dataset | |
| 1.38 miles | Equinix TY12x |
|
| 2.13 miles | Goodman: Shirakami |
The Shirakami Data Centre developed by Goodman Group is located in Inzai City, Chiba Prefecture, within the Goodman Business Park—a major data center cluster about 50 kilometers east of central Tokyo.
|
| 2.17 miles | Hyperscale Data Center Request Dataset | |
| 2.17 miles | STT Tokyo 1 |
STT Tokyo 1 is the first of two buildings in STT GDC's data centre campus, supporting the demand for critical digital infrastructure in Japan.
|
| 2.27 miles | STT Tokyo 2 |
STT Tokyo 2 is the second of two buildings in STT GDC's data center campus
|
| 2.62 miles | NTT: Shiroi SHR1 |
The first data center on the campus, the Shiroi Data Center (SHR1) is expected to be completed by April 2027. The building will support AI, cloud computing, and the next generation of digital services.
|
| 2.88 miles | ADA: Tokyo East 2 |
GLP's data center subsidiary, Ada Infrastructure, plans to build a data center campus in East Tokyo, consisting of six four-story data center buildings. The campus will feature an N+1 UPS distributed redundant and N+1 closed loop air-cooled chiller plant.
|
| 3.13 miles | STACK TKY01 |
Stack Infrastructure completed their first Tokyo facility in 2024. The campus, situated in the Inzai District of Greater Tokyo, was developed collaboratively with IPI Partners and Oaktree Capital Management.
|
| 3.16 miles | STACK: TKY01B |
This facility is part of Stack Infrastructure's first campus in Tokyo, Japan.
|
| 3.32 miles | AirTrunk: TOK1 DC7 |
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
|
| 3.33 miles | AirTrunk: TOK1 DC6 |
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
|
| 3.36 miles | MC Digital: Tokyo Connected Campus @ Inzai | |
| 3.36 miles | AirTrunk: TOK1 DC5 |
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
|
| 3.38 miles | AirTrunk Tokyo TOK1 |
AirTrunk’s first data centre in Japan, AirTrunk TOK1 in Inzai near Tokyo, officially opened its doors in November 2021.
|
| 3.40 miles | AirTrunk: TOK1 DC3 |
This facility is part of AirTrunk's Tokyo 1 campus in Japan.
|
| 3.42 miles | AirTrunk: TOK1 DC2 |
This facility is part of AirTrunk's Tokyo 1 campus in Japan.
|
| 3.47 miles | AirTrunk: TOK1 DC4 |
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
|
| 14.45 miles | Colt: Yoshikawa B2 |
Colt Data Centre Services plans to develop Yoshikawa B2 data center, which is the second building of a 9.5-acre campus in Yoshikawa.
|
| 14.49 miles | Colt: Yoshikawa B1 |
Colt Data Centre Services is developing Yoshikawa B1 data center, which is the first building of a 9.5-acre campus in Yoshikawa.
|
| 14.66 miles | INAP Edogawa-ku | |
| 17.56 miles | SoftBank: Tokyo 4 |
SoftBank Tokyo No. 4 provides a range of colocation services to businesses.
|
| 17.57 miles | NTT TK9 | |
| 17.66 miles | NTT TK2 | |
| 18.26 miles | INAP Koto-ku | |
| 18.29 miles | Empyrion: Tokyo JP1 |
The facility will be AI-ready, span 21,000 sqm across five floors, and will be Tier III carrier-neutral with secured power.
|
| 18.46 miles | Flow Digital: TK8 |
This facility will be part of Flow Digital's Tokyo Data Center Campus.
|
| 18.50 miles | Flow Digital: Tokyo TK7 |
APAC data center firm Flow Digital Infrastructure has started work on a new campus in Tokyo that will comprise two buildings—TK7 and TK8.
|
| 18.82 miles | Colt Shiohama |
|
| 19.31 miles | NTT TK4 | |
| 19.36 miles | NTT TK6 | |
| 19.49 miles | Equinix Tokyo TY3 | |
| 19.49 miles | Equinix Tokyo TY5 | |
| 19.75 miles | Digital Edge: Comspace I (TY02) |
Located next to Otemachi – the telecommunications hub of Tokyo – TYO2 is one of the most network dense carrier neutral data centers in the downtown area with access to significant dark fiber capacity.
|
| 19.78 miles | NTT TK12 | |
| 19.86 miles | NTT TK3 | |
| 19.86 miles | NTT Tokyo 5 |
The facility is a 1-hour drive from Narita International Airport, and a 2-minute walk from the nearest train station
|
| 19.89 miles | SKYY: Koto City |
In 2020, AXA IM's data center division acquired a data center in Tokyo's Kota Ward for ¥22bn ($211m). The facility, built by SKYY Developments, spans 20,000 sq m (215,000 sq ft) and houses 2,560 data racks, making it one of Tokyo's largest facilities.
|
Founded in 2023 by GLP, an APAC real estate firm, Ada Infrastructure is an data center company.
Currently, Ada Infrastructure is building seven active campuses located in Japan, the UK, and Brazil, with a total power capacity of over 850 MW and an additional 1,500 MW projected in their global expansion plans.
October 27, 2025
Tokyo
May 31, 2024
Ada Infrastructure
September 25, 2023
Ada Infrastructure
September 22, 2023
Ada Infrastructure
February 22, 2023
AirTrunk Tokyo TOK2
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas