West Texas Data Center Market

Latest Podcast

The West Texas data center market is located in the state of Texas and within South Central US. West Texas has 174 facilities.

The top providers in West Texas are Crusoe (14 sites) and IREN with 11 facilities . The most popular facilities are Lumen El Paso 1 and Lumen El Paso 1.

Read More

Market Facts

West Texas Data Center Map

West Texas Power Growth Over Time

+424% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Largest Providers in West Texas

Crusoe
Site
Power
Operational
4
526.0
Construction
10
Planned
4
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
14
View Provider
IREN
Site
Power
Operational
2
250.0
Construction
9
Planned
2
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
11
View Provider
OpenAI
Site
Power
Operational
1
215.0
Construction
5
Planned
6
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
1
Decommissioned
0
Totals
6
View Provider
Hut 8 Corp
Site
Power
Operational
5
816.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
5
View Provider

Largest Data Centers in West Texas

Location About Total SqFt Power (MW)
IREN: Childress, TX
The site is directly connected to the ERCOT electricity grid via a 345kV transmission connection ...
NN Request Dataset
Hut 8: McCamey, TX NN Request Dataset
Station TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset
Cipher Digital: Odessa
Cipher mining's Odessa data center (the Odessa Facility), which is its wholly owned 207 megawatts...
NN Request Dataset
Global RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset NN Request Dataset

Regions in West Texas

Data Center Events in West Texas See all

1 events
Event Starts in Details
227 days
View Permian Power Conference 2027
Organized by:
The Power Connection
Type:
Data Center Power
Description:

The Permian Power Conference is a two-day executive gathering held June 7–8, 2027, at the Horseshoe Arena in Midland, Texas. Produced by The Power Connection, the conference connects power generators, electric utilities, and oil and gas producers with data center developers, artificial intelligence infrastructure operators, and infrastructure financiers. The forum addresses regional power infra...

About This Metro

West Texas is a loosely defined region in the U.S. state of Texas, generally encompassing the arid and semiarid lands west. The area is rich with oil and gas deposits. 

Related News See all

Read Google Expands Voltus Capacity Deal To More Than 1GW In PJM
Google will buy 1,070 MW of additional flexible capacity from Voltus in the PJM grid region. The companies [announced](https://www.voltus.co/press/google-voltus-1gw) the expansion of their Bring Yo...

Google Expands Voltus Capacity Deal To More Than 1GW In PJM

October 23, 2026 Google

Google will buy 1,070 MW of additional flexible capacity from Voltus in the PJM grid region. The companies announced the expansion of their Bring Your Own Capacity agreement on Oct. 22, adding 1,070 MW to the 100 MW they committed in June. Voltus aggregates flexible capacity from homes and...

Read more
Read Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses
[Vantage](https://baxtel.com/data-centers/vantage-data-centers) has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to ...

Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses

October 22, 2026 Vantage Data Centers

Vantage has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to deploy across its hyperscale data center campuses. The agreement, announced Oct. 21, delivers medium-voltage grid power straight to 800 volts DC, cutting...

Read more
Read Crusoe Takes 40MW Second Phase At Polar's Hydro-Powered Norway Campus
[Crusoe](https://baxtel.com/data-centers/crusoe) will take a second, larger building at [Polar Data Centers](https://baxtel.com/data-centers/polar-dc)' Tørdal campus in Norway. Polar announced the ...

Crusoe Takes 40MW Second Phase At Polar's Hydro-Powered Norway Campus

October 22, 2026 Crusoe

Crusoe will take a second, larger building at Polar Data Centers' Tørdal campus in Norway. Polar announced the expansion on Oct. 21 (announcement). The new building, DRA02, will add 40MW of liquid-cooled critical IT capacity on hydroelectric power and is due online in late 2027. Crusoe plans to...

Read more
Read Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia
Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The [Development of Regional Impact application](https://dca....

Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia

October 22, 2026 Microsoft Azure

Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The Development of Regional Impact application covers 349 acres at 0 Huffaker Road and 1,659,000 square feet of floor space. Microsoft owns the land, bought in...

Read more
Read AEP And X-energy Study 960MW SMR Plant To Power Amazon In Indiana
X-energy and American Electric Power will study a 960 MW advanced nuclear plant at a retired coal station in Sullivan County, Indiana, with Amazon funding development work and positioned to buy the...

AEP And X-energy Study 960MW SMR Plant To Power Amazon In Indiana

October 20, 2026 Amazon AWS

X-energy and American Electric Power will study a 960 MW advanced nuclear plant at a retired coal station in Sullivan County, Indiana, with Amazon funding development work and positioned to buy the plant's output. The companies announced a joint development agreement on Oct. 19 covering...

Read more
Read Entergy Adds 440MW Solar PPA For Google West Memphis Expansion
Entergy Arkansas plans roughly $600 million of new generation and transmission for [Google](https://baxtel.com/data-centers/google)'s data center campus in [West Memphis](https://baxtel.com/data-ce...

Entergy Adds 440MW Solar PPA For Google West Memphis Expansion

October 20, 2026 Google

Entergy Arkansas plans roughly $600 million of new generation and transmission for Google's data center campus in West Memphis, Arkansas, with Google covering the cost. The utility announced a second phase of its service agreement on Oct. 19 that adds a 440 MW solar contract and two battery...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...

Ready to Level up Your
Data Center Strategy?