Overview
Baxtel's Allentown (Lehigh Valley) region covers Lehigh and Northampton counties, including Allentown, Bethlehem and Easton. It sits inside the Philadelphia market, about an hour north of Center City. The valley mixes established colocation halls with a new wave of AI campuses on industrial land. Power delivery and local approvals decide which proposals get built.
History
The valley's data-center story starts with corporate research. Bell Labs and AT&T built the TekPark campus in Breinigsville in 1987, and Lucent and Agere later ran it. TierPoint turned TekPark into its largest Pennsylvania data center. TierPoint bought the campus land in 2025.
TierPoint also entered Bethlehem when it bought Windstream's data-center business in December 2015. Other sites closed as corporate owners moved to colocation and cloud. DataBridge's Allentown site closed in 2020, and Flexential left its Roble Road data center in 2026. The Serfass Companies bought that building and markets it for redevelopment.
Large-scale demand arrived in 2025 and 2026. CoreWeave leased space at TekPark, and PPL filed for a second 69 kV source to the campus. Developers then proposed AI campuses across both counties. Air Products dropped its Cetronia Road plan in August 2026 after the zoning board denied it.
The Market Today
The TekPark campus remains the valley's anchor. TierPoint runs its Breinigsville halls and is building out a fifth building for larger tenants. TierPoint also runs two smaller data centers in Bethlehem. PPL runs its own data and operations center in Allentown.
The pipeline holds several large campuses. Edged Energy plans Project Atlas near Allentown, and Quantm, Paxos and Prologis have filed plans of their own. Talen Energy plans a data center at its Martins Creek power plant. A separate developer seeks a large campus in Upper Mount Bethel Township. Most of these projects still need zoning, land-development or utility approvals.
Advantages
-
Utility base. PPL Electric Utilities has its headquarters in Allentown and serves most of the valley.
-
Location. Allentown sits about 90 miles from New York City and 60 miles from Philadelphia, on long-haul fiber routes.
-
Industrial land. Former steel, manufacturing and warehouse sites offer large parcels near substations.
-
Powered buildings. TekPark offers powered space that AI tenants can occupy before new campuses finish.
-
Tax treatment. Qualifying data-center equipment is exempt from state sales and use tax.
Challenges
-
Local zoning. Allentown and several townships adopted data-center rules in 2026. Many now treat data centers as a conditional use with extra review.
-
Denials. The zoning board denied the Cetronia Road campus in 2026, and other plans face validity challenges.
-
Grid upgrades. Large loads wait on new PPL lines and substations. TekPark's second 69 kV source enters service in 2027.
-
Large-load tariff. The Pennsylvania Public Utility Commission (PUC) set a model tariff in May 2026 for loads above 50 MW. It guides utilities to require collateral, minimum bills and upfront payment for grid upgrades.
Trends
-
AI tenants in existing halls. CoreWeave's TekPark lease shows AI clouds taking powered space while new campuses wait for power.
-
Enterprise exits. Corporate and older colocation sites close or convert, as at Roble Road.
-
Power-plant campuses. Generators such as Talen plan data centers beside their own plants.
-
Rules before projects. Municipalities write data-center ordinances as proposals arrive, which slows early filings.
Power and Policy
PJM Interconnection runs the grid. PPL Electric Utilities serves most of Lehigh and Northampton counties, and Met-Ed serves part of the Slate Belt. The PUC regulates both utilities. Its May 2026 large-load order guides how they price new loads above 50 MW. The Department of Environmental Protection (DEP) issues air permits for backup generators.