0.17 miles
|
QTS: Suwanee 1 DC1
|
QTS Suwanee 1 DC1 is a 385,000 sq. ft. data center and office building at 300 Satellite Blvd NW, the first of two buildings on the QTS Suwanee 1 campus in the north suburbs of Atlanta.
|
|
0.26 miles
|
QTS: Suwanee 1 Expansion
|
Suwanee 1 Expansion holds the future capacity QTS plans for its Suwanee 1 campus in Suwanee, Georgia, beyond the two existing buildings.
|
|
0.36 miles
|
QTS: Suwanee 1 DC2
|
QTS Suwanee 1 DC2 is a 376,900 sq. ft. former Hewlett-Packard data center at 120 Satellite Blvd NW that QTS bought from DXC Technology in November 2022.
|
|
5.49 miles
|
PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
5.70 miles
|
Fiserv: Johns Creek
|
|
|
9.55 miles
|
Flexential Atlanta-Norcross 1
|
The Norcross data center features a cloud node on-site.
|
|
9.67 miles
|
Flexential Atlanta-Norcross 2
|
Flexential plans to expand its Atlanta presence through development of Atlanta – Norcross 2 at 2755 Northwoods Parkway in Norcross, Georgia. The project extends the company’s existing Norcross footprint and is designed to support enterprise and AI workloads with a targeted launch in the first half of 2028.
|
|
9.82 miles
|
NTT DATA: Alpharetta (ex-UPS Windward)
|
NTT DATA owns and runs the former UPS Windward data center on McFarland Parkway in Alpharetta, which still supports UPS. The building opened in the mid-1990s.
|
|
10.24 miles
|
South TowerInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.63 miles
|
Strategic Datasphere: Alpharetta, Georgia
|
Strategic Datasphere owns a 165,000 sq ft, Tier IV-equivalent enterprise data center in Alpharetta, built in 1999 for a financial services company. The building is fully leased to two investment-grade tenants.
|
|
10.76 miles
|
PureColo: Alpharetta (1001 Windward)
|
1001 Windward Concourse is a 184,553 sq ft data center in Alpharetta, built in the 1980s for Continental Telephone and later run by GE. PureColo, a Carrier Connect Data Solutions company, leased the whole building from Mapletree Industrial Trust in October 2026.
|
|
11.35 miles
|
Flexential Atlanta-Alpharetta
|
Flexential's Alpharetta site is a former Peak 10 facility.
|
|
11.43 miles
|
ADP: Alpharetta DC1
|
|
|
11.44 miles
|
AT&T: Alpharetta (North Point)
|
|
|
11.50 miles
|
Equinix Atlanta AT5
|
Former Verizon data center in Norcross that Equinix acquired in 2017. Equinix closed AT5 on June 30, 2024.
|
|
11.73 miles
|
Stack: ATL01B
|
Planned second building on STACK's Alpharetta ATL01 campus: a two-story, 133,000 sq ft data center on a 6-acre parcel next to ATL01A on Webb Bridge Road.
|
|
11.80 miles
|
Stack: ATL01A
|
STACK's original ATL01 building: a single-story, 105,000 sq ft data center at 3200 Webb Bridge Road in Alpharetta, built by T5 Data Centers as T5@Atlanta and acquired by STACK in 2019.
|
|
12.02 miles
|
GI Partners: Alpharetta
|
This was a former Lincoln Rackhouse facility. In 2025, GI Partners paid $253M for 4905 North Point Parkway, a 185K SF data center, from Lincoln Rackhouse and Principal Asset Management.
|
|
12.10 miles
|
Lincoln: Alpharetta, GA
|
Lincoln Property Company owns and operates this turnkey data center at 2525 Westside Parkway in Alpharetta, in the Atlanta metro. The 240,835 sq ft building has three data halls on 39.2 acres.
|
|
12.11 miles
|
365 Alpharetta
|
Purpose-built in 1999 as SunGard's ATL-11650 single-tenant facility, this 77,300 sq ft Alpharetta data center is now operated by 365 Data Centers. Mapletree Industrial Trust bought the building in 2021.
|
|
12.16 miles
|
AT&T: Alpharetta (Great Oaks Way)
|
|
|
12.64 miles
|
Apotech: Atlanta 1
|
Apotech ATL-1 is an operational Tier III colocation facility in Alpharetta, in greater Atlanta. The 88,000 sq ft building is served by two Georgia Power substations.
|
|
13.26 miles
|
Lumen Doraville 1
|
|
|
16.85 miles
|
Alembic: Dunwoody (40 Perimeter Center)
|
|
|
16.85 miles
|
Internap Atlanta: 40 Perimeter Center
|
Internap (now HorizonIQ) leased colocation space at 40 Perimeter Center East in Dunwoody from 2017. The building is now being renovated for a new operator.
|