Rowan: AUS04

Latest Podcast 20300 SE H K Dodgen Loop
Under ConstructionPlanned
Multi-phase construction project
Operated by:

Rowan: AUS04

Year Planned: 2028
Utility Provider: Oncor
Ownership: Rowan Digital Infrastructure owns the real estate.

Sites leasing space from Rowan Digital Infrastructure:

  • Hyperscale Data CenterInterested in this information?Contact us

Project Stampede is Rowan Digital Infrastructure's second data center project in Temple: two buildings on about 270 acres in Synergy Park, between the BNSF rail line and Loop 363 in southeast Temple. Rowan says the project will be similar in size and scale to its Project Temple campus, and that it is fully leased to a leading U.S. technology company. Site grading began in 2026. ERCOT reclassified the project's grid connection as studied load in September 2026, and Rowan has challenged the decision at the Public Utility Commission of Texas.

Site History

  • October 2026: Rowan filed a complaint at the Public Utility Commission of Texas over ERCOT's reclassification of the project's load.
  • September 2026: ERCOT reclassified the project from base load to studied load.
  • April 2026: Construction stormwater coverage for the site began.

Map and Nearby Locations

20300 SE H K Dodgen Loop
Rowan Digital Infrastructure Sites
Nearby Facilities

Rowan: AUS04 Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Rowan: AUS04

Distance Site
0.00 miles Hyperscale Data CenterInterested in this information?Contact us
1.54 miles Rowan: Ranger
1.76 miles Rowan: Moriah DC
2.48 miles Rowan: AUS01
2.48 miles Hyperscale Data CenterInterested in this information?Contact us
2.88 miles Rowan: AUS02
2.88 miles Hyperscale Data CenterInterested in this information?Contact us
3.32 miles Rowan: AUS03
4.47 miles Connect Data Centers: Temple 1
4.51 miles Real Estate Data CenterInterested in this information?Contact us
5.20 miles Campus OneInterested in this information?Contact us
19.11 miles CampusInterested in this information?Contact us
19.13 miles SB Energy: Milam County 2
19.25 miles West PointInterested in this information?Contact us
19.26 miles SB Energy: Milam County 1

Operating Company

Operated by:

Rowan Digital Infrastructure is a US data center developer that designs and delivers hyperscale campuses for large cloud and AI customers. The company is part of Quinbrook Infrastructure Partners and began in 2020 as a joint venture with Birch Infrastructure, and has been referred to as Rowan Green Data.

Its current US pipeline includes three campuses at the Quantum Frederick park in Maryland, the Cinco campus near San Antonio, Texas, a site in Temple, Texas, and the Percheron campus in Oregon. Verified capacity figures include a 300 MW Percheron plan in Morrow County, Oregon, and a 300 MW Cinco campus in Medina County, Texas.

Rowan Digital Infrastructure History:

  • In August 2025, broke ground on the 300 MW Cinco hyperscale campus outside San Antonio, Texas.
  • In February 2025, closed approximately $1.24 billion in construction financing for the second phase of its Maryland campus at TPG’s Quantum Frederick site.
  • Founded as Rowan Green Data in 2020 via a joint venture between Quinbrook Infrastructure Partners and Birch Infrastructure.
0
Facilities
0
Markets

News See all

Read Sabey Data Centers Pilots HVO Diesel Replacement at Austin Data Center
[Sabey Data Centers](https://baxtel.com/data-centers/sabey-data-centers) has started a pilot using hydrotreated vegetable oil (HVO) as a diesel replacement in backup generators at its Austin campus...

Sabey Data Centers Pilots HVO Diesel Replacement at Austin Data Center

October 30, 2026 Sabey Data Centers

Sabey Data Centers has started a pilot using hydrotreated vegetable oil (HVO) as a diesel replacement in backup generators at its Austin campus. The company is testing the renewable fuel as the primary fuel source for those generators, according to Sabey's announcement. Sabey says the pilot...

Read more
Read Big Watt, PowerHouse Win Taylor Approval for 1GW Texas Data Center Campus
Taylor City Council voted 5-0 on Oct. 8 to approve a development agreement with Big Watt Digital and PowerHouse Data Centers for the Taylor Technology Campus, a 664-acre hyperscale project immediat...

Big Watt, PowerHouse Win Taylor Approval for 1GW Texas Data Center Campus

October 15, 2026 PowerHouse Data Centers

Taylor City Council voted 5-0 on Oct. 8 to approve a development agreement with Big Watt Digital and PowerHouse Data Centers for the Taylor Technology Campus, a 664-acre hyperscale project immediately east of the city that could reach one gigawatt of capacity. The joint venture announced the...

Read more
Read Big Watt, PowerHouse Win Approval for 1GW Behind-the-Meter Texas Campus
Taylor City Council voted 5-0 on Oct. 8 to approve a development agreement with Big Watt Digital and PowerHouse Data Centers for Taylor Technology Campus, a 664-acre data center and power project e...

Big Watt, PowerHouse Win Approval for 1GW Behind-the-Meter Texas Campus

October 15, 2026 PowerHouse Data Centers

Taylor City Council voted 5-0 on Oct. 8 to approve a development agreement with Big Watt Digital and PowerHouse Data Centers for Taylor Technology Campus, a 664-acre data center and power project east of the city that could reach one gigawatt of capacity. In a joint press release, the partners...

Read more
Read Taylor Approves 1GW Gas-Fired Data Center Campus for Big Watt, PowerHouse
Taylor City Council voted 5-0 on Oct. 8 to annex and approve a development agreement for Taylor Technology Campus, a 664-acre hyperscale project east of Taylor that Big Watt Digital and PowerHouse ...

Taylor Approves 1GW Gas-Fired Data Center Campus for Big Watt, PowerHouse

October 15, 2026 PowerHouse Data Centers

Taylor City Council voted 5-0 on Oct. 8 to annex and approve a development agreement for Taylor Technology Campus, a 664-acre hyperscale project east of Taylor that Big Watt Digital and PowerHouse Data Centers say could support up to one gigawatt. The partners announced the approval in a Business...

Read more
Read Project Longhorn Files $366M First Building at Anthropic-Linked Texas Campus
The first data center building at the 2,842-acre Cedar Creek campus being developed by [Pacifico Energy](https://baxtel.com/data-centers/pacifico-energy) and [BlackChamber Group](https://baxtel.com...

Project Longhorn Files $366M First Building at Anthropic-Linked Texas Campus

October 11, 2026 Pacifico Energy

The first data center building at the 2,842-acre Cedar Creek campus being developed by Pacifico Energy and BlackChamber Group is on file with the Texas Department of Licensing and Regulation. The October 7 filing, reported by Community Impact, outlines a $366 million building at the Bastrop...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.