Year Planned: 2027
Lot Size: 275 acres

Rowan plans to develop a 1.125 million sq ft (104,515 sqm) data center complex totaling four buildings. Construction is slated to begin in 2024.

Percheron is situated in the Columbia River Gorge area of Oregon, a primary fiber corridor and a data center hub. The multi-building data center campus will be situated on 275 acres, a portion of which will be set aside for preservation. The campus is adjacent to high-voltage power infrastructure and right-of way and will offer a notable power capacity of 300 MW by mid-2027. The site enjoys proximity to multiple fiber providers within a 20-mile radius, and water served from the nearby Port of Morrow.

The project parcel is located about 5,000 feet from the PGE Carty generating plant site and adjacent to an existing 230 kV transmission line right of way (ROW). The existing 230-kV transmission line runs about 1.6 miles along the western boundary of the project parcel and Tower Road.

Map and Nearby Locations:

Tower Road
Rowan Digital Infrastructure Sites
Nearby Facilities

Sites within 15 miles of Rowan Percheron

Distance Site About
10.78 miles Hyperscale Data Center Request Dataset
Amazon's Olson Rd Campus is located at 79386 Olson Rd. The site was built on 75 acres with a dedicated substation for 5 acres . The campus consists of four buildings measuring 206,000 sq ft each.
10.88 miles Hyperscale Data Center Request Dataset
10.93 miles Hyperscale Data Center Request Dataset
11.06 miles Hyperscale Data Center Request Dataset
11.77 miles Hyperscale Data Center Request Dataset
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
11.83 miles Hyperscale Data Center Request Dataset
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
11.96 miles Hyperscale Data Center Request Dataset
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
12.02 miles Hyperscale Data Center Request Dataset
The campus is situated on a 127-acre plot west of Bombing Range Road, approximately one mile south of the Highway 730 and Interstate 84 interchange.
12.18 miles Hyperscale Data Center Request Dataset
Construction started in 2012.
12.20 miles Hyperscale Data Center Request Dataset
12.27 miles Hyperscale Data Center Request Dataset
12.34 miles Hyperscale Data Center Request Dataset
13.52 miles Hyperscale Data Center Request Dataset
13.66 miles Hyperscale Data Center Request Dataset
13.71 miles Hyperscale Data Center Request Dataset
13.89 miles Hyperscale Data Center Request Dataset
13.94 miles Hyperscale Data Center Request Dataset
14.00 miles Hyperscale Data Center Request Dataset
14.04 miles Hyperscale Data Center Request Dataset
14.05 miles Hyperscale Data Center Request Dataset
14.11 miles Hyperscale Data Center Request Dataset
14.17 miles Hyperscale Data Center Request Dataset
14.18 miles Hyperscale Data Center Request Dataset
14.27 miles Hyperscale Data Center Request Dataset
14.68 miles Hyperscale Data Center Request Dataset
The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
14.71 miles Hyperscale Data Center Request Dataset
The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
14.72 miles Hyperscale Data Center Request Dataset
The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).
14.80 miles Hyperscale Data Center Request Dataset
18.24 miles Hyperscale Data Center Request Dataset
Amazon Web Services (AWS) is securing over 400 acres in Arlington, Oregon, for a future data center campus, adding to their existing Oregon data centers in Morrow and Umatilla counties.

Rowan Percheron Data Center Photos (See all)

Large Content Company Data Centers in Rural Oregon
Source: Dan Aguayo - The Oregonian

Operating Company

Operated by:

Rowan Digital Infrastructure is a US data center developer that designs and delivers hyperscale campuses for large cloud and AI customers. The company is part of Quinbrook Infrastructure Partners and began in 2020 as a joint venture with Birch Infrastructure, and has been referred to as Rowan Green Data.

Its current US pipeline includes three campuses at the Quantum Frederick park in Maryland, the Cinco campus near San Antonio, Texas, a site in Temple, Texas, and the Percheron campus in Oregon. Verified capacity figures include a 300 MW Percheron plan in Morrow County, Oregon, and a 300 MW Cinco campus in Medina County, Texas.

Rowan Digital Infrastructure History:

  • In August 2025, broke ground on the 300 MW Cinco hyperscale campus outside San Antonio, Texas.
  • In February 2025, closed approximately $1.24 billion in construction financing for the second phase of its Maryland campus at TPG’s Quantum Frederick site.
  • Founded as Rowan Green Data in 2020 via a joint venture between Quinbrook Infrastructure Partners and Birch Infrastructure.
17
Facilities
0
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?