Verizon Secures Approval for $20bn Frontier Acquisition
January 16, 2026
Verizon Enterprise
| Distance | Site | About |
|---|---|---|
| 0.44 miles | Equinix Stockholm SK3 |
|
| 2.04 miles | atNorth: Kista SWE02 |
atNorth is building a second data center facility in Kista, Sweden, with operations scheduled to begin in Q4 2027.
|
| 2.37 miles | STOKAB KN3, Kista | |
| 2.46 miles | atNorth Stockholm SWE01 |
atNorth's SWE01 data center is situated in Kista, a Stockholm suburb within Europe's largest Information and Communications Technology cluster.
|
| 2.50 miles | Digital Realty: STO6 |
|
| 2.57 miles | Digital Realty: STO5 |
|
| 2.58 miles | Digital Realty: STO4 |
|
| 2.62 miles | Digital Realty: Stockholm STO2 |
|
| 2.62 miles | Digital Realty: STO3 |
|
| 2.65 miles | Digital Realty: Stockholm STO1 |
Digital Realty's Stockholm campus functions as the Nordic region's interconnection hub. It consists of six cloud- and network-neutral data center facilities.
|
| 2.88 miles | Bahnhof: Gullan (Stockholm) |
Gullan Cosmic Network Station is the world's first pink, intergalactic data center, strategically located in the southern, city-center part of the telecommunications city of Kista.
|
| 3.00 miles | Equinix Stockholm SK1 |
|
| 3.93 miles | T.Loop: DEC001-Haggvik |
The world's first Data Energy Center® (DEC001) was launched in 2023 by Swedish company T.Loop in Stockholm.
|
| 4.83 miles | Conapto STHLM 3 North |
|
| 6.12 miles | Bahnhof: St. Erik (Stockholm) |
Situated in Stockholm, the modern St. Erik data center features exceptional connectivity and high fiber density within a building originally constructed in 1926 as Europe's largest garage (Bilpalatset).
|
| 7.18 miles | Bahnhof: Thule (Stockholm) |
The Thule data center is located at Tunnelgatan 2 in Stockholm, nestled in Brunkebergsåsen in the heart of the city. This facility occupies a substantial building footprint of 51,376 square feet.
|
| 7.20 miles | Conapto STHLM 4 South |
Stockholm 4 South initially consists of one retail colocation computer room and the rest is white space for tailored customer solutions.
|
| 7.34 miles | Conapto Sthlm 2 South |
|
| 7.38 miles | Crypto Mining Data Center Request Dataset |
Hive offers its own GPU cloud service, Buzz, which provides access to Nvidia's powerful H100s, A6000s, A5000s, A40s, and H200s.
|
| 7.41 miles | IP-Only Sätra |
A modern data center is situated in Sätra right outside Stockholm.
|
| 7.47 miles | Kolo: SE2 Tellus Stockholm |
In 2020, Swedish data center operator EcoDataCenter acquired two data centers in Stockholm. The facilities together offered 1,000 square meters (10,800 sq ft) of white space.
|
| 7.52 miles | STOKAB KN5, Södermalm | |
| 7.59 miles | T.Loop: DEC002 |
New Swedish data center operator T.Loop acquired a facility in Stockholm, Sweden.
|
| 7.78 miles | STOKAB KN7, Östermalm | |
| 7.81 miles | Bahnhof: Elementica (Stockholm) |
Swedish data center provider Bahnhof has officially scrapped its long-delayed Elementica project in Stockholm to focus on a new subterranean facility in Gothenburg.
|
| 8.14 miles | GleSYS: Stockholm |
This facility was formerly operated by Portlane. GleSYS acquired Portlane in 2015.
|
| 8.33 miles | GTT Stockholm |
|
| 8.46 miles | STACK Stockholm STO01 |
The STO01 campus occupies 4 hectares in Upplands Väsby, a communications hub for Stockholm's northern suburbs.
|
| 8.57 miles | STACK: STO01B |
STO01B is the second data center building of Stack Infrastructure's Stockholm Campus.
|
| 8.59 miles | Conapto Sthlm 1 City |
|
| 8.62 miles | Kolo: SE1 Atlas Stockholm |
Operating as a "Twin-Site" ecosystem in the heart of Stockholm, Kolo SE1 Atlas and Kolo SE2 Tellus provide a high-security, ultra-low latency foundation for AI and enterprise workloads.
|
| 8.75 miles | Bahnhof: Pionen (Stockholm) |
The Bahnhof Pionen Data Center exists in a previous nuclear shelter about 100 ft (30 m) under the ground.
|
| 9.41 miles | IP-Only Hammarby | |
| 9.47 miles | STOKAB KN6, Hammarby | |
| 11.54 miles | Equinix Stockholm SK2 |
|
| 15.98 miles | Evroc: Stockholm |
Evroc, a new player in the data center industry, has chosen Stockholm for its first facility. The company expects the site to be operational by the latter half of 2026.
|
January 16, 2026
Verizon Enterprise
October 06, 2025
Verizon Enterprise
January 27, 2025
Verizon Enterprise
March 19, 2024
Stockholm
February 21, 2024
Verizon Enterprise
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas