Telehouse: Magny 1

Latest Podcast 1 Rue Pablo Picasso
Operational
Fully operational facility
Operated by:

Telehouse: Magny 1

Short Code: TH3 Magny 1
Year Built: 2009
Utility Provider: Enedis
Lot Size: 16 acres
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Power:

  • Like all Telehouse data centres, the Magny site benefits from electrical redundancy thanks to two incoming 15MW lines each from a separate power grid substation in order to reduce the risk of power cuts to a strict minimum
  • These two main power lines are backed up by 2,000-kVA generator sets (eventually eight in all) deployed in N+1 configuration. These units can provide up to 72 hours back up continuously, due to four 60,000-litre fuel tanks buried under the site. In addition, a bank of four 800kVA inverters in N+1 configuration can ensure thirty minutes of autonomy for the rooms in specified areas
  • In the colocation areas, the basic electrical infrastructure is N+1 configuration, expandable to 2x(N+1) on demand. Average power provided is 2kVA, and up to 6kVA (or more on request) can be supplied per rack. Finally, each dedicated room is equipped with a power distribution unit with an average of ten 220V/16A circuit breakers for connecting equipment

HVAC:

  • Data centre rooms are cooled on a ‘hot aisles’ and ‘cold aisles’ basis in order to optimise air circulation and improve heat discharge while using the air conditioning system as efficiently as possible. In addition, a floor void of 80cm ensures air circulation is 10% more efficient
  • Magny has redundancy at N 2 ice water production for room cooling
  • Production: 8 Clima-Veneta cooling units, total 1150kW each, with N 1 configuration
  • Air conditioning cabinets: Aircé air-conditioning cabinets with unit power of 105kW. Configuration from N 1 to 2 N 1
  • Temperature and humidity indicators: 24°C 2/-2°C - 50 %rh /-10%
  • Water leak detection: Digital leak detection and location system

Compliance:

  • ISO 9001:2008 Quality Management Standard
  • ISO/IEC 27001:2005 Information Security Management
  • ISO 14001 Environmental Standard

Map and Nearby Locations

1 Rue Pablo Picasso
Telehouse Sites
Nearby Facilities

Telehouse: Magny 1 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Telehouse: Magny 1

Distance Site
0.10 miles Telehouse: Magny 2
0.10 miles Telehouse: Magny 2 P34
2.92 miles Thésée: TDC02
4.01 miles CapitaLand: Saclay
4.56 miles UltraEdge: Trappes
5.15 miles CapitaLand: Montigny-le-Bretonneux
5.94 miles Colt: Les Ulis PAR5
6.01 miles Colt: Les Ulis PAR6
6.47 miles Colt: Les Ulis PAR1
6.65 miles Alionis ADC1
6.80 miles Digital Realty: PAR14
6.81 miles Digital Realty: PAR13
6.82 miles Colt: Villebon PAR3
6.88 miles Colt: Villebon PAR2
6.88 miles Colt: Villebon PAR4
7.14 miles Cogent Velizy Villacoublay
7.30 miles Data4: PAR02
7.38 miles Etix: Paris #3
7.43 miles CapitaLand: Bièvres
7.61 miles Equinix PA13x
8.24 miles Data4: PAR03 DC3
8.30 miles Data4: PAR03 DC2
8.34 miles Data4: PAR03 DC1
8.36 miles Data4: PAR01 DC23
8.39 miles Data4: PAR01 DC22
8.40 miles Data4: PAR01 DC20
8.41 miles Data4: PAR01 DC21
8.42 miles Data4: PAR01 DC5
8.42 miles Data4: PAR01 DC19
8.44 miles Data4: PAR01 DC17
8.45 miles Data4: PAR01 DC7
8.45 miles Data4: PAR01 DC6
8.48 miles Data4: PAR01 DC18
8.48 miles Data4: PAR01 DC1
8.49 miles Data4: PAR01 DC8
8.52 miles Data4: PAR01 DC2
8.52 miles Data4: PAR01 DC4
8.56 miles Data4: PAR01 DC3
8.57 miles Data4: PAR01 DC16
8.59 miles Data4: PAR01 D3
8.61 miles Data4: PAR01 DC10
8.61 miles Data4: PAR01 DC14
8.64 miles Data4: PAR01 DC9
8.66 miles Data4: PAR01 DC11
8.66 miles Data4: PAR01 DC15
8.68 miles Data4: PAR01 DC12
10.37 miles Eclairion: Bruyères-le-Châtel
11.01 miles CyrusOne Paris I
12.24 miles OpCore DC4
12.37 miles Nervalis: PAR1, Paris
12.49 miles Digital Realty: Paris PAR4
12.81 miles Lumen Paris Le Capitole
13.45 miles ICADE: Paris Orly-Rungis
14.03 miles Hyperscale Data CenterInterested in this information?Contact us
14.19 miles OpCore DC3
14.56 miles Cogent La Garenne-Colombes
14.80 miles Claranet Faubourg Elysées
14.84 miles UltraEdge Paris (Boulevard de Verdun)
14.88 miles Equinix Courbevoie PA7
14.89 miles Metrobloks: Paris
14.95 miles BT Services Paris
15.14 miles Segro: Paris, France
15.14 miles Carrier-Neutral Data CenterInterested in this information?Contact us
15.41 miles Edged Energy: Paris North
15.41 miles Mistral Paris AI Campus
15.56 miles Global Switch: Paris West
15.58 miles Global Switch: Paris South
15.59 miles Global Switch: Paris East
15.60 miles Global Switch: Paris North
15.68 miles Telehouse Paris 1 (Jeûneurs)
15.77 miles ETIX Paris#1 Poissonnière
15.93 miles OpCore DC2
16.05 miles Digital Realty: Paris PAR6
16.24 miles AtlasEdge North (Bessieres)
16.41 miles Colt Paris South West (Wattignies)
16.48 miles Equinix: PA16
16.53 miles Equinix: PA12x
16.56 miles Telehouse Paris 2 Voltaire
16.91 miles Foliateam Paris Nation
16.99 miles Goodman: PAR02-B
17.06 miles Goodman: PAR02-A
17.45 miles CloudHQ: CDG2
17.54 miles CloudHQ: CDG1
18.00 miles Digital Realty: Paris PAR1
18.16 miles Equinix Paris PA5
18.22 miles Verizon Paris
18.23 miles nLighten: Paris II (PAR2)
18.25 miles Digital Realty: Paris PAR2
18.34 miles Equinix Paris PA6
18.35 miles Digital Realty: PAR5
18.36 miles Equinix: PA14
18.38 miles Digital Realty: PAR3
18.57 miles Equinix: PA9x
18.60 miles Equinix Saint-Denis PA10
18.64 miles Equinix: PA3
18.69 miles ETIX Paris #2 Saint-Denis
18.69 miles Equinix: PA2
18.69 miles Free Pro: PAR02
18.69 miles Aruba: France FR1
19.24 miles UltraEdge: Aubervilliers
19.30 miles Segro: Val-de-Marne, France
19.77 miles Equinix Paris Pantin PA4
19.77 miles Equinix: PA8x
19.80 miles Thésée: Aubergenville TDC01
19.81 miles Thésée: TDC01 Bldg2

Telehouse: Magny 1 Data Center Photos See all

Rendering of Telehouse Magny 2
Source: Telehouse
The data center in Magny-Les-Hameaux was purpose-built in 2009
Exterior View
Source: Telehouse

The data center in Magny-Les-Hameaux was purpose-built in 2009

Operating Company

Operated by:

Telehouse is a subsidiary of KDDI Corporation. KDDI was founded in 1984 and is headquartered in Tokyo, Japan.

History (by site):


1989: New York Teleport site
1990: London Docklands North
1997: New York 25 Broadway
1997: London Metro
1998: Expanded to Los Angeles
1999: London Docklands East
1999: Paris Voltaire
2000: Asian expansion in Hong Kong & Seoul
2008: Beijing BEZ & Singapore
2009: Paris Magny
2010: London Docklands West
2010: Hanoi & Shanghai Jinqiao
2010: Johannesburg
2011: Hong Kong CCC
2011: New York Chelsea
2011: Istanbul
2012: Frankfurt and Moscow
2012: Beijing BDA
2013: Shanghai Zhangjiang

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Telehouse And KDDI Close £220M Purchase Of East India Dock Campus
Telehouse and its parent KDDI have completed the purchase of the Inventory Estate in East India Dock, London, for more than £220 million. The sellers are LaSalle Investment Management and Trilogy R...

Telehouse And KDDI Close £220M Purchase Of East India Dock Campus

October 29, 2026 Telehouse

Telehouse and its parent KDDI have completed the purchase of the Inventory Estate in East India Dock, London, for more than £220 million. The sellers are LaSalle Investment Management and Trilogy Real Estate, and the deal values the campus at US$294 million, Telehouse said. Telehouse says 65 MVA...

Read more
Read NTT Data Adds AI Factories In Paris And Singapore, Bringing Total To Five
NTT Data has launched AI Factory GPU clusters in [Paris](https://baxtel.com/regions/paris) and [Singapore](https://baxtel.com/regions/singapore), expanding its network of AI evaluation environments...

NTT Data Adds AI Factories In Paris And Singapore, Bringing Total To Five

October 29, 2026 NTT Data

NTT Data has launched AI Factory GPU clusters in Paris and Singapore, expanding its network of AI evaluation environments to five sites. The company announced the expansion on October 27, and the new facilities join AI Factories in Plano, Texas, and Riyadh, Saudi Arabia. Data Center Dynamics...

Read more
Read Telehouse Breaks Ground on New London Facility
Telehouse Breaks Ground on New London Facility

Telehouse Breaks Ground on New London Facility

October 22, 2025 Telehouse

Data center firm Telehouse has broken ground on a new facility in London, the 33MW Telehouse West Two data center at its existing Docklands campus in East London. The nine-storey building will cover a total gross area of 32,000 sqm (344,445 sq ft), with 11,290 sqm (121,524 sq ft) of white space...

Read more
Read Gigawatt-Scale Data Center Cluster to be Developed Outside Paris, France
Gigawatt-Scale Data Center Cluster to be Developed Outside Paris, France

Gigawatt-Scale Data Center Cluster to be Developed Outside Paris, France

May 23, 2025 Paris

French national investment bank Bpifrance, UAE investment fund MGX, French AI firm Mistral AI, and Nvidia this week announced the formation of a joint venture to establish what they claim will be Europe’s largest AI campus in France.The companies said they aim to develop Europe’s first...

Read more
Read Telehouse launches liquid cooling lab at London data center
Telehouse launches liquid cooling lab at London data center

Telehouse launches liquid cooling lab at London data center

January 20, 2025 Telehouse

Telehouse has teamed up with four cooling technology vendors; Accelsius, EkkoSense, JetCool, and Legrand to launch a liquid cooling lab at its London data center. Liquid cooling technologies from these vendors will be on display at Telehouse South, at the company’s London Docklands campus. Mark...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.