Private Equity Data CenterInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Mirabel, QC J7N 3E3, Canada
OperationalProspective Expansion
Fully operational facility with prospective expansion planned
Operated by: Private Equity OperatorInterested in this information?Contact us

Private Equity Data Center

Year Built: 2018
Utility Provider: Hydro-Québec
Ownership: Private Equity OperatorInterested in this information?Contact us owns. the building.
Lot Size: 5 acres
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power

Private Equity OperatorInterested in this information?Contact us's Mirabel data centre is a 113,986 sq ft building beside Montréal-Mirabel airport. Private Equity OperatorInterested in this information?Contact us runs it for high-density colocation and plans to expand the site.

Site History

  • March 2024: Argo Blockchain sold the Mirabel facility.
  • May 2021: Argo Blockchain acquired GPU.ONE's Quebec subsidiaries, including the Mirabel facility.
  • 2018: By April, GPU.ONE had opened its first data centre in the building, with room for more than 3,000 servers.
  • 2002: The three-storey building was completed.

Project Profile

  • Design: engineered for high-density racks

Map and Nearby Locations

This Facility
Private Equity OperatorInterested in this information?Contact us Sites
Nearby Facilities

Private Equity Data CenterInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Private Equity Data CenterInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Cerebras: Quebec
Cerebras Systems runs an AI compute deployment in the data halls of Enovum(WhiteFiber): MTL03 at 500 boulevard Monseigneur-Dubois in Saint-Jérôme. WhiteFiber owns the building. The Cerebras deployment went live in November 2025.
NN milesInterested in this information?Contact us Enovum(WhiteFiber): MTL03
Enovum MTL-3 is a 202,000 sq ft Tier III data centre on 7.7 acres at 500 boulevard Monseigneur-Dubois in Saint-Jérôme, north of Montreal. Enovum retrofitted the existing building in 2025 for Cerebras, which occupies the data halls, and the site went live in November 2025. WhiteFiber bought the property in May 2026.
NN milesInterested in this information?Contact us Global ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us Equinix: MT2
Equinix MT2 is a colocation data centre with about 37,800 sq ft of colocation space inside the former Ericsson Global ICT Centre, a single-storey building of about 215,000 sq ft at 3500 rue F.-X.-Tessier in Vaudreuil-Dorion. Ericsson completed the building in December 2016. Equinix opened MT2 in two 500-cabinet phases in the second half of 2023.
NN milesInterested in this information?Contact us Vantage: QC61
QC61 is Vantage's Montreal III (QC6) campus at 205 boulevard Brunswick in Pointe-Claire, a single-storey data centre with two data modules on 8 acres. Hypertec first announced the site as YUL02 in 2019, and Vantage built it from January 2022. The first phase came online in December 2022 and the final phase in December 2025.
NN milesInterested in this information?Contact us Vantage: Baie-d'Urfé
Vantage planned a CA$400 million data centre campus in two adjoining buildings at 21500 route Transcanadienne and 21525 avenue Clark-Graham in Baie-D'Urfé, in Montreal's West Island. Vantage bought the buildings in 2021. It cancelled the project for lack of power and sold both buildings in 2023.
NN milesInterested in this information?Contact us Government Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us eStruxture MTL-4 Kirkland
eStruxture MTL-4 is a 100,000 sq ft data centre at 17500 route Transcanadienne in Kirkland, in Montreal's West Island. Cogeco Peer 1 opened it in September 2015, and eStruxture bought it from Aptum in April 2021. The facility is built to Tier III standards.

Operating Company

Operated by: Private Equity OperatorInterested in this information?Contact us
This operator's profile is available on request. Full company details, market presence, portfolio scale, and operating history are available to subscribers with unblurred access. Contact us to unlock the complete operator profile for this facility and every other location in their footprint.Interested in this information?Contact us
0
Facilities
0
Markets

News See all

Read Wiz announces opening of Montreal data center
Wiz announces opening of Montreal data center

Wiz announces opening of Montreal data center

May 02, 2023 Montreal

Wiz has announced the launch of its new cloud data center in Montreal, Canada. The facility is to provide local and multinational organizations with faster, and more secure cloud security infrastructure and is also pegged to provide greater data sovereignty, while maintaining privacy...

Read more
Read Enovum launches its phase 1 in Montreal
Enovum launches its phase 1 in Montreal

Enovum launches its phase 1 in Montreal

September 29, 2022 Montreal

Enovum Data Centers has announced that the first phase of its Montreal facility has been launched. It will soon begin its second phase. With 70,000 sqft of infrastructure and move-in space availability for a total of 187,500 sqft, the facility's first phase also has a capacity of 1.5 MW. Once...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.