Enovum(WhiteFiber): MTL03

Latest Podcast 500 boul. Monseigneur-Dubois
Operational
Fully operational facility
Operated by:

Enovum(WhiteFiber): MTL03

Short Code: MTL03
Year Built: 2025
Utility Provider: Hydro-Québec
Ownership: Enovum owns (purchased 2026-05-08). the building.
Lot Size: 8 acres

Sites leasing space from Enovum:

░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power

Site History

  • 2025: Enovum took over the in-development site and retrofitted it to Tier III standards.
  • November 2025: The data centre was completed and went live.
  • May 2026: WhiteFiber completed its purchase of the property.

Project Profile

  • Operator: Enovum (WhiteFiber)
  • Owner: WhiteFiber, since May 2026
  • Building: two storeys, about 202,000 sq ft
  • Site: 7.7 acres
  • Design: Tier III
  • Tenant: Cerebras Systems
  • Status: Operational

Map and Nearby Locations

500 boul. Monseigneur-Dubois
Enovum Sites
Nearby Facilities

Enovum(WhiteFiber): MTL03 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Enovum(WhiteFiber): MTL03

Distance Site About
0.00 miles Cerebras: Quebec
Cerebras Systems runs an AI compute deployment in the data halls of Enovum(WhiteFiber): MTL03 at 500 boulevard Monseigneur-Dubois in Saint-Jérôme. WhiteFiber owns the building. The Cerebras deployment went live in November 2025.
0.93 miles UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.67 miles Private Equity Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.50 miles CentralInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Operating Company

Operated by:

Enovum Data Centers builds and manages mission-critical digital infrastructure, powered by renewable hydroelectricity in its Montreal flagship facility.

  • Bit Digital acquired Enovum in November 2024 for a consideration of CA$62.8 million (US$46m).
0
Facilities
0
Markets

News See all

Read Wiz announces opening of Montreal data center
Wiz announces opening of Montreal data center

Wiz announces opening of Montreal data center

May 02, 2023 Montreal

Wiz has announced the launch of its new cloud data center in Montreal, Canada. The facility is to provide local and multinational organizations with faster, and more secure cloud security infrastructure and is also pegged to provide greater data sovereignty, while maintaining privacy...

Read more
Read Enovum launches its phase 1 in Montreal
Enovum launches its phase 1 in Montreal

Enovum launches its phase 1 in Montreal

September 29, 2022 Montreal

Enovum Data Centers has announced that the first phase of its Montreal facility has been launched. It will soon begin its second phase. With 70,000 sqft of infrastructure and move-in space availability for a total of 187,500 sqft, the facility's first phase also has a capacity of 1.5 MW. Once...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?