DCPC: Summit Ridge

Latest Podcast I-15 Exit 242
PlannedProspective Expansion
Future facility in planning stagefacility with prospective expansion planned
Operated by: DCPC

DCPC: Summit Ridge

Year Planned: 2028
Ownership: DCPC developer-owned land. a specific-performance lawsuit filed in august 2025 by jjmc development claims a contractual right to buy the property. the building.
Lot Size: 32 acres

Site History

  • January 2024: Santaquin approves a master development agreement for the Santaquin Research & Tech Center, covering data center space and an on-site power plant.
  • October 2024: The Santaquin City Council unanimously amends its commercial light manufacturing zone to allow a data center.
  • August 2025: JJMC Development files a specific-performance lawsuit claiming a contractual right to buy the land.
  • 2026-01-29: DCPC presents the plan at a public forum at Santaquin City Hall. No construction start date had been set.
  • 2026-04-29: DCPC and ServerDomes Global sign a joint venture covering a fully permitted 500 MW Utah data center project.

Project Profile

  • Developer: Data Center Power Company (DCPC), based in Orem, Utah.
  • Partner: ServerDomes Global, the geodesic-dome data center developer, through the April 2026 joint venture.
  • Location: South end of Santaquin, west of I-15 at exit 242, beside the Sunroc gravel pit and near a newer housing development.
  • Land: About 32 acres across two parcels.
  • Power: Off-grid, with all power generated on site from natural gas.
  • Water: Low water use, per the developer and city.
  • Status: Approved by the city. A construction start has not been announced.
  • Local context: Residents raised air-quality and emissions concerns at the January 2026 forum. Utah County is a PM2.5 nonattainment area.

Map and Nearby Locations

I-15 Exit 242
DCPC Sites
Nearby Facilities

DCPC: Summit Ridge Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of DCPC: Summit Ridge

Distance Site About
8.08 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Greenfield data center planned by Carrier-Neutral Operator (Twin Palms Capital) in Payson, Utah. TPC's duplicatable standard design: a ~150,000 sq ft, two-level building on roughly 10 acres with a proprietary low-water cooling system and an on-site water-recycling pond. In city planning as of mid-2026.
14.96 miles BluSky AI: Nephi, UT
BluSky AI Inc. has signed a non-binding Letter of Intent (LOI) to lease approximately 16,000 square feet (1,485 sqm) of land in Juab County from TNT Land and Holdings LLC.

Operating Company

Operated by: DCPC
0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?