Samca: Ribera Alta del Ebro II

Latest Podcast Paridera Barranco, Polígono 9
PlannedProspective Expansion
Future facility in planning stagefacility with prospective expansion planned
Operated by:

Samca: Ribera Alta del Ebro II

Site planned for 2028 and has expansions through 2030
PUE: 1.25
Utility Provider: Red Eléctrica
Floors: 2

Ribera Alta del Ebro II is the second of three data centres in Grupo Samca's Green IT Aragón colocation campus at Luceni, west of Zaragoza. It shares the campus substation and takes its own 220 kV line from the Jalón PRE substation.

Site History

  • Feb 2026: The campus substation and 220 kV lines went to public consultation.
  • Dec 2025: The Gobierno de Aragón gave the general-interest plan initial approval.
  • Apr 2025: The Gobierno de Aragón declared Green IT Aragón an investment of regional interest and a priority project.

Map and Nearby Locations

Paridera Barranco, Polígono 9
Grupo Samca Sites
Nearby Facilities

Samca: Ribera Alta del Ebro II Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Samca: Ribera Alta del Ebro II

Distance Site About
0.08 miles Samca: Atalaya del Ebro
Atalaya del Ebro is the third of three data centres in Grupo Samca's planned Green IT Aragón colocation campus at Luceni, Zaragoza province.
0.30 miles Samca: Ribera Alta del Ebro
Ribera Alta del Ebro is the first of three data centres in Grupo Samca's planned Green IT Aragón colocation campus at Luceni, Zaragoza province.
6.52 miles Forestalia: DCM Data (Magallón)
Forestalia's planned DCM Data centre at Magallón, Zaragoza province, the one site left in its Búfalo project after Forestalia sold the Botorrita and Alfamén grid rights to Merlin Properties.
6.56 miles Forestalia: Magallón Expansion
Later phases of Forestalia's planned DCM Data centre at Magallón, Zaragoza province, which the Búfalo plan expands through 2030.
16.35 miles ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.74 miles Box2bit: Epilon
Cancelled data center campus that Box2bit planned at Venta Romera in Épila, Zaragoza, in 2026.
19.29 miles QTS: Calatorao 8
Calatorao 8 (DC8) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
19.34 miles QTS: Calatorao 7
Calatorao 7 (DC7) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
19.39 miles QTS: Calatorao 6
Calatorao 6 (DC6) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
19.43 miles QTS: Calatorao 5
Calatorao 5 (DC5) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
19.49 miles QTS: Calatorao 4
Calatorao 4 (DC4) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
19.54 miles QTS: Calatorao 3
Calatorao 3 (DC3) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
19.59 miles QTS: Calatorao 2
Calatorao 2 (DC2) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
19.64 miles QTS: Calatorao 1
Calatorao 1 (DC1) is the first of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province, where site works began in October 2026.
19.90 miles QTS: Calatorao Expansion
Calatorao Expansion carries the planned second phase of QTS's Proyecto Rhodes campus at Calatorao, Zaragoza province, Spain.

Operating Company

Operated by:

Grupo Samca is a privately held, family-owned industrial group based in Zaragoza, Spain, active since 1919. It works across several industrial divisions and develops renewable energy through its subsidiary Molinos del Ebro.

In data centres, Samca is developing Green IT Aragón, a three-building colocation campus at Luceni in the Ribera Alta del Ebro district, through its subsidiary Data Center Ribera Alta del Ebro.

Grupo Samca History:

  • In December 2025, the Gobierno de Aragón gave initial approval to the Green IT Aragón general-interest plan.
  • In April 2025, the Gobierno de Aragón declared Green IT Aragón an investment of regional interest.
  • Founded in 1919.
0
Facilities
0
Markets

News See all

Read O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan
O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a [Vantage Data Centers](https://baxte...

O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan

October 23, 2026 Aragon

O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a Vantage Data Centers campus announced for the same area in September 2025. elEconomista reports the total investment reaches €7.446...

Read more
Read Krolmap Plans 225MW Off-Grid Data Center Campus in Belchite, Zaragoza
Krolmap Engineering & Solutions plans a 225MW data center campus in Belchite, Zaragoza, that would run largely on self-generated power. The Aragonese engineering firm puts the investment at €1.5 bi...

Krolmap Plans 225MW Off-Grid Data Center Campus in Belchite, Zaragoza

October 23, 2026 Krolmap Engineering & Solutions

Krolmap Engineering & Solutions plans a 225MW data center campus in Belchite, Zaragoza, that would run largely on self-generated power. The Aragonese engineering firm puts the investment at €1.5 billion ($1.68bn) for 25 hectares in the La Legua industrial park, Heraldo de Aragón reported on...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.