Merlin: Zaragoza-WIND

Latest Podcast Sector 2, Polígono Industrial San Antonio
PlannedProspective Expansion
Future facility in planning stagefacility with prospective expansion planned
Operated by:

Merlin: Zaragoza-WIND

Short Code: ZGZ-WIND 01
Year Planned: 2029
PUE: 1.15
Utility Provider: Red Eléctrica
Lot Size: 71 acres

Zaragoza-WIND is a single two-storey data center building with twelve data halls planned by Merlin Properties in Botorrita, about 20 km southwest of Zaragoza. Two private substations across the A-2101 road connect it to Red Eléctrica's María and Los Vientos 220 kV substations, using grid access Merlin bought from Forestalia's Búfalo project. Forestalia is developing wind farms to supply it. Merlin plans about €1.2 billion of investment, construction from mid-2027 and operation in the second half of 2029. A second phase on further land depends on more power.

Site History

  • Oct 2026: Aragón opened the strategic environmental assessment.
  • Jul 2026: Aragón declared the project of general interest.
  • Jun 2026: Merlin filed the project with the Aragón government.
  • Mar 2026: Press first placed a Merlin data center near Muel.

Map and Nearby Locations

Sector 2, Polígono Industrial San Antonio
Merlin Properties Sites
Nearby Facilities

Merlin: Zaragoza-WIND Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Merlin: Zaragoza-WIND

Distance Site About
0.81 miles Forestalia: DCM Dédalo (Botorrita)
Forestalia's former planned DCM Dédalo data centre at Botorrita, Zaragoza province. Forestalia sold its grid rights to Merlin Properties, which uses them for its Zaragoza-WIND campus in Botorrita.
0.88 miles Forestalia: Botorrita Expansion
Former later phases of Forestalia's DCM Dédalo data centre at Botorrita, Zaragoza province, whose grid rights Merlin Properties bought in 2026.
8.86 miles Valley MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.45 miles Global PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.02 miles Ridge ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.72 miles Box2bit: Epilon
Cancelled data center campus that Box2bit planned at Venta Romera in Épila, Zaragoza, in 2026.
11.77 miles QTS: Calatorao 8
Calatorao 8 (DC8) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
11.84 miles QTS: Calatorao 7
Calatorao 7 (DC7) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
11.91 miles QTS: Calatorao 6
Calatorao 6 (DC6) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
11.99 miles QTS: Calatorao 5
Calatorao 5 (DC5) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
12.08 miles QTS: Calatorao 4
Calatorao 4 (DC4) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
12.15 miles QTS: Calatorao 3
Calatorao 3 (DC3) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
12.20 miles Forestalia: Alfamén Expansion
Former later phases of Forestalia's DCM Blue data centre at Alfamén, Zaragoza province, whose grid rights Merlin Properties bought in 2026.
12.23 miles QTS: Calatorao 2
Calatorao 2 (DC2) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
12.23 miles Forestalia: DCM Blue (Alfamén)
Forestalia's former planned DCM Blue data centre at Alfamén, Zaragoza province. Its grid rights went to Merlin Properties for the Zaragoza-WIND campus in Botorrita.
12.30 miles QTS: Calatorao 1
Calatorao 1 (DC1) is the first of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province, where site works began in October 2026.
12.31 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.72 miles QTS: Calatorao Expansion
Calatorao Expansion carries the planned second phase of QTS's Proyecto Rhodes campus at Calatorao, Zaragoza province, Spain.
13.51 miles Box2bit: Proyecto Ebro
Cancelled five-building data center campus on the Entreviñas industrial estate in Cariñena, Zaragoza, that Box2bit dropped in 2026.
13.62 miles Grupo Aire OASIX: Zaragoza
A small Aire colocation room in the World Trade Center Zaragoza office tower, one of Grupo Aire's regional proximity data centres.
16.96 miles Krolmap: Belchite DC6
Proposed building 6 of six on Krolmap Engineering & Solutions' off-grid data center campus at the La Legua industrial estate in Belchite, Zaragoza.
16.97 miles ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.99 miles Krolmap: Belchite DC4
Proposed building 4 of six on Krolmap Engineering & Solutions' off-grid data center campus at the La Legua industrial estate in Belchite, Zaragoza.
17.13 miles Krolmap: Belchite DC2
Proposed building 2 of six on Krolmap Engineering & Solutions' off-grid data center campus at the La Legua industrial estate in Belchite, Zaragoza.
17.13 miles Krolmap: Belchite DC3
Proposed building 3 of six on Krolmap Engineering & Solutions' off-grid data center campus at the La Legua industrial estate in Belchite, Zaragoza.
17.16 miles Krolmap: Belchite DC1
Proposed building 1 of six on Krolmap Engineering & Solutions' off-grid data center campus at the La Legua industrial estate in Belchite, Zaragoza.
17.18 miles ACS: Aragon
ACS and Benbros Energy are developing a two-building data center campus in La Puebla de Alfindén, east of Zaragoza.
17.29 miles Krolmap: Belchite DC5
Proposed building 5 of six on Krolmap Engineering & Solutions' off-grid data center campus at the La Legua industrial estate in Belchite, Zaragoza.
17.51 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.55 miles CentralInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.58 miles Cloud TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.64 miles Park PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.24 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.39 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.58 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.71 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.84 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.89 miles Tillion: Zaragoza
Tillion Data Centers, Azora's hyperscale platform, is developing the Tillion Aragón campus in Villamayor de Gállego, near Zaragoza.
19.98 miles Vantage: ZAZ2 Bldg1.1
Vantage Data Centers' former planned campus at El Olivar, Villanueva de Gállego, north of Zaragoza. Its local promoters moved to a new site in San Mateo de Gállego in 2026.

Operating Company

Operated by:

MERLIN Properties SOCIMI, S.A. (MC:MRL) is the largest real estate company trading on the Spanish Stock Exchange. Specialized in the acquisition and management of commercial property in the Iberian region, MERLIN Properties mainly invests in offices, shopping centers and logistics facilities, within the Core and Core Plus segments, forming part of the benchmark IBEX-35, Euro STOXX 600, FTSE EPRA/NAREIT Global Real Estate, GPR Global Index, GPR-250 Index, and MSCI Small Caps indices.

0
Facilities
0
Markets

News See all

Read Merlin Pauses Two Bilbao Data Center Buildings, Cuts MEGA Plan to 704MW
[Merlin Properties](https://baxtel.com/data-centers/merlin-properties) has paused work on two buildings at its [Bilbao-Arasur data center campus](https://baxtel.com/data-center/merlin-bilbao-arasur...

Merlin Pauses Two Bilbao Data Center Buildings, Cuts MEGA Plan to 704MW

November 19, 2026 Merlin Properties

Merlin Properties has paused work on two buildings at its Bilbao-Arasur data center campus after failing to secure an electricity supply for them. The suspension covers Arasur 4 and Arasur 5 in Álava, in Spain's Basque Country. Chief executive Ismael Clemente confirmed the halt at...

Read more
Read O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan
O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a [Vantage Data Centers](https://baxte...

O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan

October 23, 2026 Aragon

O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a Vantage Data Centers campus announced for the same area in September 2025. elEconomista reports the total investment reaches €7.446...

Read more
Read Krolmap Plans 225MW Off-Grid Data Center Campus in Belchite, Zaragoza
Krolmap Engineering & Solutions plans a 225MW data center campus in Belchite, Zaragoza, that would run largely on self-generated power. The Aragonese engineering firm puts the investment at €1.5 bi...

Krolmap Plans 225MW Off-Grid Data Center Campus in Belchite, Zaragoza

October 23, 2026 Krolmap Engineering & Solutions

Krolmap Engineering & Solutions plans a 225MW data center campus in Belchite, Zaragoza, that would run largely on self-generated power. The Aragonese engineering firm puts the investment at €1.5 billion ($1.68bn) for 25 hectares in the La Legua industrial park, Heraldo de Aragón reported on...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.