Forestalia: DCM Dédalo (Botorrita)

Planned
Future facility in planning stage
Operated by:

Forestalia: DCM Dédalo (Botorrita)

Short Code: Building 1
Year Planned: 2029

Sites on this Campus:

The Spanish energy leader Forestalia is significantly expanding its portfolio by entering the high-tech infrastructure sector with the launch of the Búfalo Project. This ambitious initiative involves a total investment of €12 billion to develop a massive network of three state-of-the-art data centers in the Aragon region of Spain.

Located in the municipality of Botorrita, just south of Zaragoza city, DCM Dédalo is a high-capacity unit designed to take advantage of the region's existing high-voltage infrastructure. This facility represents a direct investment of €3.3 billion and is strategically positioned at the "María 220 kV" electrical node. A key feature of DCM Dédalo is its high degree of energy autonomy; it is integrated with 81 MW of dedicated on-site wind and solar generation developed by Forestalia. This "behind-the-meter" setup allows the data center to operate with a 50/50 power split, using green energy generated on-site to reduce its reliance on the national grid while maintaining a massive computing footprint.

Map and Nearby Locations

Botorrita
Forestalia Sites
Nearby Facilities

Forestalia: DCM Dédalo (Botorrita) Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Forestalia: DCM Dédalo (Botorrita)

Distance Site About
0.00 miles Forestalia: Botorrita Expansion
0.20 miles Forestalia: DCM Blue (Alfamén)
The Spanish energy leader Forestalia is significantly expanding its portfolio by entering the high-tech infrastructure sector with the launch of the Búfalo Project.
0.20 miles Forestalia: Alfamén Expansion
2.17 miles Forestalia: Magallón Expansion
2.17 miles Forestalia: DCM Data (Magallón)
The Spanish energy leader Forestalia is significantly expanding its portfolio by entering the high-tech infrastructure sector with the launch of the Búfalo Project.
6.07 miles CoreInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.16 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.58 miles CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.70 miles Grupo Aire OASIX: Zaragoza
13.32 miles UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.32 miles ACS: Aragon
Spanish construction firm ACS and energy firm Benbros are investing €1.254 billion ($1.457 bn) to develop a data center in La Puebla de Alfindén, outside Zaragoza, Aragon, Spain.
14.47 miles Park MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.47 miles Tillion: Zaragoza
Investment manager Azora is launching a new hyperscale data center platform in Europe with a $2 billion campus near Zaragoza, Spain, through its subsidiary Tillion Data Centers.
14.55 miles QTS: Calatorao 1
Calatorao 1 is the first building of QTS's planned Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province, Spain.
15.03 miles North RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.08 miles QTS: Calatorao Expansion
Calatorao Expansion carries the later buildings of QTS's planned Proyecto Rhodes campus at Calatorao, Zaragoza province, Spain.
15.09 miles Edge CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.31 miles Vantage: ZAZ2 Bldg3.2
This facility is part of Vantage Data Centers' ZAZ2 campus in Spain.
15.46 miles Vantage: ZAZ2 Bldg3.1
This facility is part of Vantage Data Centers' ZAZ2 campus in Spain.
15.65 miles Vantage: ZAZ2 Bldg2.2
This facility is part of Vantage Data Centers' ZAZ2 campus in Spain.
15.79 miles Vantage: ZAZ2 Bldg2.1
This facility is part of Vantage Data Centers' ZAZ2 campus in Spain.
15.91 miles Vantage: ZAZ2 Bldg1.2
This facility is part of Vantage Data Centers' ZAZ2 campus in Spain.
16.05 miles Vantage: ZAZ2 Bldg1.1
Vantage Data Centers is making a major entrance into the Spanish market with a massive €3.2 billion investment to construct a state-of-the-art data center campus in Zaragoza.
17.01 miles Krolmap: Belchite DC3
Krolmap is planning Belchite DC3 as part of its six-building data center campus in Zaragoza, Spain. The proposed development will use a dedicated energy system combining gas-fired generation, renewable electricity and energy storage to support operations independently of the conventional power grid.
17.35 miles Krolmap: Villanueva de Gállego
Civil engineering firm Krolmap is developing a high-density technology campus in Villanueva de Gállego (Zaragoza, Aragón, Spain) across a newly acquired 20,000 m² (215,280 sq ft) plot.
18.27 miles Station UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.42 miles Metro RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.45 miles MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.49 miles North HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.55 miles Cloud CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.65 miles PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.24 miles Box2bit: Proyecto Ebro
Box2Bit is investing €3.4 billion ($3.69 billion) in Proyecto Ebro, a new data center at the Entreviñas industrial estate in Cariñena, southwest of Zaragoza, Spain’s Aragon region.

Operating Company

Operated by:

Forestalia is a leading business group at the forefront of the new renewable energy paradigm. Operating in an open and competitive market, the company distinguishes itself by developing projects independent of public premiums or subsidies. With a robust portfolio exceeding 8 GW of wind, solar photovoltaic, and agroforestry biomass energy, Forestalia is a major player in the green transition. Beyond power generation, the group is active in pellet production and maintains a core commitment to territorial development, creating economic opportunities to combat rural depopulation.

0
Facilities
0
Markets

News See all

Read O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan
O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a [Vantage Data Centers](https://baxte...

O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan

October 23, 2026 Aragon

O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a Vantage Data Centers campus announced for the same area in September 2025. elEconomista reports the total investment reaches €7.446...

Read more
Read Krolmap Plans 225MW Off-Grid Data Center Campus in Belchite, Zaragoza
Krolmap Engineering & Solutions plans a 225MW data center campus in Belchite, Zaragoza, that would run largely on self-generated power. The Aragonese engineering firm puts the investment at €1.5 bi...

Krolmap Plans 225MW Off-Grid Data Center Campus in Belchite, Zaragoza

October 23, 2026 Krolmap Engineering & Solutions

Krolmap Engineering & Solutions plans a 225MW data center campus in Belchite, Zaragoza, that would run largely on self-generated power. The Aragonese engineering firm puts the investment at €1.5 billion ($1.68bn) for 25 hectares in the La Legua industrial park, Heraldo de Aragón reported on...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.