NTT Malaysia Cyberjaya (MSC) Campus's campus consists of many buildings
Site | Address | Gross SqFt | Usable SqFt | Power (MW) |
---|---|---|---|---|
NTT Cyberjaya 1 |
No. 43000, Persiaran APEC, 63000, Cyberjaya, Selangor, Cyberjaya, 63000 Cyberjaya, Selangor, Malaysia |
|||
NTT Cyberjaya 2 |
NTT R&D Centre, Cyberjaya, 63000 Cyberjaya, Selangor, Malaysia |
|||
NTT Cyberjaya 3 |
No. 43000, Persiaran APEC, 63000, Cyberjaya, Selangor, Cyberjaya, 63000 Cyberjaya, Selangor, Malaysia |
30,000 | ||
NTT Cyberjaya 4 |
itelligence Outsourcing MSC Sdn Bhd (H.Q) c/o NTT MSC No. 43000, Persiaran Apec 3rd Floor, NTT MSC Momiji (West) Building Cyberjaya Selangor, Cyberjaya, 63000 Cyberjaya, Selangor, Malaysia |
45,500 |
Distance | Site name | SqFt | MW |
---|---|---|---|
0.01 miles | NTT Cyberjaya 1 | ||
0.06 miles | NTT Cyberjaya 2 | ||
0.09 miles | NTT Cyberjaya 3 | 30,000 | |
0.12 miles | NTT Cyberjaya 4 | 45,500 | |
0.73 miles | CSF Computer Exchange 2 (CX2) | ||
0.80 miles | Bridge Data Centres Cyberjaya MY01 | 157,500 | 25.60 |
1.06 miles | TelcoHub X1 Cyberjaya | ||
1.10 miles | CSF Computer Exchange 1 (CX1) | ||
1.13 miles | Bridge Data Centres Cyberjaya MY02 | 200,000 | |
1.13 miles | CSF Computer Exchange 5 (CX5) |
The loading bay consists of a one meter height platform for two trucks for loading/unloading of heavy equipment. The roller shutter is integrated with interlocking control design to prevent unauthorized access.
Source: NTTCyberjaya 4 Data Center provides customers with 32 Amp single-phase power sockets for each standard rack. These sockets are colored red and grey.
Source: NTTThe load capacity for each 42U rack is about 900 kg (including rack unit) and Cyberjaya 4 Data Center has two options of rack which are W 600 mm × D 1000 mm × 42 U or W 800 mm × D 1000 mm × 42 U.
NTT provides power capacity and associate cooling of at least 3kVA per rack.
Source: NTTGenerators are in 2N redundant configuration with enough fuel to run at full load for 36 hours. We also have a contract with a diesel supplier to ensure continuous fuel supply.
Source: NTTDesignated staging area is available for customer use.
Source: NTTMeeting room is available next to the staging area.
Source: NTT