Pittsburgh Data Center up for Sale or Lease
June 01, 2023
Pittsburgh
MSA’s original facility is Tier III. The entire facility consists of 42,000 square feet with 20,000 square feet of raised floor space. The “Rock” is located farther away from Pittsburgh to provide for a significant mileage buffer but still accessible from around the region.
Facility is powered by First Energy (West Penn Power) from two independent substations
Backup power provided by five generators, each delivering one megawatt (5×1=5 MW) of electrical power in an N+1 configuration
Redundant internet connectivity
Multiple communication providers with diverse entrances to the facility
Dedicated dark fiber ring connection with MSA Evergreen
State-of-the-art Vertiv (Liebert) power and cooling equipment (2N & N+1)
Multi-tiered fire detection and suppression systems
| Distance | Site | About |
|---|---|---|
| 0.29 miles | Consolidated Rockpointe |
|
| 4.62 miles | Cheswick Generating Station |
Allegheny DC Property Co. plans to develop a data center complex on the 47-acre site of the former Cheswick Generating Station in Springdale, Pennsylvania.
|
| 10.03 miles | TECfusions: New Kensington, PA |
In January 2024, TECfusions acquired this 1,350-acre site located 30 miles to the northeast of Pittsburgh.
|
| 11.75 miles | Consolidated Evergreen |
|
| 11.76 miles | MSA: Evergreen Hights |
The facility is designed from the ground up to exceed Tier III uptime standards.
|
| 13.39 miles | H5 Pittsburgh | |
| 13.95 miles | Lumen: Pittsburgh 2 | |
| 14.18 miles | Verizon: 3 Allegheny Ctr |
Former XO Communications site
|
| 14.21 miles | Ark: Pittsburgh Northpointe |
In October 2016, Involta announced plans for the expansion into Western Pennsylvania with UPMC, a leading integrated healthcare provider and insurer, as anchor-tenant. UPMC selected Involta to build, own and operate the multi-tenant facility in the Northpointe Business Park.
|
| 14.24 miles | Expedient Pittsburgh (North Side) |
The site is known as Nova Place or "North Side". It was formerly known as Allegheny Center Mall (ACM)
|
| 14.25 miles | DataBank Pittsburgh PIT1 |
|
| 14.33 miles | Chirisa: Pittsburgh, PA |
Chirisa Technology Parks (CTP) has acquired a vacant data center property in Pittsburgh, Pennsylvania, for $5.5 million, signaling the company's continued expansion in the data center market.
|
| 14.40 miles | Cogent: 650 Smithfield | |
| 14.53 miles | Lumen Pittsburgh 1 | |
| 14.72 miles | DQE Communications Pittsburgh | |
| 15.32 miles | SunCap: McKees Rocks, PA |
SunCap Industries, an affiliate of SunCap Property Group, is proposing a data center on the 72-acre RockPoint Industrial site in Stowe Township, PA.
|
| 15.57 miles | EdgeConneX Pittsburgh |
|
| 16.39 miles | American Tower: Pittsburgh | |
| 16.74 miles | Expedient Pittsburgh (Green Tree) | |
| 18.48 miles | DQE Communications Buttler | |
| 18.85 miles | QTS: Salem Township, Pennsylvania |
QTS is proposing a 1,700+ acre technology campus in Salem Township, Pennsylvania, designed to meet growing demand for data center and AI infrastructure.
|
June 01, 2023
Pittsburgh
May 18, 2022
Pittsburgh
April 27, 2022
Pittsburgh
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas