iM Critical: Pittsburgh

Latest Podcast 900 Brinton Rd
OperationalPlanned
Operational with future phases planned
Operated by:

iM Critical: Pittsburgh

Year Built: 2023
Utility Provider: Duquesne Light
Lot Size: 5 acres
░░░ Request Dataset MW
Operational Power

iM Critical, a Miami-based modular data center company, is developing a gated campus of freestanding, hardened data center buildings on the Wilkinsburg and Edgewood border, east of downtown Pittsburgh. The campus targets high-performance computing with racks of up to 75 kW, and iM Critical markets colocation there.

Site History

  • May 2022: iM Critical starts construction.
  • April 2021: An iM Critical affiliate buys the site.

Map and Nearby Locations

900 Brinton Rd
iM Critical Sites
Nearby Facilities

iM Critical: Pittsburgh Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of iM Critical: Pittsburgh

Distance Site About
4.14 miles Verizon: 530 N Neville St
Verizon's Oakland central office in Pittsburgh holds the host switch that now serves many of the area's former exchanges, plus a regional signaling hub.
4.28 miles Ascent Data: Pittsburgh
Ascent Data runs a SOC 2 audited data center for its managed IT and colocation customers in the RIDC Park in O'Hara Township, north-east of Pittsburgh.
4.44 miles aspStation: Pittsburgh
aspStation runs a small colocation and cloud data center in its own building on Penn Avenue in Pittsburgh's East End, built by IBM in 1990.
4.48 miles University of Pittsburgh: NOC
The University of Pittsburgh's Network Operations Center in the RIDC Park, O'Hara Township, is the university's enterprise data center for IT and research computing.
4.57 miles Lumen: Pittsburgh 2
Lumen's Pittsburgh 2 site is a network switching and colocation building on Technology Drive in the Pittsburgh Technology Center.
5.19 miles Lumen Pittsburgh 1
Lumen's Pittsburgh 1 site is a network gateway and colocation building on South 25th Street in Pittsburgh's South Side Flats.
5.21 miles American Tower: Pittsburgh
American Tower's Pittsburgh edge data center is a small modular colocation facility at a tower site in southern Pittsburgh.
5.37 miles Cogent: 3126 Liberty Ave
Cogent's Pittsburgh data center is a colocation facility in the former Sprint network building on Liberty Avenue, at the edge of the Strip District.
5.81 miles H5 Pittsburgh
H5 Pittsburgh is a colocation data center in Pittsburgh's Strip District that H5 Data Centers bought from vXchnge in 2022.
6.48 miles AT&T: 635 Grant St
AT&T's 16-story network building at 635 Grant Street in downtown Pittsburgh, owned by Reign Capital since a 2021 sale-leaseback.
6.51 miles Verizon: 416 7th Ave
Verizon's Downtown Pittsburgh central office in the 20-story Bell Telephone Building houses the area's main tandem switch and a regional signaling hub.
6.72 miles DQE Communications Pittsburgh
DQE Communications' downtown Pittsburgh colocation room and network node inside the Pittsburgh Tech Center at 322 Fourth Avenue.
6.73 miles E.V. Bishoff: Pittsburgh Tech Center
The Pittsburgh Tech Center at 322 Fourth Avenue is E.V. Bishoff's downtown data center and telecom building, home to DQE and several colocation providers.
6.95 miles Next Tier Connect: Pittsburgh East
Next Tier Connect Pittsburgh East is a mission-critical technology campus in the former Westinghouse Energy Center in Monroeville that hosts the Pittsburgh Supercomputing Center's Bridges-2.
7.05 miles Verizon: 3 Allegheny Ctr
A former XO Communications network and colocation node at 3 Allegheny Center on Pittsburgh's North Side; the building now holds apartments.
7.05 miles DataBank Pittsburgh PIT1
DataBank PIT1 is a carrier-neutral colocation data center in Nova Place on Pittsburgh's North Side that hosts the Pittsburgh Internet Exchange.
7.08 miles Expedient Pittsburgh (North Side)
Expedient's North Side data center is a colocation and cloud facility in Nova Place, the former Allegheny Center Mall, on Pittsburgh's North Side.
8.40 miles Dynamo DC: Springdale
Dynamo DC plans a single large AI data center on the site of the former Cheswick Generating Station in Springdale, north-east of Pittsburgh.
8.93 miles Expedient Pittsburgh (Green Tree)
Expedient's Green Tree data center is the company's original Pittsburgh colocation facility, in Green Tree Borough south-west of downtown.
8.97 miles EdgeConneX Pittsburgh
EdgeConneX Pittsburgh is an edge colocation data center west of downtown Pittsburgh in a building EdgeConneX owns.
9.47 miles Consolidated Evergreen
Consolidated Communications resold colocation space inside MSA's Evergreen Heights data center north of Pittsburgh until about 2025.
9.48 miles MSA: Evergreen Hights
MSA's Evergreen Heights data center is a Tier III-designed colocation facility in a hillside bunker in Ross Township, north of Pittsburgh.
10.91 miles Henderson Road Data Center
Hendricks Group proposes a large data center campus with its own gas power plant on a former landfill on Henderson Road in Elizabeth Township, Allegheny County.
11.90 miles MSA: Rockpointe
MSA's RockPointe data center is the original Tier III colocation facility of Management Science Associates, in West Deer Township north-east of Pittsburgh.
11.90 miles Consolidated Rockpointe
Consolidated Communications resold colocation space inside MSA's RockPointe data center in West Deer Township until about 2025.
14.16 miles Ardent (Northern Data): Pittsburgh, Pennsylvania
Ardent Data Centers, part of Northern Data, runs an AI-ready colocation data center in Robinson Township, west of Pittsburgh.
14.25 miles TECfusions: New Kensington, PA
TECfusions' Keystone Connect is an AI data center campus at the former Alcoa Technical Center in Upper Burrell Township, north-east of Pittsburgh.
16.74 miles DataBank Pittsburgh PIT2
DataBank PIT2 is a colocation data center in a former PNC Bank data center in North Fayette Township, west of Pittsburgh, where PNC remains a tenant.
19.49 miles TriEnergy: Stanton Farm
TriEnergy proposes a large single-building data center on the Stanton Farm off Route 31 in South Huntingdon Township, Westmoreland County.

Operating Company

Operated by:
0
Facilities
0
Markets

News See all

Read Pittsburgh Data Center up for Sale or Lease
Pittsburgh Data Center up for Sale or Lease

Pittsburgh Data Center up for Sale or Lease

June 01, 2023 Pittsburgh

A data center for sale or lease is available in Pittsburgh, Pennsylvania. Colliers and Five 9s Digital are offering the McKees Rock facility located at 615 McMichael Road. The site is listed for lease in Colliers' materials, but Five 9s claims it can be purchased or leased. The circa...

Read more
Read iM Critical Starts Work on its Pittsburgh Modular Edge Campus
Baxtel

iM Critical Starts Work on its Pittsburgh Modular Edge Campus

May 18, 2022 Pittsburgh

iM Critical has begun constructing a modular Edge data center campus in Pittsburgh, Pennsylvania. The data center campus will have three buildings when fully built out. It will also include EV charging stations and on-site solar power. iM Critical says the data center will support more than 35kW...

Read more
Read iM Critical To Develop 10MW Data Center Campus in Pittsburgh
Baxtel

iM Critical To Develop 10MW Data Center Campus in Pittsburgh

April 27, 2022 Pittsburgh

iM Critical has announced its plans to develop a modular data center campus in Pittsburgh, Pennsylvania. The campus will be developed on a 5.4-acre site. In addition, it will provide 10MW in capacity. According to the company, the first phase of development will offer 3MW, and it will come online...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.