Lumen: Pittsburgh 2

Latest Podcast
200 Technology Dr
Operational
Fully operational facility
Operated by:

Lumen: Pittsburgh 2

Year Built: 2004
░░░ Request Dataset MW
Total Power
░░░░░ Login to view SqFt
Gross Colocation Size

Map and Nearby Locations:

200 Technology Dr
Lumen Technologies Sites
Nearby Facilities

Sites within 15 miles of Lumen: Pittsburgh 2

Distance Site About
0.66 miles Lumen Pittsburgh 1
1.86 miles H5 Pittsburgh
2.13 miles Cogent: 650 Smithfield
2.23 miles DQE Communications Pittsburgh
2.47 miles American Tower: Pittsburgh
2.80 miles DataBank Pittsburgh PIT1
2.82 miles Verizon: 3 Allegheny Ctr
Former XO Communications site
2.85 miles Expedient Pittsburgh (North Side)
The site is known as Nova Place or "North Side". It was formerly known as Allegheny Center Mall (ACM)
4.36 miles Expedient Pittsburgh (Green Tree)
4.57 miles EdgeConneX Pittsburgh
6.31 miles SunCap: McKees Rocks, PA
SunCap Industries, an affiliate of SunCap Property Group, is proposing a data center on the 72-acre RockPoint Industrial site in Stowe Township, PA.
6.77 miles Consolidated Evergreen
6.78 miles MSA: Evergreen Hights
The facility is designed from the ground up to exceed Tier III uptime standards.
9.61 miles Crypto Mining Data Center Request Dataset
Ardent Data Centers, a Northern Data Group company, has finalized the acquisition of a new data center site in Pittsburgh, Pennsylvania. The 41,000 sq ft (3,900 sqm) expanded the site to 20MW.
11.62 miles Cheswick Generating Station
Allegheny DC Property Co. plans to develop a data center complex on the 47-acre site of the former Cheswick Generating Station in Springdale, Pennsylvania.
12.22 miles DataBank Pittsburgh PIT2
Databank acquired the facility in 2019 from PNC Bank in a sale-leaseback transaction. BNC Bank occupies the entire second floor.
13.95 miles MSA: Rockpointe
MSA’s original facility is Tier III.
14.23 miles Consolidated Rockpointe
18.39 miles TECfusions: New Kensington, PA
In January 2024, TECfusions acquired this 1,350-acre site located 30 miles to the northeast of Pittsburgh.
19.93 miles QTS: Salem Township, Pennsylvania
QTS is proposing a 1,700+ acre technology campus in Salem Township, Pennsylvania, designed to meet growing demand for data center and AI infrastructure.

Lumen: Pittsburgh 2 Data Center Photos (See all)

Operating Company

Operated by:

The combined company of CenturyLink and Level(3) has one of the largest networks in the world.

The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).

A Timeline of Level 3 Acquisitions

  • 2020: CenturyLink rebrands as Lumen Technologies
  • 2017: CenturyLink acquired Level 3's data centers and network for $34 billion
  • 2015: Black Lotus (for Level3's DDoS mitigation product)
  • 2014 Level 3 acquired TW Telecom for $5.7 billion
  • 2012 Level 3 acquired Voxility
  • 2011 Level 3 acquired Global Crossing (GX) for $2.0 Billion
  • 2007: Level(3) acquired Broadwing for $1.4 billion
  • 2006: Level(3) acquired Progress Telecom for $137 million
  • 2006: Level3 acquired Looking Glass Networks for $96 million
  • 2006: Level3 acquired Telcove (Adelphia Business Solutions) for $1.2 billion
  • 2006: Level3 acquired ICG Communications for $163 million
  • 2005: Level 3 acquired WilTel for $680 million
  • 2002: Level3 acquired Genuity for $242 million
261
Facilities
79
Markets
277MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?