Iron Mountain: Miamisburg (OHS-1)

Latest Podcast 3366 S Tech Blvd
Operational
Fully operational facility
Operated by:

Iron Mountain: Miamisburg (OHS-1)

Year Built: 2012
Utility Provider: AES Ohio
Ownership: Iron Mountain owns the real estate.
Lot Size: 4 acres

Sites leasing space from Iron Mountain:

░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Iron Mountain Data Centers runs OHS-1 in a former Leather Gallery furniture store on South Tech Boulevard, between Dayton and Cincinnati. IO converted the building into a modular data center in 2012. LexisNexis moved in that November as its first tenant. Iron Mountain took over the site in January 2018, when it bought IO's US data center business for $1.34 billion.

The facility uses modular data halls rated up to 20 kW per rack. Power and generators run 2N, and chillers and air handlers run N+1. The first phase of data center 1 has an Uptime Tier III-certified design, and the site sits outside the 100- and 500-year floodplains.

Site History

  • January 2018: Iron Mountain closes its purchase of IO's US data centers.
  • November 2012: LexisNexis moves into the data center.
  • July 2012: IO begins converting the former Leather Gallery store.

Project Profile

  • Carriers: AT&T, Cogent, Lumen, Spectrum, Verizon and Zayo, with Megaport on site.
  • Security: three-factor access (retina scan, key card and PIN), mantraps, on-site guards and CCTV around the clock.

Map and Nearby Locations

3366 S Tech Blvd
Iron Mountain Sites
Nearby Facilities

Iron Mountain: Miamisburg (OHS-1) Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Iron Mountain: Miamisburg (OHS-1)

Distance Site
0.01 miles LexisNexis Springboro
1.80 miles Encore Technologies MSB1
6.47 miles Verizon: Waynesville, OH
10.75 miles Lumen Dayton
10.93 miles Brightspeed: Lebanon
10.95 miles Reynolds and Reynolds: Kettering
11.84 miles Lumen Dayton 3
11.91 miles AT&T: Dayton Main
11.91 miles DataYard: Dayton
11.94 miles AT&T: Dayton 300 W 1st St
13.99 miles CyrusOne Cincinnati-Lebanon
14.10 miles CyrusOne Lebanon CIN7
15.02 miles Hyperscale Data CenterInterested in this information?Contact us
15.13 miles Hyperscale Data CenterInterested in this information?Contact us
15.18 miles Prologis: Cincinnati, Ohio
15.21 miles Hyperscale Data CenterInterested in this information?Contact us
15.24 miles Hyperscale Data CenterInterested in this information?Contact us
15.72 miles U.S. Air Force: IT Complex (Bldg 802)
15.94 miles U.S. Air Force: AFRL DSRC (Bldg 676)
16.26 miles Edge CampusInterested in this information?Contact us
16.50 miles Landmark Dividend: Dayton, OH

Operating Company

Operated by:

Iron Mountain Data Centers is the data center business of Iron Mountain Incorporated and operates sites in the United States and Europe, with an India platform built through its partnership with Web Werks. In January 2018 it closed the acquisition of IO Data Centers, adding facilities in Phoenix and Scottsdale, Arizona, Edison, New Jersey, and Columbus, Ohio. In May 2018 it acquired EvoSwitch Netherlands, expanding into the Amsterdam market, and in 2019 it added capacity in Amsterdam and London. In India, Iron Mountain formed a joint venture with Web Werks in 2021 and in April 2025 it announced full ownership and a rebrand to Iron Mountain Data Centers India. Iron Mountain Incorporated was founded in 1951.

Iron Mountain Data Centers History:

  • In April 2025, acquired the remaining stake in Web Werks and rebranded the India business to Iron Mountain Data Centers.
  • 2021: Formed a joint venture with Web Werks to develop and operate data centers in India.
  • May 2018: Acquired EvoSwitch Netherlands, expanding into the Amsterdam market.
  • January 2018: Closed the acquisition of IO Data Centers’ U.S. operations.
  • 1951: Iron Mountain Incorporated was founded.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Iron Mountain Completes Structural Build of Chennai Data Center
Iron Mountain Completes Structural Build of Chennai Data Center

Iron Mountain Completes Structural Build of Chennai Data Center

April 13, 2026 Iron Mountain

Iron Mountain has topped out a new data center in Chennai, India.“We are thrilled to celebrate a recent major milestone in our global expansion: the official topping-out ceremony of our Chennai CHN-1 data center in Ambattur!” the company said on LinkedIn this week. “As the structural framework...

Read more
Read Iron Mountain Plans a Seven-building Data Center Campus Outside Austin, Texas
Iron Mountain Plans a Seven-building Data Center Campus Outside Austin, Texas

Iron Mountain Plans a Seven-building Data Center Campus Outside Austin, Texas

March 18, 2026 Iron Mountain

Iron Mountain is targeting a new data center development outside Austin, Texas. First reported by BizJournal, the company is targeting a campus outside the city of Hutto in Williamson County.The Hutto City Council last week reviewed a presentation from Iron Mountain on its Taylor Meadows data...

Read more
Read Iron Mountain to convert records management facility in Miami to a data center
Iron Mountain to convert records management facility in Miami to a data center

Iron Mountain to convert records management facility in Miami to a data center

November 06, 2023 Iron Mountain

Iron Mountain is to convert one of its former records management facilities in Miami, Florida, into a data center that will offer 16MW. Iron Mountain CEO William L. Meaney said during the company's Q3 2023 earnings call last week, “Miami is a key market where a number of our customers are...

Read more
Read Web Werks & Iron Mountain acquire 4 acres in Chennai for DC construction
Web Werks & Iron Mountain acquire 4 acres in Chennai for DC construction

Web Werks & Iron Mountain acquire 4 acres in Chennai for DC construction

October 17, 2023 Web Werks

Web Werks and Iron Mountain recently purchased a four-acre parcel of land in the Ambattur area of Chennai, India for the construction of two data center campuses. These parcel will support two buildings called CHE-1 and CHE-2 which will be built to Tier III standards and will support a total of...

Read more
Read Iron Mountain signs 24/7 PPA for hydropower in US
Iron Mountain signs 24/7 PPA for hydropower in US

Iron Mountain signs 24/7 PPA for hydropower in US

July 04, 2023 Iron Mountain

Iron Mountain has signed a 24/7 PPA agreement with Rye Development, a US hydropower developer, for 150 ME of power over the next ten years from a number of the developer's low-impact hydroelectric projects. Rye Development seeks to integrate power generation capabilities into existing dams...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.