|
0.26 miles
|
Vantage WA13
|
|
|
0.29 miles
|
Vantage WA12
|
|
|
0.31 miles
|
Vantage WA11
|
|
|
0.40 miles
|
H5: Quincy III
|
H5 Quincy III is Yahoo's 2017 Project Genesis Computing Coop building at 1500 M Street NE on H5's Quincy campus in Quincy, Washington.
|
|
0.45 miles
|
Sabey: Intergate.Quincy (Building B)
|
|
|
0.47 miles
|
Sabey: Intergate.Quincy (Building C)
|
Intergate.Quincy is a 525,000 square foot data center five building campus in Central Washington. Like Intergate. Columbia, Intergate.Quincy offers the advantage of low power rates, close proximity to the region’s power grid, and a mild climate ideal for efficient, evaporative cooling.
|
|
0.53 miles
|
Sabey: Intergate.Quincy (Building A)
|
|
|
0.58 miles
|
H5: Quincy II
|
H5 Quincy II is Yahoo's original Quincy data center complex at 1305 Intermodal Way NE: a 2007 chilled-water hall building plus Yahoo Computing Coop buildings added in 2011 and 2013.
|
|
0.59 miles
|
Sabey: Intergate.Quincy (Building E)
|
|
|
0.61 miles
|
Sabey: Intergate.Quincy (Building D)
|
|
|
2.06 miles
|
Global ValleyInterested in this information?Contact us
|
CO7 is a small hall that Microsoft built in 2021-2022 in the northeast corner of its Columbia campus in Quincy, backed by a 1.5 MWe primary generator and a reserve unit.
|
|
2.07 miles
|
North PlazaInterested in this information?Contact us
|
CO9 is a two-level building on Microsoft's Columbia campus in Quincy. Microsoft built it in 2011-2012 as CO3.1 and rebuilt it in 2022-2024 for telecommunications use.
|
|
2.08 miles
|
Prime CampusInterested in this information?Contact us
|
CO3.2 is the middle building of the CO3 group, which Microsoft built in 2010-2011 with Generation 4 ITPAC halls on its Columbia campus in Quincy.
|
|
2.10 miles
|
Prime PointInterested in this information?Contact us
|
CO3.3 is the south building of the CO3 group, which Microsoft built in 2010-2011 on its Columbia campus in Quincy.
|
|
2.16 miles
|
Core PointInterested in this information?Contact us
|
CO1 is the east half of the original 470,000 sq ft Columbia building, Microsoft's first data center in Quincy. Its five data halls are backed by 12 Caterpillar 3516C 2.5 MWe diesel generators.
|
|
2.24 miles
|
Point UltraInterested in this information?Contact us
|
CO8 is a small hall that Microsoft built in 2021-2022 at the east end of the CO4 module row on its Columbia campus in Quincy, backed by a 1.5 MWe primary generator and a reserve unit.
|
|
2.25 miles
|
Park PrimeInterested in this information?Contact us
|
CO2 is the west half of the original 470,000 sq ft Columbia building on Microsoft's first Quincy campus. Its five data halls are backed by 12 Caterpillar 3516C 2.5 MWe diesel generators.
|
|
2.25 miles
|
NTT Data Quincy
|
The data center was first built by Dell in 2012. Subsequently sold to NTT Data in the Perot services deal.
|
|
2.26 miles
|
North PlazaInterested in this information?Contact us
|
CO6 is a hall that Microsoft built in 2019-2021 along the south face of CO2 on its Columbia campus in Quincy, backed by five Caterpillar 3516C 2.5 MWe generators.
|
|
2.31 miles
|
Plaza MaxInterested in this information?Contact us
|
CO5 is a row of open-air modules on Microsoft's Columbia campus in Quincy, built in 2016-2018 and run without backup generators.
|
|
2.34 miles
|
TowerInterested in this information?Contact us
|
CO4 is a row of open-air Generation 4 modules on Microsoft's Columbia campus in Quincy, built in 2013-2015 and run without backup generators.
|
|
2.42 miles
|
CyrusOne Quincy
|
CyrusOne acquired this 45-acre plot of land in Quincy in 2016, and started construction in early 2023.
|
|
3.07 miles
|
Ridge TwoInterested in this information?Contact us
|
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
|
|
3.08 miles
|
StationInterested in this information?Contact us
|
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
|
|
3.14 miles
|
ThreeInterested in this information?Contact us
|
MWH01 AZ-A is one of four first-phase AZ halls on Microsoft's MWH campus in Quincy, backed by four Caterpillar 3516C 2.5 MWe generators plus one reserve unit.
|
|
3.15 miles
|
Global ValleyInterested in this information?Contact us
|
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
|
|
3.16 miles
|
Global CenterInterested in this information?Contact us
|
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
|
|
3.17 miles
|
Valley ThreeInterested in this information?Contact us
|
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
|
|
3.26 miles
|
Park PlusInterested in this information?Contact us
|
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
|
|
3.28 miles
|
Station PlusInterested in this information?Contact us
|
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
|
|
3.34 miles
|
Valley BetaInterested in this information?Contact us
|
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
|
|
3.34 miles
|
Valley GammaInterested in this information?Contact us
|
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
|
|
3.36 miles
|
Prime PlazaInterested in this information?Contact us
|
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
|
|
3.36 miles
|
Metro PointInterested in this information?Contact us
|
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
|
|
3.69 miles
|
Metro StationInterested in this information?Contact us
|
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
|
|
13.26 miles
|
GlobalInterested in this information?Contact us
|
Purpose-built in 2023, the Fortress facility sits in the heart of Grant County’s low-cost hydroelectric zone.
|
|
17.49 miles
|
BetaInterested in this information?Contact us
|
Microsoft has filed plans to build a campus with three data centers in Malaga, Washington. Microsoft acquired more than 100 acres in a deal spread across two phases; Phase I is the Lojo Property, 72.5 acres at 5375 Malaga Alcoa Highway for which Microsoft paid $6.6 million.
|
|
17.54 miles
|
Core PointInterested in this information?Contact us
|
Microsoft has filed plans to build a campus with three data centers in Malaga, Washington. The development will construct the first building on the site by the end of 2025, with potential for two more buildings by 2027.
|
|
17.58 miles
|
OneInterested in this information?Contact us
|
Microsoft has filed plans to build a campus with three data centers in Malaga, Washington. The development will construct the first building on the site by the end of 2025, with potential for two more buildings by 2027.
|
|
19.40 miles
|
Sabey: SDC Malaga
|
Sabey-owned planned 144 MW campus near Malaga, WA (Chelan County), in Chelan County PUD substation/transmission study phase; Q2 2030 target with possible acceleration to 2029.
|