H5: Quincy I

Latest Podcast 1711 M St NE
OperationalPlanned
Operational with future phases planned
Operated by:

H5: Quincy I

PUE: 1.35
Utility Provider: Grant County PUD
Ownership: H5 Data Centers owns the building.
Lot Size: 63 acres
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

H5 acquired the building from Intuit in July 2018. Intuit will still be a tenant in the facility.

  • 63-acre data center campus with an existing 240,000 square-foot building
  • Over 40 mWs of turn-key colocation space at full build-out
  • Approx. $0.03/kWh average annual cost of power
  • Access to 100% renewable hydro power
  • 100% Washington state sales and use tax abatement on data center equipment
  • High-density deployments of up to 500 Watts per square foot

Map and Nearby Locations

1711 M St NE
H5 Data Centers Sites
Nearby Facilities

Sites within 15 miles of H5: Quincy I

Distance Site About
0.26 miles Vantage WA13
0.29 miles Vantage WA12
0.31 miles Vantage WA11
0.40 miles H5: Quincy III
H5 Quincy III is Yahoo's 2017 Project Genesis Computing Coop building at 1500 M Street NE on H5's Quincy campus in Quincy, Washington.
0.45 miles Sabey: Intergate.Quincy (Building B)
0.47 miles Sabey: Intergate.Quincy (Building C)
Intergate.Quincy is a 525,000 square foot data center five building campus in Central Washington. Like Intergate. Columbia, Intergate.Quincy offers the advantage of low power rates, close proximity to the region’s power grid, and a mild climate ideal for efficient, evaporative cooling.
0.53 miles Sabey: Intergate.Quincy (Building A)
0.58 miles H5: Quincy II
H5 Quincy II is Yahoo's original Quincy data center complex at 1305 Intermodal Way NE: a 2007 chilled-water hall building plus Yahoo Computing Coop buildings added in 2011 and 2013.
0.59 miles Sabey: Intergate.Quincy (Building E)
0.61 miles Sabey: Intergate.Quincy (Building D)
2.06 miles Global ValleyInterested in this information?Contact us
CO7 is a small hall that Microsoft built in 2021-2022 in the northeast corner of its Columbia campus in Quincy, backed by a 1.5 MWe primary generator and a reserve unit.
2.07 miles North PlazaInterested in this information?Contact us
CO9 is a two-level building on Microsoft's Columbia campus in Quincy. Microsoft built it in 2011-2012 as CO3.1 and rebuilt it in 2022-2024 for telecommunications use.
2.08 miles Prime CampusInterested in this information?Contact us
CO3.2 is the middle building of the CO3 group, which Microsoft built in 2010-2011 with Generation 4 ITPAC halls on its Columbia campus in Quincy.
2.10 miles Prime PointInterested in this information?Contact us
CO3.3 is the south building of the CO3 group, which Microsoft built in 2010-2011 on its Columbia campus in Quincy.
2.16 miles Core PointInterested in this information?Contact us
CO1 is the east half of the original 470,000 sq ft Columbia building, Microsoft's first data center in Quincy. Its five data halls are backed by 12 Caterpillar 3516C 2.5 MWe diesel generators.
2.24 miles Point UltraInterested in this information?Contact us
CO8 is a small hall that Microsoft built in 2021-2022 at the east end of the CO4 module row on its Columbia campus in Quincy, backed by a 1.5 MWe primary generator and a reserve unit.
2.25 miles Park PrimeInterested in this information?Contact us
CO2 is the west half of the original 470,000 sq ft Columbia building on Microsoft's first Quincy campus. Its five data halls are backed by 12 Caterpillar 3516C 2.5 MWe diesel generators.
2.25 miles NTT Data Quincy
The data center was first built by Dell in 2012. Subsequently sold to NTT Data in the Perot services deal.
2.26 miles North PlazaInterested in this information?Contact us
CO6 is a hall that Microsoft built in 2019-2021 along the south face of CO2 on its Columbia campus in Quincy, backed by five Caterpillar 3516C 2.5 MWe generators.
2.31 miles Plaza MaxInterested in this information?Contact us
CO5 is a row of open-air modules on Microsoft's Columbia campus in Quincy, built in 2016-2018 and run without backup generators.
2.34 miles TowerInterested in this information?Contact us
CO4 is a row of open-air Generation 4 modules on Microsoft's Columbia campus in Quincy, built in 2013-2015 and run without backup generators.
2.42 miles CyrusOne Quincy
CyrusOne acquired this 45-acre plot of land in Quincy in 2016, and started construction in early 2023.
3.07 miles Ridge TwoInterested in this information?Contact us
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
3.08 miles StationInterested in this information?Contact us
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
3.14 miles ThreeInterested in this information?Contact us
MWH01 AZ-A is one of four first-phase AZ halls on Microsoft's MWH campus in Quincy, backed by four Caterpillar 3516C 2.5 MWe generators plus one reserve unit.
3.15 miles Global ValleyInterested in this information?Contact us
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
3.16 miles Global CenterInterested in this information?Contact us
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
3.17 miles Valley ThreeInterested in this information?Contact us
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
3.26 miles Park PlusInterested in this information?Contact us
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
3.28 miles Station PlusInterested in this information?Contact us
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
3.34 miles Valley BetaInterested in this information?Contact us
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
3.34 miles Valley GammaInterested in this information?Contact us
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
3.36 miles Prime PlazaInterested in this information?Contact us
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
3.36 miles Metro PointInterested in this information?Contact us
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
3.69 miles Metro StationInterested in this information?Contact us
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
13.26 miles GlobalInterested in this information?Contact us
Purpose-built in 2023, the Fortress facility sits in the heart of Grant County’s low-cost hydroelectric zone.
17.49 miles BetaInterested in this information?Contact us
Microsoft has filed plans to build a campus with three data centers in Malaga, Washington. Microsoft acquired more than 100 acres in a deal spread across two phases; Phase I is the Lojo Property, 72.5 acres at 5375 Malaga Alcoa Highway for which Microsoft paid $6.6 million.
17.54 miles Core PointInterested in this information?Contact us
Microsoft has filed plans to build a campus with three data centers in Malaga, Washington. The development will construct the first building on the site by the end of 2025, with potential for two more buildings by 2027.
17.58 miles OneInterested in this information?Contact us
Microsoft has filed plans to build a campus with three data centers in Malaga, Washington. The development will construct the first building on the site by the end of 2025, with potential for two more buildings by 2027.
19.40 miles Sabey: SDC Malaga
Sabey-owned planned 144 MW campus near Malaga, WA (Chelan County), in Chelan County PUD substation/transmission study phase; Q2 2030 target with possible acceleration to 2029.

H5: Quincy I Data Center Photos See all

Exterior of H5's Quincy Facility
Source: H5

Operating Company

Operated by:

H5 Company History:


0
Facilities
0
Markets
0MW
Megawatts

News See all

Read H5 expands its San Antonio data center
H5 expands its San Antonio data center

H5 expands its San Antonio data center

November 21, 2023 H5 Data Centers

H5 this week announced the phase three expansion of its 100 Taylor Street facility, adding an additional 340 cabinets and up to 1.5MW of additional UPS capacity. This site, located at 100 Taylor Street, was acquired by H5 in 2018 and was previously owned by the Texas ISP Taylor Telecom. It is an...

Read more
Read H5 Data Centers to expand its Phoenix data center
H5 Data Centers to expand its Phoenix data center

H5 Data Centers to expand its Phoenix data center

July 04, 2023 H5 Data Centers

H5 Data Centers has announced a 30,000 sqft expansion of its Phoenix colocation facility. Located at 2600 W. Germann Road in Chandler, AZ, this expansion is part of the company's third phase of development at the 180,000-square-foot data center. Further to this square-footage expansion, phase...

Read more
Read Construction of H5's Ashburn, VA Data Center Begins
Construction of H5's Ashburn, VA Data Center Begins

Construction of H5's Ashburn, VA Data Center Begins

March 22, 2023 H5 Data Centers

After dismantling the former data center there, H5 Data Centers has started construction on a new one in Ashburn, Virginia. This week, the company started building a 255,000-square-foot, three-story data center with a 42-megawatt capacity. The building is offered for pre-leasing at Loudoun...

Read more
Read H5 Data Centers Completes The Acquisition of Seven Data Centers From vXchnge
H5 Data Centers Completes The Acquisition of Seven Data Centers From vXchnge

H5 Data Centers Completes The Acquisition of Seven Data Centers From vXchnge

February 01, 2022 H5 Data Centers

H5 Data Centers has announced that it has completed the acquisition of seven data center facilities from vXchnge across the United States. With this development, vXchnge has just one data center. With this agreement, H5 data centers has added over 250,000 square feet (23,200 square meters) of...

Read more
Read H5 Data Centers expands in Ohio through a data center acquisition
H5 Data Centers expands in Ohio through a data center acquisition

H5 Data Centers expands in Ohio through a data center acquisition

December 15, 2021 H5 Data Centers

H5 Data Centers has completed the acquisition of a data center at 925 Dalton Avenue, Cincinnati, Ohio. The 107,000 square feet (9,940 square meters) purpose-built data center was built to Tier III standards. It currently has a 2MW capacity, but it can be expanded to 6MW upon full buildout. H5...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?