H5 Quincy

1117 M St NE

░░░░░░░ Login to view SqFt Total Building Size

░░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

H5 acquired the building from Intuit in July 2018. Intuit will still be a tenant in the facility.

  • 63-acre data center campus with an existing 240,000 square-foot building
  • Over 40 mWs of turn-key colocation space at full build-out
  • Approx. $0.03/kWh average annual cost of power
  • Access to 100% renewable hydro power
  • 100% Washington state sales and use tax abatement on data center equipment
  • High-density deployments of up to 500 Watts per square foot

Map and Nearby Locations:

1117 M St NE
Click Map to begin Search

Sites within 15 miles of H5 Quincy

Show SqM
Distance Site About
0.26 miles Vantage WA13
0.29 miles Vantage WA12
0.29 miles Vantage Quincy Campus
Vantage operates a 68-acre campus with three large data centers.
0.31 miles Vantage WA11
0.47 miles Sabey Intergate.Quincy
Intergate.Quincy is a 525,000 square foot data center five building campus in Central Washington. Like Intergate. Columbia, Intergate.Quincy offers the advantage of low power rates, close proximity to the region’s power grid, and a mild climate ideal for efficient, evaporative cooling.
0.53 miles Yahoo-Oath Quincy
"DC1" 180,000 sqft and 26 MW
"DC2" 151,000 sqft and 26 MW
2.25 miles NTT Data Quincy
The data center was first built by Dell in 2012. Subsequently sold to NTT Data in the Perot services deal.
2.42 miles CyrusOne Quincy
CyrusOne acquired this 45-acre plot of land in Quincy in 2016, and started construction in early 2023.
3.02 miles Microsoft Quincy MWH
Microsoft was one of the first companies to build a data center in Quincy. In 2006 Microsoft constructed the first phase (470,000 square feet) of the ‘Columbia Data Center’ in Quincy, Washington
17.43 miles MIcrosoft: Malaga, WA
Microsoft has filed plans to build a campus with three data centers in Malaga, Washington. Microsoft acquired more than 100 acres in a deal spread across two phases; Phase I is the Lojo Property, 72.5 acres at 5375 Malaga Alcoa Highway for which Microsoft paid $6.6 million.
17.59 miles Microsoft: Malaga 2
Microsoft has filed plans to build a campus with three data centers in Malaga, Washington. The development will construct the first building on the site by the end of 2025, with potential for two more buildings by 2027.
17.70 miles Microsoft: Malaga 3
Microsoft has filed plans to build a campus with three data centers in Malaga, Washington. The development will construct the first building on the site by the end of 2025, with potential for two more buildings by 2027.

H5 Quincy Data Center Photos


Exterior of H5's Quincy Facility
Source: H5

Operating Company

H5 Company History:


  • July 2018, Acquires Intiuit datacenter in Quincy, WA
  • March 2018, H5 Expands to Albuquerque (505 Marquette)
  • January 2017, the Cleveland Technology Center (CTC) from ByteGrid. Source: Telecom Ramblings
  • January 2016 H5 acquired NextFort and its Phoenix datacenter.
  • June 2015, H5 acquired their Ashburn datacenter. Source: H5 Press Release
22 Facilities Owned
21 Markets Served
109.85 Megawatts
View Company