Carrier-Neutral Data Center

Latest Podcast
Dallas-Fort Worth Metropolitan Area
Planned
Future facility in planning stage
Operated by:

H5: Dallas Ft Worth

Year Planned: 2028

H5 Data Centers is launching a new multi-phase development in the Dallas-Fort Worth metroplex, with Phase 1 officially greenlit for pre-leasing.

Map and Nearby Locations:

Dallas-Fort Worth Metropolitan Area
H5 Data Centers Sites
Nearby Facilities

H5: Dallas Ft Worth Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Carrier-Neutral Data Center

Distance Site About
0.02 miles Lumen For Worth 3
0.14 miles LOGIX Fort Worth
In 2018 LOGIX Communications acquired Alpheus Communications and this site.
0.55 miles Lumen Fort Worth 1
0.59 miles Lumen Fort Worth 2
7.05 miles Novartis
8.22 miles 5CDC: Dallas DFW01
The facility encompasses eight data halls (PODs) optimized to accommodate average densities of over 400W per square foot.
8.56 miles Black Mountain: Fort Worth, TX
Black Mountain has filed to rezone 141 acres at the intersection of Lon Stephenson Road and Forest Hill Drive to develop a data center.
8.69 miles Hyperscale Data Center Request Dataset
9.81 miles Edged Energy: DFW02
Edged has filed to build a new data center at 9999 Chapin School Road in Fort Worth, advancing a proposed multi-phase campus in the Veale Ranch area near Benbrook.
9.98 miles Edged Energy: DFW02 Expansion
10.21 miles Edged Energy: Ft. Worth DFW02
Edged Energy intends to construct another data center campus in Fort Worth, with operations expected to begin in Q2 2027.
10.69 miles Prime: DFW04-03
Prime Data Centers is building a $1.6 billion campus near Benbrook. The project includes three, two-story structures being built near Aledo and Chapin School roads. The site is slated for completion by January 2026.
10.81 miles Prime: Dallas DFW04-01
Prime Data Centers is building a $1.6 billion campus near Benbrook. The project includes three, two-story structures being built near Aledo and Chapin School roads. The site is slated for completion by 2026.
10.85 miles Prime: DFW04-02
Prime Data Centers is building a $1.6 billion campus near Benbrook. The project includes three, two-story structures being built near Aledo and Chapin School roads. The site is slated for completion by January 2026.
10.86 miles CyrusOne: DFW7
Dubbed DFW7, the project will encompass 1.9 million square feet and feature multiple buildings.
11.21 miles ACS: Fort Worth Expansion
11.23 miles ACS: Fort Worth, Texas
The proposed development, located on a 107-acre site near Hicks Field Road, will feature five buildings and an associated substation.
11.94 miles Mapletree: 5000 South Bowen
12.55 miles Rock Creek Expansion
12.55 miles Rock Creek Data Center Project
The proposed data center, known as the Rock Creek Data Center Project, is a large-scale commercial development planned for a 121-acre tract at 10375 Old Granbury Road in Fort Worth.
16.29 miles Tierpoint Fort Worth
The property came to market in 2023 and was acquired by Tierpoint.
16.36 miles STACK Fort Worth Alliance
STACK's expansion Alliance campus in Fort Worth
16.51 miles Hyperscale Data Center Request Dataset
When completed, the Fort Worth site will be Facebook’s largest data center to date, four buildings connected to form two “H” shapes, plus one standalone center, for a total of 20 data hall
16.71 miles QTS: FTW1-DC2
QTS Data Centers is building a second data center adjacent to its first one near the Alliance Texas development. The two-story building is set to span 471,875 sq ft (43,840 sqm) and see $220 million invested in the project.
16.80 miles QTS Dallas Fort Worth
QTS's Forth Worth site is the company's second data center in Dallas Market.
17.72 miles Centersquare: Fort Worth DFW1
Centrally located in the Dallas-Fort Worth area, the campus has single-story purpose-built data centers and a two-story attached administrative building on a fiber-linked campus. The data center campus is located just 6 miles from Dallas/Ft. Worth International Airport (DFW) and 14 miles from Dallas Love Field Airport.
17.92 miles Rackspace Grapevine DFW1
18.19 miles Citigroup Fort Worth

Carrier-Neutral Data Center Data Center Photos (See all)

Operating Company

Operated by:

H5 Company History:


  • July 2018, Acquires Intiuit datacenter in Quincy, WA
  • March 2018, H5 Expands to Albuquerque (505 Marquette)
  • January 2017, the Cleveland Technology Center (CTC) from ByteGrid. Source: Telecom Ramblings
  • January 2016 H5 acquired NextFort and its Phoenix datacenter.
  • June 2015, H5 acquired their Ashburn datacenter. Source: H5 Press Release
35
Facilities
26
Markets
281MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?