NorthC: Düsseldorf

Latest Podcast In der Steele 37A
Under ConstructionOperational
Fully operational with expansion in progress

NorthC: Düsseldorf

Site was first built in 2000 and has expansions through 2027
Ownership: NorthC Datacenters does not own the building.
This site is leased from Principal Asset Management in the Connecta Park Complex building
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

In September 2025, NorthC Datacenters officially completed the acquisition of this facility from Colt Technology Services. This site, which was originally a Lumen (Level 3) asset before being bought by Colt in 2023, is now a cornerstone of NorthC’s nationwide German platform.

• Operational since November 2000
• Technical space arranged over three floors
• Total Size: 6,863 m2
• Fully Fitted Colocation space: 1,205m2
• Available Shell & Core Space: 1,812m2
• Carrier Connectivity: Lumen, COLT, T-Com, Versatel, Arcor, Wingas, Telefonica.

Map and Nearby Locations

In der Steele 37A
NorthC Datacenters Sites
Nearby Facilities

NorthC: Düsseldorf Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of NorthC: Düsseldorf

Distance Site About
0.02 miles Connecta Park Complex
0.02 miles Digital Realty: DUS1
0.05 miles Sievers: Dusseldorf
With a total area of ​​6,863 m², the SIEVERS GROUP has access to a modern and innovative data center in a central Düsseldorf location.
0.05 miles Digital Realty: DUS3
0.05 miles Digital Realty: DUS2
0.05 miles Arelion Dusseldorf DDF/B
2.58 miles nLighten Düsseldorf DUS1
3.04 miles AtlasEdge: Düsseldorf
3.40 miles Equinix Düsseldorf DU1
4.26 miles euNetworks Düsseldorf
5.72 miles ITENOS Düsseldorf
5.83 miles Zaunkönigweg 8, Düsseldorf
Three-story data center, Zaunkönigweg 8,
Düsseldorf-Mörsenbroich, Germany.
5.87 miles MyLoc Düsseldorf
8.44 miles Penta Infra Dusseldorf
Penta acquired the facility in March 2020 from Ensono.
9.79 miles Yexio: Heiligenhaus
The Yexio data center, a 9,000-square-meter (96,875 sq ft) facility, is located in the Heiligenhaus Innovation Park in Heiligenhaus, North Rhine-Westphalia, just outside Essen.
10.33 miles North Rhine-Westphalia: Kaarst
The Kaarst Data Center (RZF) in North Rhine-Westphalia, Germany, is a state-owned facility serving as the digital backbone of the NRW Finance Administration.
11.15 miles AtlasEdge: Leverkusen 2
AtlasEdge is expanding its Leverkusen presence with a second data center adjacent to its existing LEV001 facility at Dornierstraße 10, adding new colocation capacity to serve growing enterprise demand in Germany's Rhine-Ruhr region.
11.18 miles AtlasEdge: Leverkusen 1
The data center "LEV1" has been developed as a modular new building at the Leverkusen location
13.04 miles Hub PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.47 miles Level3 Cologne
17.95 miles euNetworks Köln
18.54 miles Penta Infra Cologne
19.28 miles euNetworks Essen
19.43 miles Station OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.78 miles EastInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Operating Company

Operated by:

With ten data centers NorthC is the largest regional data center business in the Netherlands

0
Facilities
0
Markets

News See all

Read NorthC Breaks Ground on 4.5MW Geneva Data Center in Switzerland
NorthC has started construction on its sixth data center in Switzerland, a 4.5MW facility in Meyrin on the edge of Geneva. The building at The Hive technology park will deliver 4.5MW of IT capacity...

NorthC Breaks Ground on 4.5MW Geneva Data Center in Switzerland

October 21, 2026 NorthC Datacenters

NorthC has started construction on its sixth data center in Switzerland, a 4.5MW facility in Meyrin on the edge of Geneva. The building at The Hive technology park will deliver 4.5MW of IT capacity across 5,400 square meters (58,125 sq ft), released in phases of 1.5MW, according to NorthC's...

Read more
Read NorthC Begins Construction Of Data Center In Frankfurt, Germany
European data center operator NorthC has begun construction of a new facility in Frankfurt, Germany.

“A new chapter begins for NorthC Datacenters Deutschland on Mainzer Landstraße: The preparato...

NorthC Begins Construction Of Data Center In Frankfurt, Germany

September 17, 2026 NorthC Datacenters

European data center operator NorthC has begun construction of a new facility in Frankfurt, Germany. “A new chapter begins for NorthC Datacenters Deutschland on Mainzer Landstraße: The preparatory construction work for our new FRA01 data center has begun,” the company said on LinkedIn this week....

Read more
Read Antin Infrastructure Partners Acquires NorthC
Antin Infrastructure Partners Acquires NorthC

Antin Infrastructure Partners Acquires NorthC

December 11, 2025 NorthC Datacenters

Antin Infrastructure Partners this week announced it has agreed to acquire NorthC Datacenters from DWS and other minority shareholders. The transaction is being carried out through Antin’s €10.2 billion Flagship Fund V and is expected to close in the first half of 2026.Stéphane Ifker and...

Read more
Read NorthC to Build Data Center in Basel, Switzerland
NorthC to Build Data Center in Basel, Switzerland

NorthC to Build Data Center in Basel, Switzerland

September 18, 2025 NorthC Datacenters

European data center firm NorthC last week announced it has signed a contract to build a regional data center at the uptownBasel Innovation Campus in Arlesheim.Alexandra Schless, CEO of the NorthC Group, said: “We are very pleased to announce this expansion of the partnership with uptownBasel....

Read more
Read NorthC Renews Lease on Munich Data Center for 25 years
NorthC Renews Lease on Munich Data Center for 25 years

NorthC Renews Lease on Munich Data Center for 25 years

August 22, 2025 NorthC Datacenters

European data center firm NorthC this week has extended its lease on the 4,800 square meters (51,666 sq ft) of data center space with real estate firm Allgemeine Südboden AG for 25 years.Bettina Krause, head of leasing, Allgemeine Südboden: "We are delighted to extend the lease agreement with...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?