DRT Manchester

Latest Podcast Reynolds House
Operational
Fully operational facility
Operated by:

DRT Manchester

This site is leased from CapitaLand in the CapitaLand: Reynolds House building
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Reynold House is a three-storey triple net powered shell data centre located 13 km from Manchester International Airport and 290 km north west of London.

  • CapitaLand Ascendas REIT acquired this data center from Digital Realty in 2021.

Map and Nearby Locations

Reynolds House ( 4 Archway, Manchester Technopark )
Digital Realty Trust Sites
Nearby Facilities

Sites within 15 miles of DRT Manchester

Distance Site About
0.01 miles iomart: DC7 Manchester
In 2012, iomart Group plc acquired Melbourne Server Hosting, gaining two Manchester data centers—Turing House (DC6) and Reynolds House (DC7).
0.01 miles Lunar 1
The Lunar 1 data center, located at Reynolds House in the Manchester Technopark, is an enterprise-grade colocation facility managed by Lunar Digital Solutions Ltd.
0.01 miles Equinix Manchester MA2
0.01 miles Lunar 2
Lunar 2 in Manchester offers colocation with two data halls, 1,500 kg/m² floor load, an N+1 DX CRAC and In-Row cooling system, a 1.5 MVA incoming feed capacity and N+1 generator redundancy with 168-hour fuel capacity at full load.
0.01 miles CapitaLand: Reynolds House
0.06 miles iomart: Melbourne Turing House
0.06 miles iomart DC6 Manchester
The iomart DC6 data center in Manchester (also known as Turing House) became part of iomart's portfolio in August 2012.
0.11 miles ANS: MaNOC 8
0.42 miles Equinix Manchester MA4
0.52 miles Equinix Manchester MA1
1.01 miles Wavenet: Manchester ServerBank
Wavenet Limited operates the ServerBank Manchester data center (also referred to as Manchester DC 13) at Bank House, Manchester, United Kingdom.
1.07 miles Asanti: Manchester
The Asanti Manchester data centre was acquired from Daisy Group in November 2022. The Manchester data centre offers 15,000 sq ft of secure colocation hosting space.
1.26 miles Nasstar: Salford
1.75 miles AI End User Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.76 miles Level3 Manchester
1.88 miles Equinix Manchester MA3
1.93 miles iomart: DC13 Manchester
iomart acquired the LDeX Group in December 2018, and what was previously known as the LDeX2 Manchester site is now integrated into iomart's network as DC13.
2.01 miles Computacenter: Manchester
2.23 miles Lunar 3
Lunar 3 offers four data halls, three IT zones, a 1,000 kg/m² floor load, 1.2 MVA DX CRAC cooling, and 2 MVA power with N+1 redundancy from two independent sources and one substation.
2.37 miles Datacentreplus: Manchester
2.66 miles AtlasEdge: MAN001
3.10 miles ANS: MaNOC 5, 6 & 7
The ANS MaNOC 5, 6, and 7 complex is a high-density data center campus in Trafford Park, Manchester, comprising three interconnected buildings designed for secure colocation and managed services.
3.18 miles Pulsant: Manchester NW-1
3.27 miles ANS: MaNOC 4
ANS MaNOC 4 is a high-security, carrier-neutral data center featuring approximately 20,000 sq ft of gross space and a capacity for over 300 racks.
3.57 miles Kao Data: Manchester
Kao Data is developing a £350m data center at Kenwood Point, Stockport, UK.
5.18 miles Deep Green: Manchester DG01
Deep Green is to deploy an edge data center at the Move Urmston Leisure Center in southwest Manchester.
5.41 miles Digital L&D: Manchester
Salford City Council has approved a £250m data center at Peel Waters’ Halo West site in Eccles, Salford, northwest of Manchester.
5.90 miles LCRDC: Manchester Core
LCRDC's Manchester data centre facility is located close to Manchester Airport’s City Enterprise Zone and is one of the best connected and well protected data centres in the UK.
5.91 miles TeleData
9.24 miles Innova: Spodegreen DC
Innova announced the campus-style project in September 2026 and held an initial public consultation, which drew more than 100 residents and sparked strong local opposition focused on green-belt and agricultural land impacts.
14.17 miles Intercity: Bolton
The Intercity Technology data center in Bolton is a Tier 3 facility located at Hallmark House, Paragon Business Park.
15.29 miles Level3 Warrington

DRT Manchester Data Center Photos See all

CapitaLand's Reynolds House Site in Manchester, UK
Source: CapitaLand

Operating Company

Operated by:

Digital Realty Trust is a data center public REIT that owns and operates facilities in the United States and Europe. The company provides colocation and interconnection services and develops large multi‑tenant data centers for enterprise and cloud customers.

Its European platform expanded through the combination with Interxion, and through the purchase of European sites divested by Equinix following Equinix’s acquisition of TelecityGroup. The Telx acquisition added a U.S. interconnection and colocation business to Digital Realty’s portfolio.

Digital Realty Trust History:

  • In March 2020 completed the combination with Interxion, expanding its European platform.
  • In September 2017 completed the merger with DuPont Fabros Technology.
  • In July 2016 acquired eight European data centers from Equinix that were divested as part of Equinix’s TelecityGroup acquisition.
  • In October 2015 completed the acquisition of Telx.
  • On October 28, 2004 priced its initial public offering at 12 dollars per share.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Goodman and Digital Realty Launch A$715M Bid for 9.9% NEXTDC Stake
[Goodman Group](https://baxtel.com/data-centers/goodman-group) and [Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) moved to buy up to 9.9% of Australian operator [NEXTDC](htt...

Goodman and Digital Realty Launch A$715M Bid for 9.9% NEXTDC Stake

November 05, 2026 NEXTDC

Goodman Group and Digital Realty moved to buy up to 9.9% of Australian operator NEXTDC at a 45.5% premium to the previous close. The buyers offered A$9.50 a share through an aftermarket bookbuild, a purchase Reuters valued at about A$715 million (US$501 million) after reviewing the term sheet....

Read more
Read Digital Realty Picks Kokomo for 1GW Campus, Its First in Indiana
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) wants to build its first [Indiana](https://baxtel.com/regions/indiana) data centers in Kokomo, proposing a three-building camp...

Digital Realty Picks Kokomo for 1GW Campus, Its First in Indiana

October 17, 2026 Digital Realty Trust

Digital Realty wants to build its first Indiana data centers in Kokomo, proposing a three-building campus with roughly 1GW of IT capacity on 476 acres of greenfield land. The global REIT published a project page for the development after city officials confirmed its interest earlier this month,...

Read more
Read Digital Realty Proposes 1GW Data Center Campus In Kokomo, Indiana

[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) is proposing a three-building data center campus on about 476 acres at Industrial Park North in Kokomo, Indiana, with a site...

Digital Realty Proposes 1GW Data Center Campus In Kokomo, Indiana

October 16, 2026 Digital Realty Trust

Digital Realty is proposing a three-building data center campus on about 476 acres at Industrial Park North in Kokomo, Indiana, with a site plan that calls for roughly 1GW of IT capacity and completion in 2033. The company published the details on its Kokomo project page, and Kokomo Mayor Tyler...

Read more
Read Digital Realty Completes Structural Topping-Out of Second Seoul Data Center
Digital Realty has topped out ICN11, its second data center in Seoul, South Korea. The facility is expected to become operational in the second half of 2027.

“The topping out isn't just a constr...

Digital Realty Completes Structural Topping-Out of Second Seoul Data Center

October 15, 2026 Digital Realty Trust

Digital Realty has topped out ICN11, its second data center in Seoul, South Korea. The facility is expected to become operational in the second half of 2027. “The topping out isn't just a construction milestone; it's a powerful symbol of what happens when incredible teams come together to...

Read more
Read Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the com...

Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus

October 10, 2026 Digital Realty Trust

Digital Realty has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the company announced on Oct. 7. The facility is being developed by MC Digital Realty, the operator's 50/50 joint venture with Mitsubishi Corporation, and is...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.