DRT Manchester

Latest Podcast Reynolds House
Operational
Fully operational facility
Operated by:

DRT Manchester

This site is leased from CapitaLand in the CapitaLand: Reynolds House building
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

Reynold House is a three-storey triple net powered shell data centre located 13 km from Manchester International Airport and 290 km north west of London.

  • CapitaLand Ascendas REIT acquired this data center from Digital Realty in 2021.

Map and Nearby Locations

Reynolds House ( Manchester Technopark )
Digital Realty Trust Sites
Nearby Facilities

Sites within 15 miles of DRT Manchester

Distance Site About
0.01 miles iomart: DC7 Manchester
In 2012, iomart Group plc acquired Melbourne Server Hosting, gaining two Manchester data centers—Turing House (DC6) and Reynolds House (DC7).
0.01 miles Lunar 1
The Lunar 1 data center, located at Reynolds House in the Manchester Technopark, is an enterprise-grade colocation facility managed by Lunar Digital Solutions Ltd.
0.01 miles Equinix Manchester MA2
0.01 miles Lunar 2
Lunar 2 in Manchester offers colocation with two data halls, 1,500 kg/m² floor load, an N+1 DX CRAC and In-Row cooling system, a 1.5 MVA incoming feed capacity and N+1 generator redundancy with 168-hour fuel capacity at full load.
0.01 miles CapitaLand: Reynolds House
0.06 miles iomart: Melbourne Turing House
0.06 miles iomart DC6 Manchester
The iomart DC6 data center in Manchester (also known as Turing House) became part of iomart's portfolio in August 2012.
0.11 miles ANS: MaNOC 8
0.42 miles Equinix Manchester MA4
0.52 miles Equinix Manchester MA1
1.01 miles Wavenet: Manchester ServerBank
Wavenet Limited operates the ServerBank Manchester data center (also referred to as Manchester DC 13) at Bank House, Manchester, United Kingdom.
1.07 miles Asanti: Manchester
The Asanti Manchester data centre was acquired from Daisy Group in November 2022. The Manchester data centre offers 15,000 sq ft of secure colocation hosting space.
1.26 miles Nasstar: Salford
1.75 miles MSP Data CenterInterested in this information?Contact us
Media Stream AI (MSAI) has unveiled a £50m ($67.2m) investment to develop a state-of-the-art AI data centre, robotics lab, and production facility at Anchorage Place in Salford’s Media City.
1.76 miles Level3 Manchester
1.88 miles Equinix Manchester MA3
1.93 miles iomart: DC13 Manchester
iomart acquired the LDeX Group in December 2018, and what was previously known as the LDeX2 Manchester site is now integrated into iomart's network as DC13.
2.01 miles Computacenter: Manchester
2.23 miles Lunar 3
Lunar 3 offers four data halls, three IT zones, a 1,000 kg/m² floor load, 1.2 MVA DX CRAC cooling, and 2 MVA power with N+1 redundancy from two independent sources and one substation.
2.37 miles Datacentreplus: Manchester
2.66 miles AtlasEdge: MAN001
3.10 miles ANS: MaNOC 5, 6 & 7
The ANS MaNOC 5, 6, and 7 complex is a high-density data center campus in Trafford Park, Manchester, comprising three interconnected buildings designed for secure colocation and managed services.
3.18 miles Pulsant: Manchester NW-1
3.27 miles ANS: MaNOC 4
ANS MaNOC 4 is a high-security, carrier-neutral data center featuring approximately 20,000 sq ft of gross space and a capacity for over 300 racks.
3.57 miles Kao Data: Manchester
Kao Data is developing a £350m data center at Kenwood Point, Stockport, UK.
5.18 miles Deep Green: Manchester DG01
Deep Green is to deploy an edge data center at the Move Urmston Leisure Center in southwest Manchester.
5.41 miles Digital L&D: Manchester, UK.
Salford City Council has approved a £250m data center at Peel Waters’ Halo West site in Eccles, Salford, northwest of Manchester.
5.91 miles TeleData
7.63 miles LCRDC: Manchester Core
LCRDC's Manchester data centre facility is located close to Manchester Airport’s City Enterprise Zone and is one of the best connected and well protected data centres in the UK.
14.17 miles Intercity: Bolton
The Intercity Technology data center in Bolton is a Tier 3 facility located at Hallmark House, Paragon Business Park.
15.29 miles Level3 Warrington

DRT Manchester Data Center Photos See all

CapitaLand's Reynolds House Site in Manchester, UK
Source: CapitaLand

Operating Company

Operated by:

Digital Realty Trust is a data center public REIT that owns and operates facilities in the United States and Europe. The company provides colocation and interconnection services and develops large multi‑tenant data centers for enterprise and cloud customers.

Its European platform expanded through the combination with Interxion, and through the purchase of European sites divested by Equinix following Equinix’s acquisition of TelecityGroup. The Telx acquisition added a U.S. interconnection and colocation business to Digital Realty’s portfolio.

Digital Realty Trust History:

  • In March 2020 completed the combination with Interxion, expanding its European platform.
  • In September 2017 completed the merger with DuPont Fabros Technology.
  • In July 2016 acquired eight European data centers from Equinix that were divested as part of Equinix’s TelecityGroup acquisition.
  • In October 2015 completed the acquisition of Telx.
  • On October 28, 2004 priced its initial public offering at 12 dollars per share.
294
Facilities
55
Markets
3226MW
Megawatts

News See all

Read Digital Realty Buys Blackstone Stake in Three Virginia Data Centers for $3.5 Billion
Digital Realty is acquiring a stake in three Northern Virginia data centers from Blackstone. The deal covers 288MW of fully leased capacity across two sites in Manassas and one at the Digital Dulle...

Digital Realty Buys Blackstone Stake in Three Virginia Data Centers for $3.5 Billion

July 01, 2026 Digital Realty Trust

Digital Realty is acquiring a stake in three Northern Virginia data centers from Blackstone. The deal covers 288MW of fully leased capacity across two sites in Manassas and one at the Digital Dulles campus in Sterling, all 100% leased to hyperscale customers. Blackstone is selling a 64% interest...

Read more
Read Digital Realty Plans New Data Center in Seattle, Washington
Digital Realty is planning a new data center in Seattle, Washington, as the city considers a moratorium on new developments. According to BizJournal and other reports, the company has filed plans w...

Digital Realty Plans New Data Center in Seattle, Washington

June 05, 2026 Digital Realty Trust

Digital Realty is planning a new data center in Seattle, Washington, as the city considers a moratorium on new developments. According to BizJournal and other reports, the company has filed plans with the Seattle City Council to replace the existing retail building and parking garage at 301...

Read more
Read Digital Realty Plans New Data Center in Milan
Digital Realty Plans New Data Center in Milan

Digital Realty Plans New Data Center in Milan

March 24, 2026 Digital Realty Trust

Digital Realty is expanding in Italy with plans to develop a data center campus in Milan.The colocation giant this week announced its entry into the Milan market with the acquisition of two plots in Abbiategrasso, southwest of the city center. The company plans to develop an initial 8MW facility,...

Read more
Read Digital Realty Approved for Sixth Data Center in Marseille, France
Digital Realty Approved for Sixth Data Center in Marseille, France

Digital Realty Approved for Sixth Data Center in Marseille, France

March 11, 2026 Digital Realty Trust

Digital Realty Approved for Sixth Data Center in Marseille, FranceWith server racks at the data center set to require 120kW each, presumably to host AI workloads, Digital Realty plans to install a new high-voltage power supply. This will run from power company RTE’s Realtor substation in Cabriès,...

Read more
Read Digital Realty has Entered the Portuguese Market with the Acquisition of a Data Center in Lisbon
Digital Realty has Entered the Portuguese Market with the Acquisition of a Data Center in Lisbon

Digital Realty has Entered the Portuguese Market with the Acquisition of a Data Center in Lisbon

March 04, 2026 Digital Realty Trust

Digital Realty has entered Portugal, acquiring a data center in Lisbon. Details on the facility, the seller, and terms of the deal weren’t shared in the release. However, in its recent Q4 2025 results, the company said it had acquired “a building and land” in the Carnaxide area of Lisbon for $8.3...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?