Year Built: 2023
PUE: 1.5
Utility Provider: PLN (National Provider)
Floors: 11
░░░░ Request Dataset MW
Operational Power
░░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

DCI E1 Data center was formally opened in March 2024. The 11-story facility offers 30,000 sqm (322,920 sq ft) of space and can accommodate up to 4,000 racks. Construction at the site was completed in 2023, with a topping-out ceremony in May.

Map and Nearby Locations

Menara Palma ( Lantai 9, Unit 9-02B/03 Jl. HR Rasuna Said Blok X 2, No.Kav. 6, RT.9/RW.4, Kuningan Tim., Jakarta Selatan, Jakarta )
DCI Indonesia Sites
Nearby Facilities

DCI Indonesia E1 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of DCI Indonesia E1

Distance Site
0.52 miles NEX: Cyber 2 Tower
0.54 miles PSN Networks
0.73 miles Bitera Data Center: Jakarta, Indonesia
0.77 miles LG Sinar Mas: Jakarta SMX01
0.97 miles Digital Edge: EDGE2
1.02 miles Equinix Jakarta JK1
1.03 miles Herza DC - Tifa
1.05 miles IDC Indonesia Gedung Cyber Building
1.06 miles NTT: Jakarta 2
1.07 miles Indonesia Super Corridor: Cyber 1
1.07 miles CDC Cyber Data Center International Jakarta
1.07 miles Digital Edge: EDGE1
1.08 miles Omni DC: JKT1
1.10 miles NEX: Menara Tendean
1.16 miles NTT: Jakarta 2 Annex
1.40 miles Biznet Jakarta MidPlaza
1.57 miles SCBD Data Center: Jakarta
1.57 miles MettaDC: ID02
1.84 miles IDC Indonesia 3D Duren Tiga Jakarta
1.86 miles Indonesia Super Corridor: ISC Tower
2.04 miles Edgnex: Jakarta (MT Haryono)
2.09 miles neuCentrIX Karet Tengsin
2.10 miles Nusantara NDC Jakarta
2.55 miles Digital Realty Bersama: CGK11
3.21 miles Bank Indonesia Data Center 1
3.22 miles DCI Indonesia: E5
3.36 miles BDx Jakarta City Center CGK1
3.53 miles DCI Indonesia: E3
3.60 miles Princeton PDG: Jakarta
5.41 miles neuCentrIX Meruya
5.55 miles BDx: CGK3A
5.57 miles BDx: CGK3
6.04 miles Aslan Energy: East Jakarta
8.68 miles Princeton JB1
10.12 miles Pure DC Jakarta
10.95 miles Digital Realty Bersama: CGK10
11.03 miles SpaceDC JAK1
11.65 miles Primacom: Banten
11.89 miles Lintasarta Techno Park DC
12.41 miles NeutraDC: Serpong
13.22 miles Seax: Global Data Centre
13.28 miles BDx: CGK2
15.04 miles Biznet Technovillage
15.27 miles Area31: Depok
17.36 miles Carrier-Neutral Data CenterInterested in this information?Contact us
18.55 miles Princeton PDG JC2
18.58 miles Princeton PDG JC1
18.75 miles NTT Jakarta 3 (JK3)
18.82 miles DCI Indonesia: H1-JK7
18.86 miles DCI Indonesia: H1-JK8
18.87 miles DCI Indonesia: H1-JK1
18.89 miles DCI Indonesia: H1-JK2
18.91 miles DCI Indonesia: H1-JK6
18.93 miles DCI Indonesia: H1-JK3
18.95 miles DCI Indonesia: H1-JK5

Operating Company

Operated by:

DCI Indonesia

0
Facilities
0
Markets

News See all

Read NTT Opens 12MW Jakarta 2 Annex Data Center in Indonesia
[NTT DATA](https://www.nttdata.com/en-us/news/2026/ntt-data-opens-jakarta-data-center) opened its new Jakarta data center on Nov. 3, adding 12MW of IT capacity at its existing campus in South Jakar...

NTT Opens 12MW Jakarta 2 Annex Data Center in Indonesia

November 03, 2026 NTT

NTT DATA opened its new Jakarta data center on Nov. 3, adding 12MW of IT capacity at its existing campus in South Jakarta. The facility, the Jakarta 2 Annex Data Center, is known as JKT2A and sits inside NTT DATA's Jakarta campus. JKT2A extends the JKT2 campus, which hosts more than 240...

Read more
Read PDG Buys Jakarta Land for 240MW Data Center Development
PDG Buys Jakarta Land for 240MW Data Center Development

PDG Buys Jakarta Land for 240MW Data Center Development

April 30, 2026 Jakarta

APAC data center firm Princeton Digital Group (PDG) has acquired land in Jakarta, Indonesia, for a new development. The company this week announced the acquisition of a site in Greater Jakarta for its newest campus, JC4 Located within the Greenland International Industrial Center (GIIC) in Bekasi...

Read more
Read Mitratel acquires over 800 towers from Gametraco for $113 million
Mitratel acquires over 800 towers from Gametraco for $113 million

Mitratel acquires over 800 towers from Gametraco for $113 million

December 03, 2023 Jakarta

Jakarta-based PT Dayamitra Telekomunikasi Tbk (Mitratel) revealed last week that it recently acquired 803 towers from infrastructure operator PT Gametraco Tunggal for around $113 million. The Telkom Indonesia subsidiary noted that this acquisition includes 1.327 tenants, confirming that 562 of...

Read more
Read DCI Indonesia announces launch of its second building at its H2 Data Center Campus outside Jakarta
DCI Indonesia announces launch of its second building at its H2 Data Center Campus outside Jakarta

DCI Indonesia announces launch of its second building at its H2 Data Center Campus outside Jakarta

June 27, 2023 DCI Indonesia

DCI Indonesia has launched the second building at its H2 Data Center Campus outside Jakarta. The first phase at the site, H2-01, launched back in November 2021, offering 15 MW; meanwhile, H2-02, its second building, adds 12MW. The two buildings at the 791 hectare-campus now offer 27MW in total....

Read more
Read DCI Indonesia inaugurates a second structure on its 600MW facility outside Jakarta
DCI Indonesia inaugurates a second structure on its 600MW facility outside Jakarta

DCI Indonesia inaugurates a second structure on its 600MW facility outside Jakarta

June 26, 2023 DCI Indonesia

DCI Indonesia has inaugurated a second structure on its campus outside of Jakarta. With the incorporation of the 12MW H2-02, the H2 campus now offers 27MW between two buildings. The H2 campus, located east of the capital city on 791 hectares in Karawang, has a total capacity of up to 600 MW. The...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.