Located approximately 35 KM south of Jakarta Central Business District, the facility is specifically designed for Disaster Recovery Center (DRC) and primary data center clients
Data Center One Building
Pod 1: 1,000 m2, Closed Rack Space 256 racks
Pod 2: 1,000 m2, Closed Rack Space 350 racks
Pod 3: 1,000 m2, Closed Rack Space 350 racks
Pod 4: 1,000 m2, Custom Rack Space
Data Center Two Building
Pod 3: 1,000 m2, Suite Space 15 suites
Pod 4: 1,000 m2, Custom Rack Space
Office Building:
Gross Area 5,000 m2 (55,000 ft2)
Steel concrete structure with concrete floors, metal faced cladding and glazing
Typical floor loading of 300 kg/m2
Slab to slab height 4.0 meter
Column spacing based on 8 meter grid
2 (two) units Mitsubishi Passenger Elevator 1 ton
Power:
- Redundant 4 x 2.5 MVA power transformer fromthe Kramat Jati and Gandaria Power Grid (PLN),owned by Indonesian Goverment
- For Critical Power Full Backup: 2 (two) units Dynamic Rotary Uninterruptible Power Supply (DRUPS) 1.7 MVA capacity from Euro Diesel, Belgium with N+1 configuration to supply Data Center rooms and Office Building Critical Load (www.euro-diesel.com), Generator Set is provided by Mitsubishi Heavy Industries. System upgradable tp 6 (six) units DRUPS 2N (+1) DRUPS provides greener power solution without using any lead (Pb) based battery.