CDE Acquisitions: Project Atlas

Latest Podcast
2493 N Cedar Crest Blvd
Planned
Future facility in planning stage

CDE Acquisitions: Project Atlas

Site planned for 2028 and has expansions through 2032
Lot Size: 410 acres

Project Atlas is being proposed by applicant CDE Acquisitions, LLC, which is pursuing the data center campus as the prospective purchaser of the 410-acre property currently owned by Jeras Corporation.

The revised plans for Project Atlas downsize the data center campus proposal from its original 5.1-million-square-foot layout featuring six data center buildings and 356 backup generators to a scaled-back 1.55-million-square-foot development. The current proposal replaces the old configuration with three large data center buildings, an administration facility, and a central warehouse while retaining infrastructure safeguards like noise-attenuation walls around the backup generators and a 12-foot-tall landscaped berm to screen the on-site electrical substation.

Map and Nearby Locations:

2493 N Cedar Crest Blvd
CDE Acquisitions, LLC Sites
Nearby Facilities

Sites within 15 miles of CDE Acquisitions: Project Atlas

Distance Site About
4.18 miles Flexential Allentown
4.39 miles DataBridge: Allentown PA
AGILE Allentown has a double-ended 110kV substation on premises, fed by PPL. In twelve years of operation, this campus has never lost power. The 110kV substation feeds a double-ended 12.5kV switchgear which in turn feeds the 480V output substation for the data center.
4.98 miles Prologis: Northampton, PA
Prologis has secured unanimous conditional use approval from the Allen Township Board of Supervisors to convert its 1.01 million-square-foot warehouse into a data center.
6.66 miles Cetronia 3
This facility is part of Cetronia Road Data Center Campus in Allentown, Pennsylvania.
6.82 miles Cetronia 2
This facility is part of Cetronia Road Data Center Campus in Allentown, Pennsylvania.
7.11 miles Cetronia Road Data Center
Industrial gas and chemical company, Air Products, is moving to redevelop its former 194-acre headquarters in Lehigh County into a massive 2.6 million-square-foot data center campus.
8.58 miles TierPoint Lehigh Valley
TierPoint’s Lehigh Valley facility in Bethlehem, is located along the Lehigh Valley Thruway. In addition to the data center, the facility has office space and/or disaster recovery suites.
8.58 miles Colocation America - Philadelphia DC3
8.68 miles TierPoint Bethlehem
Previously was operated by Windstream until October 2015.
9.23 miles TierPoint: TekPark Expansion
US data center operator TierPoint has secured $240 million in new asset-backed securities (ABS) funding and acquired its largest leased site in Pennsylvania, known as TekPark.
9.28 miles Colocation America - Philadelphia DC1
9.28 miles TierPoint Allentown (TekPark)
Former XAND data center before being acquired by TierPoint in 2014. A $12 million expansion in November 2016 added additional 14,000 square feet

CDE Acquisitions: Project Atlas Data Center Photos (See all)

Operating Company

CDE Acquisitions, LLC is an Atlanta-based development firm known for proposing massive infrastructure projects.

1
Facilities
0
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?