American Tower: Indianapolis, IN

Latest Podcast 7701 Walnut Dr
Planned
Future facility in planning stage
Operated by:

American Tower: Indianapolis, IN

Year Planned: 2027
Floors: 1
Lot Size: 7 acres

American Tower affiliate ATC Watertown LLC plans to develop a 20,000-square-foot edge data center at 7701 Walnut Drive in North Indianapolis. The proposed facility will occupy seven acres of a larger 53-acre site that already hosts a 1,000-foot broadcast tower.

Designed for efficiency, the single-story building will utilize a closed-loop cooling system and requires no additional electrical infrastructure upgrades. The site is already home to a 1,000-foot broadcast tower and a two-story, 4,400-square-foot support building, both of which would remain in place.

Map and Nearby Locations

7701 Walnut Dr
American Tower Corporation Sites
Nearby Facilities

American Tower: Indianapolis, IN Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of American Tower: Indianapolis, IN

Distance Site About
2.08 miles Lumen Indianapolis 3
2.32 miles US Signal: IN02 Indianapolis
5.74 miles Expedient Indianapolis
Redundant electric utility power feeds, 4 auto-cutover diesel generators, multiple cooling systems, a 24-inch raised floor, and advanced fire suppression
7.97 miles AT&T CO 5009 E 38th
AT&T central office. Not clear if the company offers colocation at this location
8.41 miles Metrobloks: Indianapolis IND-A1
Metrobloks is developing an AI-ready, scalable, and sustainable data center in East Indianapolis, with live capacity scheduled for Q1 2027.
8.41 miles Metrobloks: Indianapolis A1
The IND-A1 data center is a $500 million development project located in Indianapolis’ Martindale-Brightwood neighborhood.
9.46 miles US Signal Indianapolis IN01
Located in the heart of Indianapolis, Indiana, this location has recently been expanded to allow more customers to house their infrastructure and transmit their data entirely on the US Signal network
9.46 miles Netrality Indy Telecom Center
The Indy Telecom Center is a 11 building 9-acre campus comprising ~205k sqft. The campus is considered Indianapolis's Carrier Hotel.
9.48 miles Netrality 701 W Henry
Netrality Data Centers has opened a new data hall in Indianapolis, Indiana, offering 1MW of capacity across 3,800 sq ft (353 sqm).
9.49 miles Databank Indianapolis IND2
9.50 miles Databank Indianapolis IND1
The site was formerly known owned by Lightbound before being acquired in October 2019.
9.54 miles Raeden: Indianapolis, IN
The facility is strategically positioned at the largest nexus of fiber and interconnection within the Indianapolis Tech Center on Henry Street.
9.59 miles Online Tech
10.96 miles Lumen Indianapolis 1
11.92 miles Lifeline Eastgate
11.93 miles DC Blox: Thunderbird Indianapolis DC3
DC Blox is developing a three-building data center campus at 305 Fintail Drive within the Thunderbird Commerce Center in east Indianapolis, Indiana.
11.99 miles DC Blox: Thunderbird Indianapolis DC2
DC Blox is developing a three-building data center campus at 305 Fintail Drive within the Thunderbird Commerce Center in east Indianapolis, Indiana.
12.02 miles DC Blox: Thunderbird Indianapolis Campus
DC Blox is developing a three-building data center campus at 305 Fintail Drive within the Thunderbird Commerce Center in east Indianapolis, Indiana.
12.67 miles Vantage: Pittsboro Campus
In Pittsboro, Indiana, Vantage Data Centers has received initial approval to rezone 618 acres of land for a data center development.
12.79 miles Vantage: Pittsboro 3
The two-story data center building will be a part of Vantage's Pittsboro Campus in Indiana.
13.02 miles Vantage: Pittsboro 2
The single-story data center building will be a part of Vantage's Pittsboro Campus in Indiana.
13.29 miles RadiusDC: Plainfield 2
This facility is part of RadiusDC's Plainfield Campus in Indianapolis.
13.41 miles RadiusDC: Plainfield Campus
RadiusDC intends to develop two 100,835-square-foot facilities on a 31-acre site in the Indianapolis metro area.
16.34 miles Hyperscale Data Center Request Dataset
Google has withdrawn its proposal to build a 468-acre data center in Franklin Township, Indiana.
16.52 miles Sabey: Decatur Tech Park
The Sabey Data Centers project in Decatur Township, known as the Decatur Technology Park, represents a $4 billion investment designed to support high-density computing and artificial intelligence workloads.
16.75 miles Sabey: Decatur Bldg-B
This facility is part of Sabey Data Centers project in Decatur Township, known as the Decatur Technology Park.
17.75 miles Surge: Hancock County MegaSite
Due to local opposition, Surge Development has withdrawn its proposal to rezone land in Indiana for a new data center.

American Tower: Indianapolis, IN Data Center Photos See all

Operating Company

Operated by:

American Tower Corporation (also referred to as American Tower or ATC) is an American publicly held company, owner and operator of wireless and broadcast communications infrastructure in several countries. American Tower is headquartered in Boston, Massachusetts and has local offices worldwide. The company was formed in 1995 as a unit of American Radio Systems, and was spun off from that company in 1998 when that company merged with CBS Corporation. Following the merger, American Tower began international expansion by establishing operations in Mexico in 1998 and Brazil in 1999. The company is structured as a real estate investment trust (REIT.) Source: Wikipedia

9
Facilities
7
Markets
8MW
Megawatts

News See all

Read $500m Data Center Approved For Construction Outside Indianapolis
$500m Data Center Approved For Construction Outside Indianapolis

$500m Data Center Approved For Construction Outside Indianapolis

April 02, 2026 Indianapolis

A $500 million data center has been approved in Martindale Brightwood, northeast of Indianapolis, Indiana. The Indianapolis Metropolitan Development Commission approved Metrobloks’ request to rezone a 14-acre site at 2505 North Sherman Drive for the project.The site, vacant since 1983 and...

Read more
Read American Tower Pauses Plans for Edge Data Center in Indianapolis, Indiana
American Tower Pauses Plans for Edge Data Center in Indianapolis, Indiana

American Tower Pauses Plans for Edge Data Center in Indianapolis, Indiana

February 06, 2026 American Tower Corporation

US tower and data center firm American Tower has dropped plans to develop an Edge facility at a telecoms site in Indianapolis, Indiana.The single-story building would have totaled 4MW on seven acres of the 53-acre property. The company was planning to use a closed-loop cooling system and not...

Read more
Read American Tower Opens Edge Data Center in Raleigh, North Carolina
American Tower Opens Edge Data Center in Raleigh, North Carolina

American Tower Opens Edge Data Center in Raleigh, North Carolina

May 23, 2025 American Tower Corporation

American Tower Corporation has opened its Edge data center in Raleigh, North Carolina, marking the occasion with a ribbon-cutting ceremony at the site, the company's first data center in North Carolina’s Research Triangle region.The company notes that its Edge data centers are able to address the...

Read more
Read ATC Kenya demands $3.2 million down payement from Telkom to turn tower sites back on
ATC Kenya demands $3.2 million down payement from Telkom to turn tower sites back on

ATC Kenya demands $3.2 million down payement from Telkom to turn tower sites back on

December 06, 2023 American Tower Corporation

American Tower Corporation Kenya (ATC Kenya) has demanded a down payment of KES500 million ($3.26m) and KES150m ($978k) per month from Telkom Kenya to turn back on mast sites it switched off earlier this year. Reports note that ATC had turned off 246 mast sites seven months ago and is yet to...

Read more
Read American Tower enters partnership with MTN Nigeria
American Tower enters partnership with MTN Nigeria

American Tower enters partnership with MTN Nigeria

November 15, 2023 American Tower Corporation

American Tower's African subsidiary, ATC Africa, recently signed a communication agreement with MTN Nigeria focused on 'driving sustainable networks.' Following this agreement, ATC Africa will facilitate new tenancies for MTN Nigeria over a multi-year period, starting in the second half of next...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?