Aligned: Shippingport Industrial Park

Latest Podcast
Church Ln
Land BankPlanned
Future facility in planning with land secured
Operated by:

Aligned: Shippingport Industrial Park

Short Code: Project Phoenix
Year Planned: 2028
Lot Size: 660 acres

Aligned Data Centers’ Project Phoenix is a massive $10 billion redevelopment of the former Bruce Mansfield coal plant in Shippingport, Pennsylvania. In partnership with the Frontier Group of Companies, the project is transforming the 660-acre site into a premier hub for hyperscale AI and high-performance computing.

The campus is designed to include three massive data center buildings, with each facility spanning over 600,000 square feet. By co-locating these expansive facilities with a newly converted 3.6 GW natural gas-fired power station, the project creates a "vertically integrated" ecosystem that provides high-density, "behind-the-meter" power directly to the site. This strategic reuse of legacy industrial infrastructure not only revitalizes the region with thousands of jobs but also establishes a new standard for gigascale, AI-ready digital infrastructure in the United States.

Site History


The Shippingport Industrial Park occupies the former site of the Bruce Mansfield Power Plant, a 2.49 GW coal facility that operated from 1976 until its decommissioning in 2019. After acquiring the property from Energy Harbor Corp in 2022, the Frontier Group of Companies announced a $3.2 billion 'coal-to-gas' redevelopment.

Map and Nearby Locations:

Church Ln
Aligned Sites
Nearby Facilities

Aligned: Shippingport Industrial Park Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Aligned: Shippingport Industrial Park

Distance Site About
0.96 miles Standard Power: Beaver Valley
Standard Power, a blockchain company, has partnered with Vistra Corp. to construct a large-scale, carbon-free data center adjacent to the Beaver Valley nuclear power plant in Shippingport, Pennsylvania.
1.87 miles Big Digital Energy: Midland, PA
Mawson Infrastructure Group Inc has deployed its Modular Data Centre (MDC) bitcoin mining solution to the Midland site. The Midland site now has a total capacity of 120 MW.
1.87 miles Big Digital Energy: Bellefonte, PA
The Bellefonte, Pennsylvania facility operated by Big Digital Energy (formerly Mawson Infrastructure Group) is a modular data center site primarily used for digital asset mining and emerging GPU/HPC workloads.
15.30 miles Provident: Pittsburgh, Pennsylvania
The proposed redevelopment of the former Pitt International Race Complex in Wampum, Pennsylvania, represents a massive 400-acre land banking play by Texas-based developer Provident Data Centers.
15.30 miles Switch: Big Beaver
Switch is planning a new data center campus on the former Pittsburgh International Race Complex property in Big Beaver Borough, northwest of Pittsburgh, expanding its U.S. campus footprint into Pennsylvania.
17.33 miles DataBank Pittsburgh PIT2
Databank acquired the facility in 2019 from PNC Bank in a sale-leaseback transaction. BNC Bank occupies the entire second floor.
19.72 miles Ardent (Northern Data): Pittsburgh, Pennsylvania
Ardent Data Centers, a Northern Data Group company, has finalized the acquisition of a new data center site in Pittsburgh, Pennsylvania. The 41,000 sq ft (3,900 sqm) expanded the site to 20MW.

Aligned: Shippingport Industrial Park Data Center Photos (See all)

Operating Company

Operated by:

Aligned Data Centers is an infrastructure technology company that offers colocation and build-to-scale solutions to cloud, enterprise, and managed service providers.

In early 2022, Aligned Energy was rebranded to Aligned Data Centers.

44
Facilities
3
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your