Aligned: Shippingport Industrial Park

Land BankPlanned
Future facility in planning with land secured
Operated by:

Aligned: Shippingport Industrial Park

Short Code: Project Phoenix
Year Planned: 2028
Lot Size: 660 acres

Aligned Data Centers’ Project Phoenix is a massive $10 billion redevelopment of the former Bruce Mansfield coal plant in Shippingport, Pennsylvania. In partnership with the Frontier Group of Companies, the project is transforming the 660-acre site into a premier hub for hyperscale AI and high-performance computing.

The campus is designed to include three massive data center buildings, with each facility spanning over 600,000 square feet. By co-locating these expansive facilities with a newly converted 3.6 GW natural gas-fired power station, the project creates a "vertically integrated" ecosystem that provides high-density, "behind-the-meter" power directly to the site. This strategic reuse of legacy industrial infrastructure not only revitalizes the region with thousands of jobs but also establishes a new standard for gigascale, AI-ready digital infrastructure in the United States.

Site History


The Shippingport Industrial Park occupies the former site of the Bruce Mansfield Power Plant, a 2.49 GW coal facility that operated from 1976 until its decommissioning in 2019. After acquiring the property from Energy Harbor Corp in 2022, the Frontier Group of Companies announced a $3.2 billion 'coal-to-gas' redevelopment.

Map and Nearby Locations

Church Ln
Aligned Sites
Nearby Facilities

Aligned: Shippingport Industrial Park Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Aligned: Shippingport Industrial Park

Distance Site About
0.96 miles Standard Power: Beaver Valley
Standard Power, a blockchain company, has partnered with Vistra Corp. to construct a large-scale, carbon-free data center adjacent to the Beaver Valley nuclear power plant in Shippingport, Pennsylvania.
1.87 miles Big Digital Energy: Midland, PA
Mawson Infrastructure Group Inc has deployed its Modular Data Centre (MDC) bitcoin mining solution to the Midland site. The Midland site now has a total capacity of 120 MW.
1.87 miles Big Digital Energy: Bellefonte, PA
The Bellefonte, Pennsylvania facility operated by Big Digital Energy (formerly Mawson Infrastructure Group) is a modular data center site primarily used for digital asset mining and emerging GPU/HPC workloads.
15.30 miles Provident: Pittsburgh, Pennsylvania
The proposed redevelopment of the former Pitt International Race Complex in Wampum, Pennsylvania, represents a massive 400-acre land banking play by Texas-based developer Provident Data Centers.
15.30 miles Switch: Big Beaver
Switch is planning a new data center campus on the former Pittsburgh International Race Complex property in Big Beaver Borough, northwest of Pittsburgh, expanding its U.S. campus footprint into Pennsylvania.
17.33 miles DataBank Pittsburgh PIT2
Databank acquired the facility in 2019 from PNC Bank in a sale-leaseback transaction. BNC Bank occupies the entire second floor.
19.72 miles Ardent (Northern Data): Pittsburgh, Pennsylvania
Ardent Data Centers, a Northern Data Group company, has finalized the acquisition of a new data center site in Pittsburgh, Pennsylvania. The 41,000 sq ft (3,900 sqm) expanded the site to 20MW.

Aligned: Shippingport Industrial Park Data Center Photos See all

Operating Company

Operated by:

Aligned Data Centers is an infrastructure technology company that offers colocation and build-to-scale solutions to cloud, enterprise, and managed service providers.

In early 2022, Aligned Energy was rebranded to Aligned Data Centers.

44
Facilities
13
Markets

News See all

Read Aligned Data Centers Sold in $40bn Deal
Aligned Data Centers Sold in $40bn Deal

Aligned Data Centers Sold in $40bn Deal

October 11, 2025 Aligned

Aligned Data Centers is being sold to BlackRock and MGX in a deal worth $40 billion, the biggest ever acquisition in the digital infrastructure space. Macquarie Asset Management selling it to a group comprising the AI Infrastructure Partnership (AIP), MGX, and BlackRock-owned Global...

Read more
Read Aligned to Develop 200-Acre Data Center Campus
 Aligned to Develop 200-Acre Data Center Campus

Aligned to Develop 200-Acre Data Center Campus

July 25, 2025 Aligned

Aligned Data Centers this week announced plans to expand in Central Ohio with the development of a data center campus inside the Conesville Industrial Park in Coshocton. Coshocton is located approximately 63 miles (101 km) northeast of Columbus.Aligned will develop a 197-acre parcel adjacent to...

Read more
Read Aligned to proceed with stalled data center camps at Maryland
Aligned to proceed with stalled data center camps at Maryland

Aligned to proceed with stalled data center camps at Maryland

May 24, 2024 Aligned

Aligned Data Centers has revealed its plans to proceed with its previously halted data center campus in Maryland after recent regulatory changes. around backup generators, easing restrictions for data center firms. With this move, Aligned will now be moving ahead with its plans for a campus in...

Read more
Read Aligned Data Centres unveils new liquid cooling system
Aligned Data Centres unveils new liquid cooling system

Aligned Data Centres unveils new liquid cooling system

January 16, 2024 Aligned

Data center firm Aligned recently unveiled a new liquid cooling system designed to support high-density compute requirements and supercomputers and can cool densities up to 300kW per rack. This cooling system, called DataFlow is said to be a turnkey solution which supports current and future...

Read more
Read Alligned Reveals New Brownfield Land Acquisition for DC Campus in Ohio
Alligned Reveals New Brownfield Land Acquisition for DC Campus in Ohio

Alligned Reveals New Brownfield Land Acquisition for DC Campus in Ohio

September 28, 2023 Aligned

On September 25, 2023, Aligned Data Centers announced the acquisition of a new brownfield land in Perkins Township., Northeast Ohio. The firm purchased the 129-acre parcel to construct a new four-building hyperscale data center campus. Aligned said its NEO-01 data center, the first of the four...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?