Aligned Data Centers’ Project Phoenix is a massive $10 billion redevelopment of the former Bruce Mansfield coal plant in Shippingport, Pennsylvania. In partnership with the Frontier Group of Companies, the project is transforming the 660-acre site into a premier hub for hyperscale AI and high-performance computing.
The campus is designed to include three massive data center buildings, with each facility spanning over 600,000 square feet. By co-locating these expansive facilities with a newly converted 3.6 GW natural gas-fired power station, the project creates a "vertically integrated" ecosystem that provides high-density, "behind-the-meter" power directly to the site. This strategic reuse of legacy industrial infrastructure not only revitalizes the region with thousands of jobs but also establishes a new standard for gigascale, AI-ready digital infrastructure in the United States.
The Shippingport Industrial Park occupies the former site of the Bruce Mansfield Power Plant, a 2.49 GW coal facility that operated from 1976 until its decommissioning in 2019. After acquiring the property from Energy Harbor Corp in 2022, the Frontier Group of Companies announced a $3.2 billion 'coal-to-gas' redevelopment.
| Distance | Site | About |
|---|---|---|
| 0.96 miles | Standard Power: Beaver Valley |
Standard Power, a blockchain company, has partnered with Vistra Corp. to construct a large-scale, carbon-free data center adjacent to the Beaver Valley nuclear power plant in Shippingport, Pennsylvania.
|
| 1.87 miles | Big Digital Energy: Midland, PA |
Mawson Infrastructure Group Inc has deployed its Modular Data Centre (MDC) bitcoin mining solution to the Midland site. The Midland site now has a total capacity of 120 MW.
|
| 1.87 miles | Big Digital Energy: Bellefonte, PA |
The Bellefonte, Pennsylvania facility operated by Big Digital Energy (formerly Mawson Infrastructure Group) is a modular data center site primarily used for digital asset mining and emerging GPU/HPC workloads.
|
| 15.30 miles | Provident: Pittsburgh, Pennsylvania |
The proposed redevelopment of the former Pitt International Race Complex in Wampum, Pennsylvania, represents a massive 400-acre land banking play by Texas-based developer Provident Data Centers.
|
| 17.33 miles | DataBank Pittsburgh PIT2 |
Databank acquired the facility in 2019 from PNC Bank in a sale-leaseback transaction. BNC Bank occupies the entire second floor.
|
| 19.72 miles | Ardent (Northern Data): Pittsburgh, Pennsylvania |
Ardent Data Centers, a Northern Data Group company, has finalized the acquisition of a new data center site in Pittsburgh, Pennsylvania. The 41,000 sq ft (3,900 sqm) expanded the site to 20MW.
|
October 11, 2025
Aligned
July 25, 2025
Aligned
May 24, 2024
Aligned
January 16, 2024
Aligned
September 28, 2023
Aligned
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas