iomart: DC12 North London
iomart acquired the LDeX Group in December 2018, and what was previously known as the LDeX1 site is now integrated into iomart's network as DC12 North London.
iomart acquired the LDeX Group in December 2018, and what was previously known as the LDeX1 site is now integrated into iomart's network as DC12 North London.
The iomart DC6 data center in Manchester (also known as Turing House) became part of iomart's portfolio in August 2012.
In 2012, iomart Group plc acquired Melbourne Server Hosting, gaining two Manchester data centers—Turing House (DC6) and Reynolds House (DC7).
iomart acquired the LDeX Group in December 2018, and what was previously known as the LDeX2 Manchester site is now integrated into iomart's network as DC13.
The facility was originally built and opened by the hosting provider RapidSwitch. iomart then acquired RapidSwitch in May 2009 for approximately £5.25 million.
The iomart DC11 York data center became part of the iomart network in September 2018 through the acquisition of the York-based hosting provider Bytemark.
iomart DC8 St Asaph (located in North Wales) became part of the iomart network in December 2012.
iomart DC9 (and the adjacent DC10) in Gosport became part of the iomart network in September 2013, following iomart's acquisition of the hosting provider Redstation.
The Leicester site has 620 m² (6,696 ft²) space across two data halls.
October 30, 2026 Glasgow
Allied Vehicles is exploring a data center on 11 acres of north Glasgow land, The Glasgow Bell reports. The Glasgow-based automotive company and Glasgow City Council are in talks over the brownfield site along Carlisle Street, opposite Cowlairs Park, in the Cowlairs area. Documents sent to the...
Read more
October 26, 2026 England
SWI Compute launched on Oct. 26 to build and operate NVIDIA AI factories, starting with a 30MW site in the UK. The company is part of SWI Group, the Euronext Amsterdam-listed investment group that has secured 3.6GW of power capacity across Europe and the US. SWI Group supplies the land, grid...
Read more
October 22, 2026 Wales
Era4 has released details of The Mill, an AI campus on a former steelworks in Newport, South Wales, designed to reach 1GW of power at full build-out. The campus has room for the equivalent of up to 400,000 Nvidia VR200 GPUs, and the first phase is due online in 2027. Data Center Dynamics reported...
Read more
October 20, 2026 England
Evolution Power Limited has opened a community consultation on Longmarsh Green Energy, a proposal pairing a data center campus that would draw up to 1GW with a 1.3GW solar farm and battery storage across about 4,695 acres of farmland near King's Lynn in west Norfolk. The developer says the...
Read more
June 17, 2026 London
London Mayor Sadiq Khan has pledged "coordinated action" to address the challenges posed by rising data center demand across the capital, particularly growing pressure on power infrastructure. A report commissioned by the Greater London Authority and prepared by Buro Happold found that...
Read more
April 28, 2026 Wales
A proposal to convert a former chemical plant into an AI data center in North Wales, UK, has been rejected by the local council. Anglesey County Council turned down the planning application for the site of the former Octel factory at Amlwch Port, according to the North Wales Chronicle. Carbon3.ai...
Read moreTell us what you're looking for. We respond within one business day.