iomart: DC11 York

Latest Podcast 2 Opus Ave
Operational
Fully operational facility
Operated by:

iomart: DC11 York

Year Built: 2013
░░░ Request Dataset MW
Total Power
░░░░░ Login to view SqFt
Gross Colocation Size

The iomart DC11 York data center became part of the iomart network in September 2018 through the acquisition of the York-based hosting provider Bytemark. In 2013, Bytemark officially opened the facility, which they branded as YO26.

  • 1 x 1MVA 11000volt power supply into the site
  • 1 x 500kVA generator
  • 4 x 200kVA UPS
  • Generator can operate on full occupancy for an initial 24 hours
  • Fuel replacement contract with multiple suppliers delivering a 10-hour SLA

Map and Nearby Locations

2 Opus Ave
iomart Sites
Nearby Facilities

iomart: DC11 York Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of iomart: DC11 York

Distance Site About
0.00 miles Bytemark YO26
2.45 miles Simulant: York
Located in the heart of York at Popeshead Court, the Simulant Data Center is a specialized, regional facility operated by Simulant Systems Ltd.
3.43 miles Deep Green: York DG02
Deep Green is building a data center in York, United Kingdom. The facility, known as DG02, is a modular data center located at the Monks Cross Leisure Park in Huntington.
16.91 miles C.C.S. DC14 - Leeds
17.14 miles Virgin Media Leeds (Temple House)
17.37 miles Drax: Selby Expansion
Drax Group is set to transform its historic Selby Power Station in North Yorkshire into a massive digital infrastructure hub, leveraging legacy infrastructure to meet the booming power demands of artificial intelligence.
17.69 miles Drax: Selby Campus
Drax Group is set to transform its historic Selby Power Station in North Yorkshire into a massive digital infrastructure hub, leveraging legacy infrastructure to meet the booming power demands of artificial intelligence.
17.77 miles Stellanor: Harrogate
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
18.51 miles Center MaxInterested in this information?Contact us
Microsoft is proposing to develop a new UK data center campus on the site of a decommissioned power station in Eggborough, North Yorkshire. Microsoft aims to build two two-story data centers on part of the former Eggborough power station.

iomart: DC11 York Data Center Photos See all

Operating Company

Operated by:

iomart Group is a Scottish information technology and cloud computing company that was founded in 1998 by entrepreneur Angus MacSween. The group takes its name from a derivation of the Gaelic word iomairt meaning enterprise.

13
Facilities
9
Markets
14MW
Megawatts

News See all

Read Iomart Reports Revenues Of £55.1m and announces Manchester Data Centre
Iomart Reports Revenues Of £55.1m and announces Manchester Data Centre

Iomart Reports Revenues Of £55.1m and announces Manchester Data Centre

November 28, 2019 iomart

Iomart is in the final planning phases for the investment in the Manchester datacentre acquired with the LDeX acquisition. The company plans to obtain an official Tier 3 certification for the Manchester facility. The facility is 10,000 sqft.The cloud computing company reported its consolidated...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?