Yondr: Johor

Latest Podcast Sedenak Tech Park
OperationalPlanned
Operational with future phases planned
Operated by:

Yondr: Johor

Year Built: 2025
Lot Size: 73 acres
░░░░ Request Dataset MW
Total Power

Yondr Group, a data center firm, has launched its Johor data center in Malaysia, with the first phase becoming operational six months ahead of schedule.

Yondr has secured over $900 million in financing for the campus on 72.8 acres of land in Johor’s Sedenak Tech Park, Malaysia.

Map and Nearby Locations

Sedenak Tech Park
Yondr Group Sites
Nearby Facilities

Yondr: Johor Power Growth Over Time

+292% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Yondr: Johor

Distance Site About
0.15 miles Bridge Kidex Sedenak MY06-01
0.24 miles Bridge MY06-02
This hyperscale campus is strategically located within Kidex Sedenak, the jewel component of the larger 7,290 acres of the Sedenak Technology Valley.
0.29 miles K2: Kulai Expansion
0.32 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Keppel DC is expanding its data center footprint in Sedenak Tech Park, on 25 acres of land.
0.34 miles BrightRay: MY-03
This facility will be part of BrightRay's Sedenak Tech Park Campus in Johor.
0.35 miles BrightRay: Johor MY-01
In 2025, Malaysian pre-fab data center specialist BrightRay officially opened its first facility in Johor.
0.37 miles K2: Kulai JHR04
0.40 miles BrightRay: MY-02
This facility will be part of BrightRay's Sedenak Tech Park Campus in Johor.
0.43 miles Keppel DC: Johor Sedenak 1
0.44 miles Princeton PDG: JH1 Bldg-2
This facility is part of Princeton PDG's JH1 Campus in Johor.
0.46 miles Princeton PDG: JH1 Campus
Occupying 128,000 m² of land, JH1 is a carrier-neutral site featuring a design PUE of ≤1.4. The campus will consist of four buildings, the first of which successfully came online in July 2024. https://princetondg.com/malaysia/jh1/
0.49 miles K2: Kulai JHR01-03
K2 Data Centres ("K2") is building a hyperscale data center campus at Sedenak Tech Park in Johor.
0.56 miles Princeton PDG: JH1 Bldg-4
PDG has started construction of the third building of its JH1 campus.
0.58 miles Princeton PDG: JH1 Bldg-3
PDG successfully topped out the third building of its JH1 campus in late 2025.
0.78 miles GDC SDN: Johor SDK1
Global Data Centre Sdn. Bhd. (GDC) has officially broken ground on GDC-SDK1, a high density AI data center located in Johor’s Sedenak Tech Park.
8.76 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Keppel DC is building a massive data center campus on a 50-acre plot of land in Kulai, Johor.
9.46 miles YTL: JDC3
This facility is a part of YTL's Johor campus in Malaysia.
9.50 miles YTL: JDC6
This facility is a part of YTL's Johor campus in Malaysia.
9.50 miles YTL Johor
YTL Green Data Center Park, the region's first solar-powered data center park spanning 275 acres, is located in Johor, Malaysia.
9.53 miles YTL: JDC2
This facility is a part of YTL's Johor campus in Malaysia.
10.68 miles PrimeInterested in this information?Contact us
Microsoft has acquired 123 acres of land in Kulai, Johor, Malaysia for data center development. The plot, located in Eco Business Park VI in Senai, was purchased from EcoWorld's subsidiary for RM402.3 million ($85.2m).
13.35 miles Core CenterInterested in this information?Contact us
16.24 miles Park MaxInterested in this information?Contact us
16.68 miles Global Switch: Johor
Global Switch plans to build a data center campus in Johor, Malaysia.
16.68 miles CURRENC: Johor
Fintech holding company CURRENC Group is venturing into data center development with a new facility in Johor, Malaysia.
16.68 miles EdgeConneX: Johor
EdgeConneX is building a huge data center campus in Johor, Malaysia.
19.26 miles ZData: Johor
Tropicana Corporation Berhad's subsidiary, Tropicana Firstwide Sdn Bhd, has entered into a land sale agreement with ZData's Malaysian unit, Computility Technology (Malaysia) Sdn Bhd.
19.84 miles Princeton PDG: JH2
PDG's JH2 data center is strategically positioned in Johor's Eco Business Park at Mukim Senai, just 30 km from the company's existing JH1 campus in Sedenak Tech Park.
19.85 miles NTT: Gelang Patah
NTT Data aims to develop a six buildings campus on a 68.5-acre parcel of land in Gelang Patah, Johor Bahru.
19.97 miles Stack: Johor JHB01
STACK's flagship Johor Bahru campus spans 10.8 hectares and will feature two facilities totaling around 1 million square feet, designed to support cloud and AI/ML workloads.

Yondr: Johor Data Center Photos See all

Yondr's Johor Data Center in Malaysia
Source: Yondr

Operating Company

Operated by:

Yondr is a data center developer and operator that builds and operates dedicated capacity for hyperscale cloud and technology clients. The company’s markets include Northern Virginia and Toronto in the Americas; London, Frankfurt, Amsterdam, and Berlin in Europe; and Johor, Jakarta, and Tokyo in Asia.

DigitalBridge and La Caisse completed the acquisition of Yondr on July 1, 2025. Yondr exited its EverYondr joint venture in India later that month.

Yondr History:

  • In July 2025, DigitalBridge and La Caisse completed the acquisition of Yondr Group.
  • In July 2025, Yondr exited the EverYondr joint venture in India, selling its stake to Everstone Group.
  • In July 2021, Yondr and Everstone announced the EverYondr joint venture to develop and operate data centers in India.
  • 2019: Founded.
15
Facilities
8
Markets

News See all

Read Yondr and JK Land Holdings Secure $715m for Virginia Data Center Expansion
Yondr Group and JK Land Holdings have secured $715 million through a private offering of 6.875 percent senior secured notes due 2031 to finance the development of their Virginia data center campus....

Yondr and JK Land Holdings Secure $715m for Virginia Data Center Expansion

June 25, 2026 Yondr Group

Yondr Group and JK Land Holdings have secured $715 million through a private offering of 6.875 percent senior secured notes due 2031 to finance the development of their Virginia data center campus. The notes, issued by Yondr JK 1, LLC, will be sold to qualified institutional buyers. Proceeds will...

Read more
Read Yondr Brings 27MW Toronto Data Center Online
Yondr Brings 27MW Toronto Data Center Online

Yondr Brings 27MW Toronto Data Center Online

April 22, 2026 Yondr Group

Data center firm Yondr has energized its facility in Toronto, Canada. DigitalBridge-owned Yondr Group this week powered up the 27MW data center, which is expected to be ready for service in mid-2026. The project marks Yondr’s first development in Canada. Announced in 2024, construction on the...

Read more
Read Yondr Expands into Texas with 550MW Facility
Yondr Expands into Texas with 550MW Facility

Yondr Expands into Texas with 550MW Facility

August 20, 2025 Yondr Group

Data center developer Yondr Group this week announced it has secured a 163-acre site in Lancaster, Texas, just south of Dallas, to develop a data center campus able to offer 550MW critical IT load.“The US is a key market for Yondr’s next phase of growth, and Dallas is one of the largest and...

Read more
Read Allianz Acquires Stake in Yondr
Allianz Acquires Stake in Yondr

Allianz Acquires Stake in Yondr

July 16, 2025 Yondr Group

Allianz Global Investors (AllianzGI) has announced tthat its subsidiary Allianz Capital Partners GmbH has acquired a minority stake in Yondr Group, joining DigitalBridge and La Caisse (formerly CDPQ) as investors in the firm. The stake was acquired on behalf of the Allianz insurance companies and...

Read more
Read Yondr Completes 40MW Frankfurt Data Center
Yondr Completes 40MW Frankfurt Data Center

Yondr Completes 40MW Frankfurt Data Center

July 12, 2025 Yondr Group

Data center firm Yondr Group this week announced that its 40MW data center in Bischofsheim, just south of Frankfurt, is now fully operational. The site includes a solar photovoltaic (PV) installation on the roof, a green wall, and electric vehicle charging points. Yondr said it has also completed...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?