Bridge Data Centres in Discussions Over $6bn Loan
March 23, 2026
Bridge Data Centres
This hyperscale campus is strategically located within Kidex Sedenak, the jewel component of the larger 7,290 acres of the Sedenak Technology Valley. The largest of its kind in Malaysia, approximated at 40 acres of land area, our hyperscale campus spans three buildings
| Distance | Site | About |
|---|---|---|
| 0.10 miles | Bridge Kidex Sedenak MY06-01 |
|
| 0.13 miles | Carrier-Neutral Data Center Request Dataset |
Keppel DC is expanding its data center footprint in Sedenak Tech Park, on 25 acres of land.
|
| 0.20 miles | Keppel DC: Johor Sedenak 1 |
|
| 0.24 miles | Yondr: Johor |
Yondr Group, a data center firm, has launched its Johor data center in Malaysia, with the first phase becoming operational six months ahead of schedule.
|
| 0.29 miles | K2: Kulai JHR04 | |
| 0.31 miles | K2: Kulai Expansion | |
| 0.34 miles | K2: Kulai JHR01-03 |
K2 Data Centres ("K2") is building a hyperscale data center campus at Sedenak Tech Park in Johor.
|
| 0.49 miles | Princeton PDG: JH1 Bldg-2 |
This facility is part of Princeton PDG's JH1 Campus in Johor.
|
| 0.54 miles | BrightRay: Johor MY-01 |
In 2025, Malaysian pre-fab data center specialist BrightRay officially opened its first facility in Johor.
|
| 0.54 miles | Princeton PDG: JH1 Campus |
Occupying 128,000 m² of land, JH1 is a carrier-neutral site featuring a design PUE of ≤1.4. The campus will consist of four buildings, the first of which successfully came online in July 2024.
https://princetondg.com/malaysia/jh1/
|
| 0.55 miles | BrightRay: MY-03 |
This facility will be part of BrightRay's Sedenak Tech Park Campus in Johor.
|
| 0.59 miles | Princeton PDG: JH1 Bldg-4 |
PDG has started construction of the third building of its JH1 campus.
|
| 0.60 miles | BrightRay: MY-02 |
This facility will be part of BrightRay's Sedenak Tech Park Campus in Johor.
|
| 0.63 miles | Princeton PDG: JH1 Bldg-3 |
PDG successfully topped out the third building of its JH1 campus in late 2025.
|
| 0.85 miles | GDC SDN: Johor SDK1 |
Global Data Centre Sdn. Bhd. (GDC) has officially broken ground on GDC-SDK1, a high density AI data center located in Johor’s Sedenak Tech Park.
|
| 8.57 miles | Carrier-Neutral Data Center Request Dataset |
Keppel DC is building a massive data center campus on a 50-acre plot of land in Kulai, Johor.
|
| 9.37 miles | YTL: JDC3 |
This facility is a part of YTL's Johor campus in Malaysia.
|
| 9.40 miles | YTL: JDC6 |
This facility is a part of YTL's Johor campus in Malaysia.
|
| 9.40 miles | YTL Johor |
YTL Green Data Center Park, the region's first solar-powered data center park spanning 275 acres, is located in Johor, Malaysia.
|
| 9.43 miles | YTL: JDC2 |
This facility is a part of YTL's Johor campus in Malaysia.
|
| 10.50 miles | Hyperscale Data Center Request Dataset |
Microsoft has acquired 123 acres of land in Kulai, Johor, Malaysia for data center development. The plot, located in Eco Business Park VI in Senai, was purchased from EcoWorld's subsidiary for RM402.3 million ($85.2m).
|
| 13.17 miles | Hyperscale Data Center Request Dataset | |
| 16.16 miles | Hyperscale Data Center Request Dataset |
|
| 16.60 miles | CURRENC: Johor |
Fintech holding company CURRENC Group is venturing into data center development with a new facility in Johor, Malaysia.
|
| 16.60 miles | EdgeConneX: Johor |
EdgeConneX is building a huge data center campus in Johor, Malaysia.
|
| 16.60 miles | Global Switch: Johor |
Global Switch plans to build a data center campus in Johor, Malaysia.
|
| 19.21 miles | ZData: Johor |
Tropicana Corporation Berhad's subsidiary, Tropicana Firstwide Sdn Bhd, has entered into a land sale agreement with ZData's Malaysian unit, Computility Technology (Malaysia) Sdn Bhd.
|
| 19.69 miles | Princeton PDG: JH2 |
PDG's JH2 data center is strategically positioned in Johor's Eco Business Park at Mukim Senai, just 30 km from the company's existing JH1 campus in Sedenak Tech Park.
|
| 19.81 miles | NTT: Gelang Patah |
NTT Data aims to develop a six buildings campus on a 68.5-acre parcel of land in Gelang Patah, Johor Bahru.
|
| 19.95 miles | Stack: Johor JHB01 |
STACK's flagship Johor Bahru campus spans 10.8 hectares and will feature two facilities totaling around 1 million square feet, designed to support cloud and AI/ML workloads.
|
| 19.99 miles | Stack: JHB01B |
This facility is a part of Stack Infrastructure's Johor Campus in Malaysia.
|
Bain Capital merged ChinData with Bridge Data Centres in 2019; the combined company operates as ChinData within China and Bridge across the rest of Asia.
Bridge Data Centres Malaysia Sdn Bhd (formerly known as CSF CX Sdn Bhd) was incorporated on 27 September 2007. Bridge Data Centres Malaysia Sdn Bhd was acquired by Bridge Data Centres Malaysia Holdings Sdn Bhd in November 2017, which in turn is a wholly owned subsidiary of BDC (Malaysia) Holdco Pte. Ltd, Bridge Data Centres is founded by Michael Foust and Kris Kumar who collectively have more than 50 years experience investing in, conceptualizing, designing, building and operating high quality data centre facilities, with best-in-class operating and maintenance procedures to ensure the highest level of uptime and reliability. (Source: Bridge Data Centres About Us)
March 23, 2026
Bridge Data Centres
March 13, 2026
Bridge Data Centres
October 17, 2025
Bridge Data Centres
August 18, 2024
Bridge Data Centres
May 31, 2024
Bridge Data Centres
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas