Africa Data Centres secures $109 million in financing
June 17, 2024
Africa Data Centres
| Distance | Site | About |
|---|---|---|
| 0.56 miles | Vantage Johannesburg |
The campus sits on 30 acres (12 hectares) and will feature three data centers at full build-out.
|
| 0.60 miles | Vantage: JNB12 |
This data center building is a part of Vantage's Johannesburg I campus in South Africa.
|
| 0.65 miles | Vantage: JNB13 |
This data center building is a part of Vantage's Johannesburg I campus in South Africa.
|
| 5.66 miles | ADC Samrand JHB2 |
ADC´s JHB2 Samrand Data Centre is a former Standard Bank data centre
|
| 5.89 miles | xneelo JNB1 Samrand |
|
| 6.01 miles | Cosmas Data City – Samrand |
The Cavaleros Group, a South African real estate firm, is expanding into the data centre sector with its new division, Cosmas Data Cities (CDC).
|
| 6.11 miles | NTT Johannesburg 1 |
|
| 6.11 miles | Digital Parks Africa: Samrand |
DPA is adding 810 sqm (8,720 sq ft) and 570 racks to its existing Centurion facility, which currently features over 1,620 sqm of dedicated whitespace.
|
| 6.52 miles | Hyperscale Data Center Request Dataset |
Microsoft plans to construct an expansive data centre campus in Kosmosdal area of the city, to the south of Pretoria. Microsoft will be the first US cloud provider to enter in South Africa.
|
| 9.40 miles | Teraco JB4 |
Located in South Africa, the JB4 facility spans 80,000 sqm (861,110 sq ft) and features 14 data halls which comprise 17,000 sqm (182,985 sq ft) of space.
|
| 9.99 miles | OADC: Isando |
Pan-African operator Open Access Data Centres (OADC) launched its Johannesburg data center in December 2022.
|
| 9.99 miles | Teraco JB5 |
Teraco, a South African data centre operator, launched its JB5 facility in 2025.
|
| 10.05 miles | Telehouse Johannesburg |
|
| 10.05 miles | Teraco Johannesburg JB1 |
|
| 10.07 miles | Teraco JB3 |
Teraco's JB3 facility spans 45,000 square metres of building structure, including 12,000 square metres of data white space.
|
| 10.76 miles | Internet Solutions Johannesburg 158 Jan Smuts | |
| 10.90 miles | Teraco Bredell Campus (JB2) |
|
| 11.11 miles | Vantage: Johannesburg II |
The first building of the JNB2 Islando campus consists of a 355,000 square foot (33,000 square meters) two-story data center. This is Vantage Data Centers' second campus in Johannesburg, South Africa.
|
| 11.28 miles | Equinix Johannesburg JN1 |
June 17, 2024
Africa Data Centres
November 22, 2023
Johannesburg
October 13, 2023
Johannesburg
May 23, 2023
Africa Data Centres
May 21, 2023
Africa Data Centres
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas