5.82 miles
|
Rogers Vancouver VAN DC1
|
|
|
5.82 miles
|
Hut 8: Vancouver DC
|
Hut 8 acquired the facility as part of its purchase of TeraGo's data center business. The acquisition was announced in January 2022 and closed in the first quarter of 2022.
|
|
5.83 miles
|
Cologix VAN2
|
Cologix VAN2 sits a few blocks from Harbour Centre in downtown Vancouver and connects to the city's primary carrier hotel over a dark fiber ring.
|
|
5.87 miles
|
Ntirety Vancouver
|
Former Hostway hosting site at 550 Burrard Street in downtown Vancouver, later carried under the Ntirety brand.
|
|
5.96 miles
|
Hut 8: Vancouver Vault DC
|
The Hut 8 Vancouver Vault is a Tier 1 data center facility located in downtown Vancouver.
|
|
6.01 miles
|
Telus: 150 West Georgia
|
TELUS is tied to a planned downtown Vancouver AI data center at 150 West Georgia Street. The site is a Westbank/Allied project near BC Place and is expected to use district energy integration for heat recovery.
|
|
6.03 miles
|
TNW Vancouver Waterfront Centre
|
|
|
6.03 miles
|
PureColo Vancouver
|
Retail colocation facility in Vancouver, British Columbia, operated by PureColo, the operating arm of Carrier Connect Data Solutions. Capacity is sold by the cabinet.
|
|
6.12 miles
|
Cologix VAN5
|
Cologix VAN5 occupies two suites in Harbour Centre, Vancouver's primary carrier hotel, and was formerly Cyxtera's YVR1.
|
|
6.12 miles
|
Cologix VAN1
|
Cologix VAN1 occupies two suites in Harbour Centre, the 555 West Hastings Street tower that serves as Vancouver's primary carrier hotel.
|
|
6.12 miles
|
eStruxture VAN2
|
eStruxture VAN-2 is a colocation suite on the 21st floor of Harbour Centre, Vancouver's primary carrier hotel at 555 West Hastings Street.
|
|
6.12 miles
|
TNW Vancouver Granville Square
|
|
|
6.13 miles
|
Vancouver Spencer Building
|
The Spencer Building Carrier Hotel in downtown Vancouver's Harbour Centre Complex provides western Canada with added connectivity and data center space.
|
|
6.24 miles
|
Cologix VAN4
|
Cologix's VAN4 occupies four floors of the Unitel Building in Vancouver's Gastown, a long-standing interconnection facility that Cologix acquired from Zayo in 2021.
|
|
6.29 miles
|
eStruxture Vancouver VAN1
|
Formerly known as the Backbone Data Vault, eStruxture acquired the site in 2018.
|
|
6.37 miles
|
Telus: M3 Vancouver
|
TELUS plans a Mount Pleasant AI Factory in the M3 building at 111 East 5th Avenue, a Westbank-led conversion of an existing office building that is awaiting rezoning.
|
|
6.53 miles
|
Atlas Cloud Vancouver
|
Atlas Cloud markets colocation from a small facility at 308 East 5th Avenue in Vancouver's Mount Pleasant neighbourhood, linked by fibre to Harbour Centre.
|
|
6.69 miles
|
Uniserve: Vancouver 1
|
Uniserve operates a data centre in the Vantech Centre at 333 Terminal Avenue in Vancouver, next door to its planned AI data centre at 369 Terminal Avenue.
|
|
6.75 miles
|
Uniserve: Vancouver 2
|
Uniserve is fitting out an AI-focused data centre of about 10,000 square feet at 369 Terminal Avenue in Vancouver's False Creek Flats.
|
|
9.63 miles
|
Cologix Vancouver VAN3
|
Cologix VAN3 is a two-storey, purpose-built data center in East Vancouver's Renfrew-Collingwood area, opened in September 2019 in a converted industrial building.
|
|
9.65 miles
|
Cologix VAN6
|
Cologix VAN6 is a three-storey data center under construction at 3448 Cornett Road (formerly 2772 Natal Street) in East Vancouver, next to Cologix VAN3.
|
|
9.66 miles
|
TrueNorth: Vancouver
|
TrueNorth Sustainable Infrastructure is converting the east building of a former bakery complex at 3438 Lougheed Highway in East Vancouver into a high-density data centre.
|
|
10.48 miles
|
Equinix Vancouver VA1
|
Equinix VA1 is a small colocation facility in a leased two-storey building on Still Creek Drive in Burnaby, acquired with Bell Canada's data center portfolio in 2020.
|
|
11.11 miles
|
eStruxture VAN-3 Burnaby
|
eStruxture VAN-3 is a high-density data center under construction in a converted 55,000-square-foot building on Canada Way in Burnaby, designed for liquid-cooled AI racks.
|
|
15.17 miles
|
SFU: Water Tower Building
|
Simon Fraser University's Water Tower Building data centre on Burnaby Mountain hosts Fir, the national research supercomputer that replaced Cedar in 2025.
|
|
18.04 miles
|
Canadian Web Hosting: Coquitlam
|
Canadian Web Hosting operates a custom-built data centre at 1478 Hartley Avenue in Coquitlam for its hosting, cloud and colocation services.
|