Operated by: Tract
Tract is planning a large new data center park in Eagle Mountain, Utah. The company has completed the acquisition of more than 668 acres of land in Eagle Mountain. Tract said it is working with Rocky Mountain Power to deliver more than 400MW via new transmission infrastructure by 2028. Site location, along with potential building number and specifications, haven’t been shared.
Distance | Site | About |
---|---|---|
3.45 miles | Facebook Eagle Mountain Utah |
The Facebook datacenter will be a 970,000 square foot building, located in northern Utah County, at the Sweetwater Industrial Park in Eagle Mountain, Utah.
|
8.64 miles | NSA Utah Data Center |
|
12.61 miles | DataBank SLC3 | |
12.66 miles | DataBank SLC6 |
|
12.67 miles | DataBank Bluffdale Granite Point Campus |
DataBank’s Granite Point West Data Center is strategically located in Bluffdale, UT, minutes from downtown Salt Lake City. With a carrier-neutral design, the 95,000 sqft building has over 55,000 sqft of raised-floor space for customer equipment and offers network connectivity to multiple Tier 1 and Tier 2 providers. Diverse substations provide more than 11MW of high-density power, while redundant cooling systems maintain optimal temperatures for data center equipment.
|
12.67 miles | DataBank SLC2 |
T
he facility has access to more than 8MW of high-density power, and redundant cooling systems maintain optimal temperatures for data center equipment. Situated in a highly secure technology park, the facility is protected by a full perimeter fence encompassing the building, parking areas, loading docks, and all customer entrances. |
12.74 miles | DataBank SLC4 | |
12.75 miles | C7 Lindon (Timpanogos) | |
12.75 miles | DataBank SLC5 | |
13.16 miles | Edged Energy: Bluffdale, UT |
Two buildings are planned for the site
|
14.74 miles | Flexential Salt Lake (Lindon) |
|
17.15 miles | Voonami Orem SLC1 | |
17.40 miles | eBay South Jordan Topaz |
The first phase of eBay's Topaz project is a 240,000 square foot building housing three 20,000 square foot data center halls
|
17.61 miles | Aligned: SLC05 | |
17.66 miles | Fibernet ORM1 |
|
18.29 miles | Novva South Jordan Campus |
|
18.60 miles | Aligned SLC-03 |
|
18.71 miles | Aligned SLC-02 |
Aligned's SLC-02 Data Center is located in West Jordan, Utah. This is the second building of Aligned's Salt Lake City data center campus with 48MW capacity.
|
18.89 miles | Aligned Salt Lake City |
Situated on 55 acres, including a dedicated on-site substation, the former Fairchild Semiconductor chip fabrication facility is being renovated to become a colocation data center delivering 34 MW of critical capacity.
|
19.83 miles | XO: 8871 South Sandy |
Tract is a data center land acquisition and development company led by an experienced team of data center experts. We are a trusted long-term partner for developers, hyperscalers, municipalities and land sellers. Sustainability, connectivity, and a community-first approach are at the heart of everything we do.