0.34 miles
|
TPA Group: Social Circle 1
|
First planned building of TPA Group's Social Circle Technology Park, a nine-building data center campus off SR 11 in Social Circle, Georgia.
|
|
1.37 miles
|
TPA Group: Strouds Creek
|
Georgia Historic Heartland Megasite, a planned data center park of about 981 acres off Lakewood Drive in Social Circle, Georgia, with 12 one-story buildings. The city approved it in November 2025; the state decertified Social Circle over the annexation in 2026.
|
|
1.64 miles
|
WSG Land: Project Axis
|
Entitled data center tract of about 221 acres on Mill Road in Social Circle, Georgia, owned by WSG Land and marketed by 3Rivers Development as Project Axis. The city granted a data center special-use permit in September 2025; no end user has been named.
|
|
1.98 miles
|
Hub OneInterested in this information?Contact us
|
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
|
|
1.99 miles
|
South PointInterested in this information?Contact us
|
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
|
|
2.42 miles
|
Prime HubInterested in this information?Contact us
|
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
|
|
2.52 miles
|
Ridge ThreeInterested in this information?Contact us
|
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
|
|
2.63 miles
|
Metro StationInterested in this information?Contact us
|
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
|
|
3.44 miles
|
Dermody: Social Circle Expansion
|
Second through fourth planned data center buildings on Dermody Properties' 96-acre East Hightower Trail campus in Social Circle, Georgia, with a new on-site electrical substation.
|
|
3.58 miles
|
Dermody: Social Circle 1
|
First of four planned 250,000 sq ft data center buildings on Dermody Properties' 96-acre East Hightower Trail campus in Social Circle, Georgia. The city granted the data center special-use permit in November 2025.
|
|
4.27 miles
|
Sailfish: Social Circle 1
|
First planned building of Sailfish Investors' four-building data center campus at 1705 Amber Stapp Studdard Road in Social Circle, Georgia. The city approved the site in January 2025, but the project has stalled and local officials say it appears abandoned.
|
|
4.34 miles
|
WSG Land: Malcom Park
|
Entitled data center tract of about 235 acres on Fairplay Drive at Social Circle Parkway in Social Circle, Georgia, owned by WSG Land and marketed by 3Rivers Development as Malcom Park. It forms the western end of the Roy Malcom Road data center complex.
|
|
4.49 miles
|
Sailfish: Social Circle Expansion
|
Second through fourth planned buildings of Sailfish Investors' Social Circle, Georgia data center campus off Amber Stapp Studdard Road and Social Circle Parkway. The project has stalled and appears abandoned.
|
|
4.68 miles
|
Atlas Development: Social 4
|
Planned two-building data center on 123 acres at 1402 Roy Malcom Road in Social Circle, Georgia, the middle tract of Atlas Development's Roy Malcom Road complex. The city annexed and rezoned it for data center use in April 2026, with buildings limited to one story.
|
|
4.68 miles
|
Serverfarm: Covington, GA
|
The project involves converting an existing 498,960-square-foot warehouse/distribution facility situated on a 97-acre site at Hazelbrand Road.
|
|
4.94 miles
|
Atlas Development: Social 3
|
Building 3 of Atlas Development's planned data center campus on Roy Malcom Road in Social Circle, Georgia, on the Hawkins Academy tract approved for data center use in November 2025 with buildings limited to one story.
|
|
4.98 miles
|
Atlas Development: Social 2
|
Building 2 of Atlas Development's planned data center campus on Roy Malcom Road in Social Circle, Georgia, on the Hawkins Academy tract approved for data center use in November 2025 with buildings limited to one story.
|
|
5.02 miles
|
Atlas Development: Social 1
|
Building 1 of Atlas Development's planned data center campus on Roy Malcom Road in Social Circle, Georgia, on the Hawkins Academy tract approved for data center use in November 2025 with buildings limited to one story.
|
|
5.04 miles
|
Gregory 5
|
This facility is part of Universal Planning LLC's Gregory Road Data Center Campus in Covington.
|
|
5.06 miles
|
Gregory 4
|
This facility is part of Universal Planning LLC's Gregory Road Data Center Campus in Covington.
|
|
5.08 miles
|
Metro HubInterested in this information?Contact us
|
Amazon is developing a new data center campus on 430 acres in Covington, Georgia.
|
|
5.09 miles
|
PointInterested in this information?Contact us
|
This facility is part of Amazon's 430-acre data center campus near Alcovy Road in Covington.
|
|
5.12 miles
|
Gregory 1
|
Universal Planning LLC is proposing a data center campus, named the Gregory Road Data Center, in Covington, Newton County.
|
|
5.14 miles
|
Tower PrimeInterested in this information?Contact us
|
This facility is part of Amazon's 430-acre data center campus near Alcovy Road in Covington.
|
|
5.18 miles
|
Gregory 2
|
This facility is part of Universal Planning LLC's Gregory Road Data Center Campus in Covington.
|
|
5.22 miles
|
Gregory 3
|
This facility is part of Universal Planning LLC's Gregory Road Data Center Campus in Covington.
|
|
5.23 miles
|
Metro RidgeInterested in this information?Contact us
|
This facility is part of Amazon's 430-acre data center campus near Alcovy Road in Covington.
|
|
5.28 miles
|
West PointInterested in this information?Contact us
|
This facility is part of Amazon's 430-acre data center campus near Alcovy Road in Covington.
|
|
5.78 miles
|
CenterInterested in this information?Contact us
|
Amazon plans to expand its data center footprint in Covington.
|
|
18.56 miles
|
DC BLOX: ATL2-A
|
DC Blox, a US data center operator, has started construction on a new data center campus outside Atlanta, Georgia.
|
|
18.63 miles
|
DC BLOX: ATL2-C
|
This facility is a part of DC Blox's Atlanta East Campus in Rockdale County, GA.
|
|
18.64 miles
|
DC BLOX: ATL2-D
|
This facility is a part of DC Blox's Atlanta East Campus in Rockdale County, GA.
|
|
18.71 miles
|
DC BLOX: ATL2-B
|
DC BLOX: ATL2-B is one of the expansion buildings at DC BLOX's Atlanta East hyperscale campus in Conyers, Rockdale County, about 24 miles east of downtown Atlanta. The 72-acre campus is designed for about 748,000 sq ft across four data center buildings at full buildout, targeting Uptime Tier 3.
|
|
18.88 miles
|
Strategic Real Estate Partners, Conyers, GA
|
Strategic Real Estate Partners plans to build a three-building data center campus in Conyers, a suburb about 20 miles southeast of Atlanta. The site will feature 837,500 sq ft (77,806 sqm) of data center space across three buildings.
|