WSG Land: Project Axis

Land Bank
Land secured for future development
Operated by: WSG Land, LLC

WSG Land: Project Axis

Lot Size: 221 acres

WSG Land, LLC owns about 221 acres on Mill Road in Social Circle, Newton County, Georgia, which 3Rivers Development markets as Project Axis (about 268 acres including adjoining land).

  • Approvals: The city granted a data center special-use permit on September 16, 2025. A related annexation on Cannon Drive was denied.
  • Plan: A 2024 3Rivers concept showed about 604,000 sq ft of data center space. No end user has been named.

Map and Nearby Locations

Mill Rd
WSG Land, LLC Sites
Nearby Facilities

Sites within 15 miles of WSG Land: Project Axis

Distance Site About
1.37 miles Campus AlphaInterested in this information?Contact us
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
1.46 miles Global ValleyInterested in this information?Contact us
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
1.58 miles Central HubInterested in this information?Contact us
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
1.64 miles TPA Group: Social Circle Expansion
1.69 miles HubInterested in this information?Contact us
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
1.80 miles Central TowerInterested in this information?Contact us
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
1.92 miles Dermody: Social Circle Expansion
Second through fourth planned data center buildings on Dermody Properties' 96-acre East Hightower Trail campus in Social Circle, Georgia, with a new on-site electrical substation.
1.97 miles TPA Group: Social Circle 1
First planned building of TPA Group's Social Circle Technology Park, a nine-building data center campus off SR 11 in Social Circle, Georgia.
2.07 miles Dermody: Social Circle 1
First of four planned 250,000 sq ft data center buildings on Dermody Properties' 96-acre East Hightower Trail campus in Social Circle, Georgia. The city granted the data center special-use permit in November 2025.
2.15 miles TPA Group: Strouds Creek
Georgia Historic Heartland Megasite, a planned data center park of about 981 acres off Lakewood Drive in Social Circle, Georgia, with 12 one-story buildings. The city approved it in November 2025; the state decertified Social Circle over the annexation in 2026.
2.95 miles Sailfish: Social Circle 1
First planned building of Sailfish Investors' four-building data center campus at 1705 Amber Stapp Studdard Road in Social Circle, Georgia. The city approved the site in January 2025, but the project has stalled and local officials say it appears abandoned.
3.13 miles Sailfish: Social Circle Expansion
Second through fourth planned buildings of Sailfish Investors' Social Circle, Georgia data center campus off Amber Stapp Studdard Road and Social Circle Parkway. The project has stalled and appears abandoned.
3.20 miles WSG Land: Malcom Park
Entitled data center tract of about 235 acres on Fairplay Drive at Social Circle Parkway in Social Circle, Georgia, owned by WSG Land and marketed by 3Rivers Development as Malcom Park. It forms the western end of the Roy Malcom Road data center complex.
3.50 miles Atlas Development: Social 4
Planned two-building data center on 123 acres at 1402 Roy Malcom Road in Social Circle, Georgia, the middle tract of Atlas Development's Roy Malcom Road complex. The city annexed and rezoned it for data center use in April 2026, with buildings limited to one story.
3.75 miles Atlas Development: Social 3
Building 3 of Atlas Development's planned data center campus on Roy Malcom Road in Social Circle, Georgia, on the Hawkins Academy tract approved for data center use in November 2025 with buildings limited to one story.
3.81 miles Atlas Development: Social 2
Building 2 of Atlas Development's planned data center campus on Roy Malcom Road in Social Circle, Georgia, on the Hawkins Academy tract approved for data center use in November 2025 with buildings limited to one story.
3.89 miles Atlas Development: Social 1
Building 1 of Atlas Development's planned data center campus on Roy Malcom Road in Social Circle, Georgia, on the Hawkins Academy tract approved for data center use in November 2025 with buildings limited to one story.
6.25 miles Serverfarm: Covington, GA
The project involves converting an existing 498,960-square-foot warehouse/distribution facility situated on a 97-acre site at Hazelbrand Road.
6.40 miles Gregory 5
This facility is part of Universal Planning LLC's Gregory Road Data Center Campus in Covington.
6.43 miles Gregory 4
This facility is part of Universal Planning LLC's Gregory Road Data Center Campus in Covington.
6.45 miles Gregory 1
Universal Planning LLC is proposing a data center campus, named the Gregory Road Data Center, in Covington, Newton County.
6.54 miles Gregory 2
This facility is part of Universal Planning LLC's Gregory Road Data Center Campus in Covington.
6.54 miles Central HubInterested in this information?Contact us
This facility is part of Amazon's 430-acre data center campus near Alcovy Road in Covington.
6.55 miles Center TwoInterested in this information?Contact us
Amazon is developing a new data center campus on 430 acres in Covington, Georgia.
6.59 miles Gregory 3
This facility is part of Universal Planning LLC's Gregory Road Data Center Campus in Covington.
6.60 miles Ridge GammaInterested in this information?Contact us
This facility is part of Amazon's 430-acre data center campus near Alcovy Road in Covington.
6.69 miles Point BetaInterested in this information?Contact us
This facility is part of Amazon's 430-acre data center campus near Alcovy Road in Covington.
6.74 miles South CenterInterested in this information?Contact us
This facility is part of Amazon's 430-acre data center campus near Alcovy Road in Covington.
7.10 miles Hub UltraInterested in this information?Contact us
Amazon plans to expand its data center footprint in Covington.
19.99 miles DC BLOX: ATL2-A
DC Blox, a US data center operator, has started construction on a new data center campus outside Atlanta, Georgia.

WSG Land: Project Axis Data Center Photos See all

Map produced by TAG, the Technology Association of Georgia.
Map of Georgia's Data Centers
Source: Baxtel

Map produced by TAG, the Technology Association of Georgia.

Operating Company

Operated by: WSG Land, LLC
0
Facilities
0
Markets

News See all

Read Equifax to Decommission Data Center outside Atlanta
Equifax to Decommission Data Center outside Atlanta

Equifax to Decommission Data Center outside Atlanta

September 12, 2025 Atlanta

The City of Alpharetta last week announced that Equifax was investing $25 million to expand its Alpharetta campus, located in Fulton County. The expansion includes the renovation of the third floor of the JV White 1 building, converting it from a data center into collaborative office space. “The...

Read more
Read Atlanta City Council members propose new bill to block data center developments
Atlanta City Council members propose new bill to block data center developments

Atlanta City Council members propose new bill to block data center developments

May 10, 2024 Atlanta

Atlanta City Councilmen Jason Dozier and Matt Westmoreland have introduced bills to block data center developments around certain areas of the Georgia city near transit stops and the Beltline. “Excited to introduce legislation alongside Matt Westmoreland to address the rapid growth of data...

Read more
Read Edged Energy begins work on Atlanta data center
Edged Energy begins work on Atlanta data center

Edged Energy begins work on Atlanta data center

July 04, 2023 Atlanta

Construction on Edge Energy's Atlanta, Georgia data center is underway, with the company commencing work on July 1st. Located at Tilford Yard, the company bought the 158 acre-site back in July 2021; 70 acres will be dedicated to data center development. In January 2023, it filed a building permit...

Read more
Read NCR Resume Additional Services After a Ransomware Breach
NCR Resume Additional Services After a Ransomware Breach

NCR Resume Additional Services After a Ransomware Breach

April 28, 2023 Atlanta

After a ransomware assault caused a data center outage that disrupted its Aloha cloud-based services and Counterpoint apps, NCR is making progress toward restoring services. For the subset of CMC customers who were impacted by the incident, online ordering has resumed and NCR's Command Center...

Read more
Read A new data center is planned for Tilford Yard
A new data center is planned for Tilford Yard

A new data center is planned for Tilford Yard

January 23, 2023 Atlanta

According to reports, a new data center is planned for Tilford Yard, on Atlanta’s Westside, under the project name Edged. This announcement comes following the filing of a building permit for a nearly 210,000-square-foot, two-level data center.Further to this, records show that Endeavour, the...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?