Overview
Teesside covers Middlesbrough, Redcar, Stockton-on-Tees and Hartlepool in the North East of England. Its data centre history is short. HP opened a large enterprise facility at Wynyard Park in 2010, which DXC Technology still runs for government and corporate clients. Level 3 ran a network point of presence in central Middlesbrough until its building fell vacant in 2020. Since 2023, former steelworks and chemical sites have drawn plans for far larger campuses.
The Market Today
Teesworks plans The Foundry, a hyperscale campus on the former Redcar steelworks. The council approved its detailed design in August 2025, and BP dropped a competing hydrogen plant on the same land that December. No operator has signed. Sembcorp and Digital Reef won permission for a three-building campus at Wilton International in October 2026. Latos is building a small edge AI campus in Stockton, and Unity World runs a small colocation site near Marske.
Advantages
-
Land. Teesworks offers thousands of acres of cleared industrial land inside the Teesside Freeport.
-
Power. National Grid plans a 400 kV substation at Teesworks that delivers 1.44 GW by the end of 2029 and can grow to 3.2 GW. Wilton International runs its own private power network.
Challenges
-
Grid timing. The large campuses depend on the new substation, which is not due before 2029.
-
Thin retail market. Teesside has little colocation and no internet exchange.
Power and Policy
Northern Powergrid distributes electricity, and National Grid Electricity Transmission owns the high-voltage network. Private networks serve Teesworks and Wilton International. The North East AI Growth Zone covers sites in Northumberland and North Tyneside but not Teesside.