180-acre Data Center Set to be Built in Lyon Township, Michigan
January 22, 2026
Michigan
The proposed Solstice Data center in Allen Park is an "edge" facility designed to support low-latency AI applications for local industries like healthcare and automotive manufacturing. Located at 7500 Enterprise Drive, the project features a two-story, 53,000-square-foot data hall utilizing a closed-loop cooling system to avoid municipal water consumption.
While the developer promises up to $7.4 million in annual tax revenue and the creation of 25 permanent jobs, the project is currently postponed due to intense community opposition. Residents and local advocacy groups have raised significant concerns regarding noise pollution from the 12 backup diesel generators, potential hikes in utility rates, and the developer's overall transparency, leading the Planning Commission to mandate further technical studies before any construction can begin.
| Distance | Site | About |
|---|---|---|
| 4.26 miles | 123NET: DC5 | |
| 8.11 miles | Lumen Detroit 3 | |
| 8.15 miles | Quicken Loans | |
| 8.93 miles | Raeden: Detroit Carrier Hotel |
|
| 9.38 miles | Raeden: One Campus Martius |
OCM, one of two Raeden-managed connectivity hub sites in Detroit, offers colocation services in Downtown Detroit.
|
| 9.48 miles | MNSi Goyeau Data Centre |
|
| 11.63 miles | Online Tech Westland | |
| 11.95 miles | Panattoni: Detroit Expansion |
Panattoni’s "Project Cannoli" in Van Buren Township is a massive data center development planned for 282 acres between Haggerty and Hannan roads.
|
| 12.11 miles | Panattoni: Detroit, Michigan |
Panattoni’s "Project Cannoli" in Van Buren Township is a massive data center development planned for 282 acres between Haggerty and Hannan roads.
|
| 12.24 miles | US Signal: MI03 Bldg-2 |
US Signal is planning a 35,000-square-foot addition for Phases II and III of MI03 data center campus in Van Buren.
|
| 12.25 miles | US Signal: MI03 Bldg-3 |
US Signal is planning a 27,500-square-foot Phase IV, bringing the total MI03 Campus footprint to 87,500 square feet.
|
| 12.27 miles | US Signal: MI03 Detroit Metro |
US Signal currently operates a 25,000-square-foot facility on a 7.91-acre site in Van Buren.
|
| 12.28 miles | Hyperscale Data Center Request Dataset |
Google's 1 GW hyperscale campus developed by Panattoni on 282 acres in Van Buren Township, Michigan. Powered by DTE Energy under a 20-year agreement, with service starting December 2027 and full load by late 2028.
|
| 12.53 miles | Verizon: 21455 Melrose | |
| 12.53 miles | Nexcess Southfield | |
| 12.62 miles | US Signal: MI04 Southfield |
Located near M-10, M-39, and M-24, the Southfield, Michigan data center provides easy access for businesses located in the Greater Detroit area
|
| 12.74 miles | EdgeConneX Detroit |
Capable of 600+ watts per sq ft
Real-time branch circuit monitoring
|
| 13.78 miles | 123NET: DC3 | |
| 13.80 miles | ManagedWay Southfield |
|
| 13.80 miles | 123NET: DC2 | |
| 14.13 miles | ManagedWay Southfield SFJ1 | |
| 14.13 miles | 123.net DC1 |
Michigan-based Internet Service Provider (ISP) 123Net has completed a major expansion of its Detroit data center, the Southfield DC1.
|
| 14.17 miles | Mapletree: 19675 W Ten Mile | |
| 14.17 miles | 365 Detroit (DT1) |
The ST1 Detroit facility is located in Michigan’s Business Center
|
| 14.19 miles | Lumen Detroit I |
|
| 16.18 miles | Real Estate Data Center Request Dataset |
Metrobloks is developing an AI-ready, scalable, and sustainable data center in the Detroit metropolitan area, with live capacity scheduled for Q4 2027.
|
| 16.31 miles | Lumen: Detroit 4 | |
| 18.24 miles | Education Data Center Request Dataset |
The planned University of Michigan–Los Alamos “Michigan-SPARC” supercomputing campus, remains officially on the books but its future is increasingly uncertain.
|
| 18.35 miles | IronGate: Detroit, The Bunker |
|
| 19.39 miles | ManagedWay Troy 319 Executive | |
| 19.63 miles | ManagedWay Troy 600 Executive |
Solstice Data designs, develops, and operates sovereign, AI-ready data centers engineered to deliver high-performance compute at scale while integrating into local energy ecosystems. Utilizing a vertically integrated model that spans development through operations, the company provides tailored, build-to-suit solutions with flexible capital structuring and site-specific fit-outs.
Their facilities are characterized by advanced cooling, high-density racking, and low-latency architecture designed to support demanding HPC workloads and frontier model training. By prioritizing efficiency and sustainability, Solstice Data achieves industry-leading PUE metrics and renewable energy integration, leveraging a leadership team with experience delivering over 1GW of capacity to provide transparent, low-risk infrastructure solutions.
January 22, 2026
Michigan
December 18, 2025
Michigan
November 13, 2025
Michigan
September 26, 2025
Michigan
September 03, 2025
Michigan
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas